Kirkby Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kirkby Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cumbria    
Type of installation: Wind    on/offshore: on
Turbines :12  Capacity : 4.8 MW
Approx Date of 1st power generation: September 1993

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Vestas WD34 Start Speed: 4.5
Capacity: 0.4 Optimal Speed: 15
Rotor Diameter: 34 Stop Speed: 25
Hub Height 25   Avg for all turbines:25 Avg. Elevation: 290
Web Page:
Comment: Windane 34

 Address

Kirkby Moor Wind Farm Kirkby in FurnessCumbriaKirkby in Furness Cumbria

 Associated Companies.

Relationship Company (For: Kirkby Moor )
DeveloperNpower Renewables

 DECC Data on this Project: Kirkby Moor :2713

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Kirkby Moor     4.8 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: South Lakeland District Council
Site ID and Reference: 2713 / A0261     District:
Applicant: Npower Renewables     Application : Unknown (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 0.40000000000000002
Height of Turbines: Calculated capacity: 4.8
Site Address: approximately 4km from Ulverston, within a Site of Special Scientific Interest
 
County: Cumbria Region: North West
OS Coordinates: 326111 / 326111
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused: 6/13/2017
Construction Date:    
Generator Live 1/1/1993 This Record Last Updated: 8/5/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 6/13/2017

 OFGEM Data on this Project: Kirkby Moor: Wind : R00021RQEN

Site Name: Kirkby Moor Wind Farm - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00021RQEN
Capacity: 4800 Status: Live
Accreditation Date:    
Commission Date: 9/1/1993    
Applicant: Beaufort Wind Ltd
Applicant Address: Riverside House Meadowbank Furlong Road Bourne End, Buckinghamshire SL8 5AJ
Address: Kirkby Moor Wind Farm Kirkby in FurnessCumbriaKirkby in FurnessCum England

 Calculations


Capacity: 19.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 19.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351157

Project Info
Ventient Energy to appeal planning decision on KIRKBY MOOR wind farm
It was a close vote with the planning committee split almost down the middle, six members voted to refuse the application for the wind farm’s continued operation and five voting against refusal.

KIRKBY MOOR wind farm must be allowed to continue
The decision no to extend the life of KIRKBY MOOR windfarm must surely be one of the worst decisions by South Lakeland District Council in recent years (Gazette, December 7, 'Residents win turbines fight').

KIRKBY MOOR: The current site

KIRKBY MOOR - Repowering

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School