Page views this IP this session = 10 of 10 unsubscribed pagesDavyhulme Energy from Waste Plant
Davyhulme (Waste , Active, ) Location in the UK : Wales, Manchester Type of installation: Waste on/offshore: on Turbines :0 Capacity : 5.6 MW Approx Date of 1st power generation: 2011 planned
/YES
Sewage created by residents across Manchester is to be recycled to power about 500 homes in the city.
The £4.3m biomass (energy from waste) scheme, thought to be the first of its kind in the UK, is being tried out at waste water treatment plants at Davyhulme in Manchester.
The project has received funding from the government department Defra, through the Waste and Resources Action Programme (Wrap).
Thanks for the correction from Mike
This installation, owned and operated by UU is a sludge gas engine, not a "biomass" fuelled power station. It could be argued that sewage sludge is a biofuel, but the common interpretation of biomass is vegetation used as fuel - crops, wood, trees etc.
Relationship |
Company (For:
Davyhulme
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Davyhulme CHP at Davyhulme WWTW - A,C,D
|
Generator Type: |
Sewage gas (RO code = RR)
|
Scheme : |
RO
|
Generator ID: |
R00006RREN
|
Capacity: |
11600
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
2/1/1990
|
|
|
Applicant: |
United Utilities Water plc
|
Applicant Address: |
United Utilities Renewable Energy Dept
Thirlmere House
Lingley Mere
Great Sankey, Warrington
WA5 3LP
England
|
Address: |
Davyhulme Waste Water Treatment Works
Rivers Lane
Urmston
Manchester
M41 7JB
England
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|