Pentland Firth

Pentland Firth (Wave , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Pentland Firth, North Scotland    
Type of installation: Wave    on/offshore: off
Turbines :4  Capacity : 6 MW
Approx Date of 1st power generation:

/YES

 Comment

ScottishPower Renewable Energy Limited (hereafter referred to as “ScottishPower Renewables”) is proposing to develop a Demonstration Tidal Array (hereafter referred to as the ‘Tidal Array’) in the Pentland Firth. The proposed Tidal Array would have a capacity in the range of 10-20MW of renewable power for export to the grid and would contribute to meeting the Scottish Government’s targets of providing 50% of Scotland’s electricity generation from renewable sources by 2020.

The Tidal Array would consist of up to 20 submerged demonstration tidal streamgenerating devices. The candidate demonstration tidal device will be based on an existing 300kw prototype device that is currently undergoing a period of research, development and testing. It is envisaged that the existing prototype will be developed to provide a larger scale demonstration device, in terms of potential output (1-1.5MW).

The Pentland Firth fills and drains the North Sea twice a day - water flows of up to 3 million tons a second.

 Address

 Associated Companies.

Relationship Company (For: Pentland Firth )
OwnerMeygen
DeveloperMeygen
OperatorMeygen
AgentScottish Power Renewables

 DECC Data on this Project: Pentland Firth :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Inner Sound Phase 1A (MeyGen)     6 MW
Energy Type: Tidal Stream
County: Orkney Islands     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 2436 / B0899     District:
Applicant: Atlantis Resources     Application : (Go to search to find Application)
Site Address: Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
  KW1 4YL
County: Orkney Islands Region: Offshore
OS Coordinates: 335503 / 335503
Development Status: Operational
Application Submitted: 7/19/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/21/2015    
Generator Live 2/20/2017 This Record Last Updated: 11/6/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Inner Sound Phase 1B (Phase 2) (MeyGen)     28 MW
Energy Type: Tidal Stream
County: Orkney Islands     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4980 /     District:
Applicant: Atlantis Resources     Application : (Go to search to find Application)
Site Address: Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
  KW1 4YL
County: Orkney Islands Region: Offshore
OS Coordinates: 335503 / 335503
Development Status: Planning Permission Granted
Application Submitted: 7/19/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 11/15/2023
RO Banding (ROC/MWh) 2 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Pentland Firth: Wave :

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School