Sorry I found no matches, Please try again. 176
vid = 2935pws_id = 371536pws_id = 371536
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.137.162.21 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

An Suidhe Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

An Suidhe Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, inverary    
Type of installation: Wind    on/offshore: on
Turbines :23  Capacity : 19.3 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

9 ENERCON E-44 turbines and 14 ENERCON E-48 turbines with a total installed power of 19.3 megawatts (MW) are forecast to yield around 50 million kilowatt-hours in an average wind year.

 Turbine Make and Specs

Model: Enercon E48 Start Speed: 5
Capacity: 0.8 Optimal Speed: 15
Rotor Diameter: 48 Stop Speed: 25
Hub Height 56   Avg for all turbines:56 Avg. Elevation: 446
Web Page: http://www.enercon.de/en-en/492.htm
Comment: Hub height: 50 m / 55 m / 60 m / 76 m Stated as being ideal machine for any site

 Address

An Suidhe Wind Farm Inveraray Argyll Argyll PA32 8XT Scotland

 Associated Companies.

Relationship Company (For: An Suidhe )
OperatorRWE Innogy
DeveloperRWE Innogy

 DECC Data on this Project: An Suidhe :3298

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: An Suidhe     19.3 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3298 / S0005W2     District:
Applicant: RWE npower     Application : 05/01711/VARCON (Go to search to find Application)
For Wind Farms  
Number of Turbines: 23 Turbine Capacity: 0.90000000000000002
Height of Turbines: Calculated capacity: 20.7
Site Address: Dalmally, Strathclyde. PA33 On the eastern shore of Loch Awe
 
County: Strathclyde Region: Scotland
OS Coordinates: 200483 / 200483
Development Status: Operational
Application Submitted: 8/22/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/1/2007    
Generator Live 8/4/2010 This Record Last Updated: 7/29/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: An Suidhe: Wind : R00071SQSC

Site Name: An Suidhe Wind Farm
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00071SQSC
Capacity: 19300 Status: Live
Accreditation Date: 8/22/2005    
Commission Date: 8/4/2010    
Applicant: Innogy Renewables UK Limited (Wind)
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: An Suidhe Wind Farm Inveraray Argyll Argyll PA32 8XT Scotland

 Calculations


Capacity: 40.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 40.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371536

Project Info
AN SUIDHE Wind Farm

AN SUIDHE RWE

Onshore Windpark

GECCO takes over AN SUIDHE
On 9 November Green GECCO GmbH & Co. KG signed a contract with RWE Innogy to take over the Scottish onshore wind farm AN SUIDHE.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School