Loading
Page views this IP this session = 1 of 5 unsubscribed pagesHadyard Hill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Hadyard Hill Wind Farm (Wind , Active) Location in the UK : Scotland, South Ayrshire Type of installation: Wind on/offshore: on Turbines :52 Capacity : 120 MW Approx Date of 1st power generation: March 2006
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Hadyard Hill, Barr: The wind farm consists of 52 Siemens 2.3MW turbines giving an overall installed capacity of 119.5MW. The turbines have a 60-70metre hub height and a 82 metre rotor diameter. The wind farm is connected to the substation at Maybole by a 132kV wooden pole over head line.
Model: |
Siemens SWT 2.3
|
Start Speed: |
4.5
|
Capacity: |
2.3
|
Optimal Speed: |
25
|
Rotor Diameter: |
101
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
236
|
Web Page: |
http://tinyurl.com/simens2-3 |
Comment: |
|
Hadyard Hill Windfarm Old Dailly By Girvan Ayrshire KA26 9TH
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hadyard Hill extension 88 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3375 / B1277
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
EC00003118
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
22 |
Turbine Capacity: |
4 |
Height of Turbines: |
127 |
Calculated capacity: |
88 |
Site Address: |
Hadyard Hill
, east of Girvan
, South Ayrshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
227000 / 227000
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
4/22/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/30/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
11/21/2017 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hadyard Hill 120 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3109 / N00045W
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
03/01745/DEEM
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
52 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
119.6 |
Site Address: |
Hadyard Hill
, East of Girvan
, South Ayrshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
226478 / 226478
|
Development Status: |
Operational
|
Application Submitted: |
5/27/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/1/2006
|
|
|
Generator Live |
5/8/2006
|
This Record Last Updated: |
5/6/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hadyard Hill Windfarm - A,C
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00063SQSC
|
Capacity: |
99000
|
Status: |
Live
|
Accreditation Date: |
5/27/2003
|
|
|
Commission Date: |
11/1/2005
|
|
|
Applicant: |
SSE Generation Ltd
|
Applicant Address: |
Scottish Hydro Electric plc
Inveralmond House
200 Dunkeld Road
Perth
PH1 3AQ
Scotland
|
Address: |
Hadyard Hill Windfarm
Old Dailly
By Girvan
KA26 9TH
Scotland
|
Capacity: 243.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|