Loading
Page views this IP this session = 1 of 10 unsubscribed pagesKelburn Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Kelburn Wind Farm (Wind , Active) Location in the UK : Scotland, SE Largs, NW Dalry Type of installation: Wind on/offshore: on Turbines :14 Capacity : 28 MW Approx Date of 1st power generation: May 2012
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Kelburn Wind Farm in North Ayrshire, Scotland. At 28MW the wind farm will deliver clean, green renewable electricity which is equivalent to the average needs of approximately 15,000 homes - 24% of the households in North Ayrshire. Kelburn Wind Farm Community Benefit Fund is now ready to start accept applications.
Model: |
Vestas V80
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
364
|
Web Page: |
|
Comment: |
|
Kelburn Wind Farm Kelburn Estate Fairlie KA24 5LE Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Kelburn 28 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: North Ayrshire Council
|
Site ID and Reference: |
3149 / N00113W
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
N/04/00786/PP
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
14 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
28 |
Site Address: |
Largs
North Ayrshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
224000 / 224000
|
Development Status: |
Operational
|
Application Submitted: |
7/9/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
2/26/2007
|
Construction Date: |
11/1/2010
|
|
|
Generator Live |
5/2/2012
|
This Record Last Updated: |
5/3/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
2/26/2007 |
Capacity: 56 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|