Loading
Page views this IP this session = 1 of 10 unsubscribed pagesLlandinam Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Llandinam Wind Farm (Wind , Active) Location in the UK : Wales, Powys Type of installation: Wind on/offshore: on Turbines :103 Capacity : 30.9 MW Approx Date of 1st power generation: Repowering: 2014
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Also known as Penrhyddlan and Llidiartywaun
Plans have been unveiled in Powys to turn one of the largest wind farms in the UK into one of the tallest
• Repowering and Extension
- Erection of 34 proposed wind turbines
- Crane hardstanding areas ;
- Upgrading and construction of on-site access tracks, turning areas, and
associated watercourse crossings and drainage works;
- Upgrading of the site access from the A483 road;
- Construction of an on-site substation;
- Installation of two Permanent Power Performance Assessment (PPA)
meteorological masts; and
- Installation of on-site underground cabling.
The Development will comprise 34 three-bladed horizontal axis wind turbines with a height envelope of up to 122 m to blade tip, and a total installed capacity of up to 102MW. A range of turbines is commercially available; the final choice of turbine will be based upon attaining maximum wind yield from the Development whilst adhering to the technical and environmental constraints posed by the site. The “candidate” turbine, on which assessments have been based, is the Siemens SWT-2.3-82 with a hub height of 80 m and rotor diameter of 82.4 m, thus giving a total height to blade tip of 121.2 m (compared with 45.5 m for the existing turbines). Other turbines of similar physical size with outputs of up to 3 MW are
available.
Model: |
Mitsubishi 275/28
|
Start Speed: |
4
|
Capacity: |
0.28
|
Optimal Speed: |
14
|
Rotor Diameter: |
28
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:60
|
Avg. Elevation: |
531
|
Web Page: |
|
Comment: |
Start and stop is guessed
|
Llidiartywaun Wind Farm Celt Power Ltd. Bryn Dadlam Mochdre Newton SY16 1RB Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Llandinam Windfarm Repowering and Extension 102 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: DECC (S36)
|
Site ID and Reference: |
3983 / EN00552
District:
|
Applicant: |
Scottish Power (formerly CeltPower Ltd/Eurus Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
34 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
102 |
Site Address: |
10km south of Newtown,
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
303400 / 303400
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
5/8/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/25/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
9/7/2025 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Llandinam Windfarm 31 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
3057 / EN00551
District:
|
Applicant: |
CELTPOWER LTD
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
103 |
Turbine Capacity: |
0.29999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
30.9 |
Site Address: |
10km south of Newtown
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
302840 / 302840
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/1993
|
This Record Last Updated: |
12/4/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Llidiartywaun Wind Farm - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00037RQWA
|
Capacity: |
18900
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
12/1/1992
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
Llidiartywaun Wind Farm
Celt Power Ltd.Bryn DadlamMochdreNewton
SY16 1RB
Wales
|
Site Name: |
Llidiartywaun Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00525NWWA
|
Capacity: |
18900
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
12/1/1992
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
Llidiartywaun Wind Farm
Celt Power Ltd.Bryn DadlamMochdreNewton
SY16 1RB
Wales
|
|
