Chelveston Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Chelveston Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Chelveston Airfield    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 22.5 MW
Approx Date of 1st power generation: February 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Chelveston Renewable Energy park:a biomass Anaerobic Digestion plant and bio-fuelled generators have been approved with the capacity to produce 2 and 6MW of renewable electricity respectively to feed into the local network.
125m high to blade tip.
Current plans for a windfarm will complement these facilities and take the capacity to over 30MW. With the windfarm fully integrated within the renewable energy park CREL will be able to export a base load from the biomass plant of 1.5 MW with on average, approaching 7MW from the wind power. A further 6MW will be available on demand from the biofuelled engine generators at times of low windpower or high electricity demand. Together these can provide an estimated annual 109,000 MWh of renewable electricity sufficient for 27,500 households and offsetting some 47,000 tonnes a year of CO2 emissions from power stations.

 Turbine Make and Specs

Model: GE 2.85 Start Speed: 3
Capacity: 2.85 Optimal Speed: 12.5
Rotor Diameter: 100 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 87
Web Page: http://www.ge-energy.com/content/multimedia/_files/downloads/GEA18274B_Wind_Onshore_.pdf
Comment: Hub heights 75, 85, 98.3 m

 Address

Chelveston Renewable Energy Park Chelveston NN9 6AR England

 Associated Companies.

Relationship Company (For: Chelveston )
InstallerDragon Infrastructure Solutions

 DECC Data on this Project: Chelveston :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Chelveston Renewable Energy Park Wind Farm (Bedford)     10 MW
Energy Type: Wind Onshore
County: Northamptonshire     Country: England     LPA: Bedford Borough Council
Site ID and Reference: 3795 / AA224     District:
Applicant: Chelveston Renewable Energy Ltd     Application : 10/00484/MAF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 10
Site Address: Chelveston Airfield, East Northamptonshore
 
County: Northamptonshire Region: East Midlands
OS Coordinates: 499823 / 499823
Development Status: Operational
Application Submitted: 3/24/2010 Planning Permission Granted
Application Determined: Permission refused: 3/29/2011
Construction Date: 8/1/2013    
Generator Live 2/15/2014 This Record Last Updated: 5/6/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 3/29/2011

Site Name: Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)     12.5 MW
Energy Type: Wind Onshore
County: Northamptonshire     Country: England     LPA: East Northamptonshire Council
Site ID and Reference: 3946 / EN00237     District:
Applicant: Chelveston Renewable Energy     Application : 10/00415/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 12.5
Site Address: Chelveston Airfield East Northamptonshore
 
County: Northamptonshire Region: East Midlands
OS Coordinates: 499885 / 499885
Development Status: Operational
Application Submitted: 3/3/2010 Planning Permission Granted
Application Determined: Permission refused: 3/7/2011
Construction Date: 8/1/2013    
Generator Live 2/15/2014 This Record Last Updated: 5/6/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 3/7/2011

 OFGEM Data on this Project: Chelveston: Wind :

Site Name: Chelveston Renewable Energy
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00312RQEN
Capacity: 25650 Status: Live
Accreditation Date: 3/3/2010    
Commission Date: 9/20/2013    
Applicant: Chelveston Renewable Energy Ltd
Applicant Address: Grant Thornton House Kettering Parkway Kettering Venture Park Kettering NN15 6XR England
Address: Chelveston Renewable Energy Chelveston Renewable Energy Park Chelveston NN9 6AR England

Site Name: Chelveston Renewable Energy
Generator Type: Wind
Scheme : REGO Generator ID: G02256NWEN
Capacity: 25650 Status: Live
Accreditation Date: 3/3/2010    
Commission Date: 9/20/2013    
Applicant: Chelveston Renewable Energy Ltd
Applicant Address: Grant Thornton House Kettering Parkway Kettering Venture Park Kettering NN15 6XR England
Address: Chelveston Renewable Energy Chelveston Renewable Energy Park Chelveston NN9 6AR England
 
Assumptions: Capacity: 25650kW 25.65 MW,
Thus over the month Capacity * 720 hours per month = 18468 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 3025 11.79% Issued
01/04/2018 4986 19.44% Issued
01/03/2018 6033 23.52% Issued
01/02/2018 5718 22.29% Issued
01/01/2018 8351 32.56% Issued
01/12/2017 7603 29.64% Issued
01/11/2017 5566 21.70% Issued
01/10/2017 7444 29.02% Issued
01/09/2017 3626 14.14% Issued
01/09/2017 2 0.01% Issued
01/08/2017 3455 13.47% Issued
01/07/2017 3396 13.24% Issued
01/06/2017 4868 18.98% Issued
01/05/2017 3827 14.92% Issued
01/04/2017 3242 12.64% Issued
01/03/2017 6455 25.17% Redeemed
01/02/2017 5870 22.88% Redeemed
01/01/2017 4576 17.84% Redeemed
01/01/2017 5 0.02% Issued
Dec-16 04932 4927 19.21% Issued
Nov-16 04786 4786 18.66% Issued
Oct-16 03432 1 0.00% Issued
Oct-16 00 3432 13.38% Issued
Sep-16 04459 4459 17.38% Issued
Aug-16 04170 4170 16.26% Issued
Jul-16 03742 3742 14.59% Issued
Jul-16 03742 3742 14.59% Issued
Jun-16 02359 3 0.01% Issued
May-16 04179 4179 16.29% Issued
Mar-16 05243 5243 20.44% Redeemed
Feb-16 07072 7072 27.57% Redeemed
Dec-15 011538 11538 44.98% Redeemed
Nov-15 08613 8613 33.58% Redeemed
Oct-15 03231 3231 12.60% Redeemed
Sep-15 02805 5 0.02% Issued
Aug-15 03586 3586 13.98% Redeemed
Jul-15 43204321 4320 16.84% Redeemed
Jun-15 39973997 3997 15.58% Redeemed
May-15 51435143 5143 20.05% Redeemed
Apr-15 33873387 3387 13.20% Redeemed
Mar-15 67576758 6757 26.34% Redeemed
Feb-15 52555255 5255 20.49% Redeemed
Jan-15 90919092 9091 35.44% Redeemed
Dec-14 89858984 8984 35.03% Redeemed
Nov-14 44544454 4454 17.36% Redeemed
Oct-14 65906591 1 0.00% Expired
Sep-14 14161389 1415 5.52% Redeemed
Aug-14 49054905 4905 19.12% Redeemed
Jul-14 25802564 2580 10.06% Redeemed
Jun-14 17701744 9 0.04% Expired
May-14 41594177 4159 16.21% Redeemed
Apr-14 35623576 14 0.05% Expired
Mar-14 55985609 11 0.04% Expired
Feb-14 99209922 2 0.01% Expired
Jan-14 85888591 3 0.01% Expired
Dec-13 90689074 6 0.02% Expired
Nov-13 48404848 8 0.03% Expired
Oct-13 72347238 4 0.02% Expired
Sep-13 746642 640 2.50% Expired

 Calculations


Capacity: 45
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 45 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3560

Project Info
CHELVESTON: Viewpoint Locations

CHELVESTON Renewable Energy home site

CHELVESTON: Flickr aerial photo

Solar installation on the old CHELVESTON airfield: aerial 2014
Geograph

Northamptonshire could become 'wind farm capital'
The government has approved turbines for Bozeat, Kelmarsh, Boddington and Watford Lodge. Best renewable energy Appeals are also pending for wind farms at Sudborough, CHELVESTON, Helmdon, Lilbourne and Winwick.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School