Sorry I found no matches, Please try again. 176
vid = 1954pws_id = 351612pws_id = 351612 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.142.255.23 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Eccleshall Biomass Energy

Eccleshall (Biomass , Active)

 General Information.

Location in the UK : Wales, Raleigh Hall, Stafford, ST21 6JL    
Type of installation: Biomass    on/offshore: on
Turbines :1  Capacity : 2.6 MW
Approx Date of 1st power generation: October 2007

/YES

 Comment

Eccleshall Biomass Limited: At the centre of this groundbreaking project is a 2.6 megawatt generator, fuelled by the energy crop "miscanthus", other energy crops and clean wood chip. The plant saves 1 tonne per hour of CO2 which would be emitted generating electricity from fossil fuel. Miscanthus is a non-invasive, sterile, perennial grass. It will be grown and harvested on local farms within a 25 mile radius of the Eccleshall Biomass Plant.

Residues from the plant will be in the form of ash at approx 1,100 tonnes per year (5% of fuel input) This will be used as fertiliser and spread on local farms.
RTB: Raleigh Hall / Talbotts Biomass Energy / BiEcc Ltd

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Eccleshall )

 DECC Data on this Project: Eccleshall :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Eccleshall: Biomass :

Project Info
Green plant to power up: ECCLESHALL
WORK on a green power plant is set to be completed within months. (2007)

The ECCLESHALL Biomass Story..
Case study of the development of a green power station

Tabotts Biomass Power

Staffordshire Biomass

ECCLESHALL Biomass

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School