Sorry I found no matches, Please try again. 176
vid = 246pws_id = 351930pws_id = 351930
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.8.2 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Lisglass Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Lisglass Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Lisglass Co Antrim    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 3 MW
Approx Date of 1st power generation: February 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 65   Avg for all turbines:65 Avg. Elevation: 275
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

59 Lisglass Road Lisglass Ballyclare BT39 9NH Northern Ireland

 Associated Companies.

Relationship Company (For: Lisglass )
DeveloperTCI Renewables

 DECC Data on this Project: Lisglass :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Lisglass: Wind :

Site Name: Lisglass Wind Ltd
Generator Type: Wind
Scheme : REGO Generator ID: G00522NWNI
Capacity: 2275 Status: Live
Accreditation Date:    
Commission Date: 3/2/2015    
Applicant: Clondermot Wind Limited
Applicant Address: Greenwood House 64 Newforge Lane Belfast BT9 5NF Northern Ireland
Address: 59 Lisglass Road Lisglass Ballyclare BT39 9NH Northern Ireland
 
Assumptions: Capacity: 2275kW 2.275 MW,
Thus over the month Capacity * 720 hours per month = 1638 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 519 22.81% Issued
01/03/2018 769 33.80% Issued
01/02/2018 677 29.76% Issued
01/01/2018 982 43.16% Issued
01/12/2017 675 29.67% Retired
01/11/2017 652 28.66% Retired
01/10/2017 813 35.74% Retired
01/09/2017 561 24.66% Retired
01/08/2017 385 16.92% Retired
01/07/2017 372 16.35% Retired
01/06/2017 486 21.36% Retired
01/05/2017 356 15.65% Issued
01/04/2017 576 25.32% Issued
01/03/2017 625 27.47% Issued
01/02/2017 779 34.24% Issued
01/01/2017 713 31.34% Issued
Dec-16 662 662 29.10% Issued
Nov-16 552 552 24.26% Retired
Oct-16 573 342 15.03% Issued
Sep-16 450 450 19.78% Retired
Aug-16 434 434 19.08% Retired
Jul-16 315 315 13.85% Retired
Jun-16 220 220 9.67% Issued
May-16 459 459 20.18% Issued
Apr-16 499 499 21.93% Issued
Mar-16 459 459 20.18% Issued
Feb-16 721 721 31.69% Issued
Jan-16 835 835 36.70% Issued
Dec-15 721 721 31.69% Issued
Nov-15 384 388 17.05% Retired
Oct-15 432 432 18.99% Retired
Sep-15 445 445 19.56% Retired
Aug-15 332 332 14.59% Retired
Jul-15 415416 414 18.20% Retired
Jun-15 436436 436 19.16% Retired
May-15 593593 593 26.07% Retired
Apr-15 395395 395 17.36% Retired
Mar-15 529530 530 23.30% Retired

 Calculations


Capacity: 4.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.6 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 351930

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School