Page views this IP this session = 1 of 10 unsubscribed pagesAmbleston Solar Farm
Ambleston Solar Farm (Solar , Active) Location in the UK : Wales, Ambleston, Haverfordwest, Dyfed, SA61 Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 6 MW Acreage:1 or approx Hectares : 0.4 Approx Date of 1st power generation: January 2012
/YES
aka Dean Hill Television Transmitter Centre, Dean Hill, Ambleston, Haverfordwest, Dyfed, SA61
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
AMBLESTON SOLAR PANELS 6 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Dyfed Country: Wales LPA: Pembrokeshire County Council
|
Site ID and Reference: |
1623 / C0264
District:
|
Applicant: |
Arqiva Ltd
Application :
11/0104/PA
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Television Transmitter Centre, Ambleston, Haverfordwest, Dyfed, SA61
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
202885 / 202885
|
Development Status: |
Operational
|
Application Submitted: |
6/16/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/24/2011
|
|
|
Generator Live |
1/25/2012
|
This Record Last Updated: |
1/29/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
planning application Arqiva Ltd at Television Transmitter, Dean Hill
Planning, Design anD access statement AMBLESTON, Dean Hill, PLANNING, DESIGN AND ACCESS STATEMENT TELEVISION TRANSMITTER STATION, DEAN HILL, WHITEPARISH, SALISBURY, by Pegasus Planning Group, for Arqiva
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|