Assumptions: Capacity: 18900kW 18.9 MW, Thus over the month Capacity * 720 hours per month = 13608 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 2598 | 13.75% | Issued | 01/02/2018 | | | 2796 | 14.79% | Issued | 01/01/2018 | | | 5110 | 27.04% | Issued | 01/12/2017 | | | 3566 | 18.87% | Issued | 01/11/2017 | | | 2256 | 11.94% | Issued | 01/10/2017 | | | 4330 | 22.91% | Issued | 01/09/2017 | | | 2301 | 12.17% | Issued | 01/08/2017 | | | 1677 | 8.87% | Issued | 01/07/2017 | | | 1647 | 8.71% | Issued | 01/06/2017 | | | 2390 | 12.65% | Issued | 01/05/2017 | | | 1808 | 9.57% | Issued | 01/04/2017 | | | 1276 | 6.75% | Issued | 01/03/2017 | | | 3724 | 19.70% | Redeemed | 01/02/2017 | | | 3697 | 19.56% | Redeemed | 01/01/2017 | | | 2565 | 13.57% | Redeemed | Dec-16 | 0 | 3214 | 3231 | 17.10% | Retired | Nov-16 | 0 | 2163 | 2186 | 11.57% | Issued | Oct-16 | 0 | 1703 | 1732 | 9.16% | Issued | Sep-16 | 0 | 2298 | 2319 | 12.27% | Issued | Aug-16 | 0 | 2305 | 2332 | 12.34% | Issued | Jul-16 | 0 | 2080 | 2106 | 11.14% | Issued | Jun-16 | 0 | 776 | 819 | 4.33% | Issued | Jun-16 | 0 | 776 | 819 | 4.33% | Issued | May-16 | 0 | 1498 | 1525 | 8.07% | Issued | Apr-16 | 0 | 1920 | 1950 | 10.32% | Issued | Mar-16 | 0 | 2497 | 2528 | 13.38% | Redeemed | Feb-16 | 0 | 3705 | 3705 | 19.60% | Redeemed | Jan-16 | 0 | 4407 | 4407 | 23.32% | Redeemed | Dec-15 | 0 | 6778 | 6778 | 35.86% | Redeemed | Nov-15 | 0 | 5093 | 5093 | 26.95% | Redeemed | Oct-15 | 0 | 1636 | 1668 | 8.83% | Redeemed | Sep-15 | 0 | 1117 | 1147 | 6.07% | Redeemed | Aug-15 | 0 | 1780 | 1811 | 9.58% | Redeemed | Jul-15 | 2539 | 2519 | 2540 | 13.44% | Redeemed | Jun-15 | 2142 | 2119 | 2141 | 11.33% | Redeemed | May-15 | 3768 | 3768 | 3768 | 19.94% | Redeemed | Apr-15 | 2369 | 2338 | 2369 | 12.53% | Redeemed | Mar-15 | 4044 | 4022 | 4044 | 21.40% | Redeemed | Feb-15 | 2821 | 2801 | 2821 | 14.93% | Redeemed | Jan-15 | 5099 | 5099 | 5099 | 26.98% | Redeemed | Dec-14 | 5276 | 5276 | 5276 | 27.92% | Redeemed | Nov-14 | 2543 | 2521 | 2543 | 13.46% | Redeemed | Oct-14 | 3999 | 3999 | 3999 | 21.16% | Redeemed | Sep-14 | 640 | 593 | 640 | 3.39% | Redeemed | Aug-14 | 2797 | 2777 | 2797 | 14.80% | Redeemed | Jul-14 | 936 | 896 | 936 | 4.95% | Redeemed | Jun-14 | 434 | 382 | 434 | 2.30% | Redeemed | May-14 | 2063 | 2028 | 2064 | 10.92% | Redeemed | Apr-14 | 1909 | 1879 | 1908 | 10.10% | Redeemed | Mar-14 | 3248 | 3230 | 3248 | 17.19% | Redeemed | Feb-14 | 5347 | 5347 | 5347 | 28.29% | Redeemed | Jan-14 | 4669 | 4669 | 4669 | 24.70% | Redeemed | Dec-13 | 5367 | 5367 | 5367 | 28.40% | Redeemed | Nov-13 | 2402 | 2371 | 2402 | 12.71% | Redeemed | Oct-13 | 4086 | 4086 | 4086 | 21.62% | Redeemed | Sep-13 | 1714 | 1683 | 1714 | 9.07% | Redeemed | Aug-13 | 1552 | 1525 | 1552 | 8.21% | Redeemed | Jul-13 | 896 | 852 | 896 | 4.74% | Redeemed | Jun-13 | 2148 | 2125 | 2148 | 11.37% | Redeemed | May-13 | 2856 | 2829 | 2856 | 15.11% | Redeemed | Apr-13 | 3227 | 3227 | 3227 | 17.07% | Redeemed | Mar-13 | 2921 | 2898 | 2921 | 15.46% | Expired | Feb-13 | 2676 | 2652 | 2675 | 14.15% | Redeemed | Jan-13 | 3136 | 3111 | 3136 | 16.59% | Redeemed | Dec-12 | 4541 | 4541 | 4541 | 24.03% | Redeemed | Nov-12 | 2863 | 2841 | 2863 | 15.15% | Redeemed | Oct-12 | 2810 | 2788 | 2809 | 14.86% | Redeemed | Sep-12 | 3064 | 3064 | 3064 | 16.21% | Redeemed | Aug-12 | 1039 | 1018 | 1039 | 5.50% | Redeemed | Jul-12 | 1173 | 1142 | 1174 | 6.21% | Redeemed | Jun-12 | 2211 | 2185 | 2211 | 11.70% | Redeemed | May-12 | 1226 | 1190 | 1226 | 6.49% | Redeemed | Apr-12 | 1713 | 1686 | 1712 | 9.06% | Redeemed | Mar-12 | 1304 | 1274 | 1304 | 6.90% | Redeemed | Feb-12 | 494 | 451 | 495 | 2.62% | Redeemed | Dec-11 | 486 | 395 | 485 | 2.57% | Redeemed | Nov-11 | 3682 | 3683 | 3683 | 19.49% | Redeemed | Oct-11 | 4724 | 4724 | 4724 | 24.99% | Redeemed | Sep-11 | 4067 | 4067 | 4067 | 21.52% | Redeemed | Aug-11 | 1541 | 1511 | 1541 | 8.15% | Redeemed | Jul-11 | 1183 | 1137 | 1184 | 6.26% | Redeemed | Jun-11 | 2014 | 1991 | 2014 | 10.66% | Redeemed | May-11 | 4699 | 4699 | 4699 | 24.86% | Redeemed | Apr-11 | 1991 | 1960 | 295 | 1.56% | Redeemed | Mar-11 | 1805 | 1762 | 1805 | 9.55% | Redeemed | Feb-11 | 3194 | 3195 | 3195 | 16.90% | Redeemed | Jan-11 | 2927 | 2899 | 2926 | 15.48% | Redeemed | Dec-10 | 1152 | 1116 | 1153 | 6.10% | Redeemed | Nov-10 | 2951 | 2923 | 2950 | 15.61% | Redeemed | Oct-10 | 3390 | 3369 | 3390 | 17.94% | Redeemed |
|
Capacity: 30.9000000000001 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|