Whitemill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Whitemill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, coldham cambridgeshire    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 14 MW
Approx Date of 1st power generation: May 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Coldham Extension
Called White Mill the new 14 MW wind farm will be built by the Co-Operative Group on land it owns adjacent to its existing eight turbines.
White Mill and Coldham wind farms appear to be the same project, Coldham wind farm being the initial 8 turbines.

Coldham is immediately adjacent to Stags Holt

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 1
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Coldham Peterborough March Cambridgeshire PE14 OLX England

 Associated Companies.

Relationship Company (For: Whitemill )
OperatorScottish Power Renewables
OwnerTemporis Capital LLP
DeveloperWind Prospect

 DECC Data on this Project: Whitemill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Whitemill Wind Farm     14 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Fenland District Council
Site ID and Reference: 3480 / B0483     District:
Applicant: Co-operative Energy     Application : F/YR07/1184/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 14
Site Address: Coldham Estate, Coldham, Wisbech
  PE14 0LX
County: Cambridgeshire Region: Eastern
OS Coordinates: 545100 / 545100
Development Status: Operational
Application Submitted: 11/2/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 5/2/2012 This Record Last Updated: 8/24/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Whitemill: Wind :

Site Name: Whitemill Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00276RQEN
Capacity: 14063 Status: Live
Accreditation Date: 11/2/2007    
Commission Date: 5/2/2012    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Coldham Estate Coldham Wisbech PE14 0LX England

Site Name: Whitemill Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01960NWEN
Capacity: 14063 Status: Live
Accreditation Date: 11/2/2007    
Commission Date: 5/2/2012    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Coldham Estate Coldham Wisbech PE14 0LX England
 
Assumptions: Capacity: 14063kW 14.063 MW,
Thus over the month Capacity * 720 hours per month = 10125.36 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 1861 13.23% Issued
01/04/2018 2462 17.51% Issued
01/03/2018 3144 22.36% Issued
01/02/2018 2678 19.04% Issued
01/01/2018 4215 29.97% Issued
01/12/2017 3785 26.91% Retired
01/11/2017 2969 21.11% Retired
01/10/2017 3448 24.52% Retired
01/09/2017 1840 13.08% Retired
01/08/2017 1768 12.57% Retired
01/07/2017 1624 11.55% Retired
01/06/2017 2452 17.44% Retired
01/05/2017 1885 13.40% Issued
01/04/2017 1853 13.18% Issued
01/03/2017 3098 22.03% Retired
01/02/2017 2846 20.24% Retired
01/01/2017 1898 13.50% Retired
Dec-16 02237 2237 15.91% Issued
Nov-16 02396 2396 17.04% Issued
Oct-16 00 1681 11.95% Pending Tr
Oct-16 01681 1681 11.95% Retired
Sep-16 02034 2034 14.46% Retired
Aug-16 02103 2103 14.95% Retired
Jul-16 01684 1684 11.97% Retired
Jul-16 01684 1684 11.97% Issued
Jun-16 01358 1368 9.73% Issued
May-16 02282 2282 16.23% Issued
Apr-16 01983 1983 14.10% Issued
Mar-16 02702 2702 19.21% Retired
Feb-16 03831 3831 27.24% Retired
Jan-16 03912 3912 27.82% Redeemed
Dec-15 05884 5884 41.84% Retired
Nov-15 04550 4550 32.35% Retired
Oct-15 01464 1464 10.41% Retired
Sep-15 01376 1376 9.78% Retired
Aug-15 01687 1687 12.00% Retired
Jul-15 18821882 1882 13.38% Redeemed
Jun-15 19321932 1932 13.74% Redeemed
May-15 29222922 2922 20.78% Redeemed
Apr-15 19101910 1910 13.58% Redeemed
Mar-15 37963796 3796 26.99% Redeemed
Feb-15 27152715 2715 19.31% Redeemed
Jan-15 46224622 4622 32.87% Redeemed
Dec-14 46144613 4613 32.80% Redeemed
Nov-14 19491949 1949 13.86% Redeemed
Oct-14 28672868 2868 20.39% Redeemed
Sep-14 678667 678 4.82% Redeemed
Aug-14 24772477 2477 17.61% Redeemed
Jul-14 13061297 1305 9.28% Redeemed
Jun-14 894884 894 6.36% Redeemed
May-14 20332033 2033 14.46% Redeemed
Apr-14 19101911 1911 13.59% Redeemed
Mar-14 28412840 2840 20.19% Redeemed
Feb-14 51575157 5157 36.67% Expired
Jan-14 40444045 4044 28.76% Redeemed
Dec-13 47614761 4761 33.85% Expired
Nov-13 24042404 2403 17.09% Redeemed
Oct-13 36863686 3686 26.21% Redeemed
Sep-13 15341534 1534 10.91% Redeemed
Aug-13 15461545 1545 10.99% Redeemed
Jul-13 1006996 1006 7.15% Redeemed
Jun-13 21512152 2152 15.30% Redeemed
May-13 25532552 2552 18.15% Redeemed
Apr-13 33653365 1950 13.87% Redeemed
Mar-13 29902990 2990 21.26% Redeemed
Feb-13 26032602 2602 18.50% Redeemed
Jan-13 26692670 2670 18.99% Redeemed
Dec-12 38983898 3898 27.72% Redeemed
Nov-12 27492749 2749 19.55% Redeemed
Oct-12 24352435 2435 17.31% Redeemed
Sep-12 26462645 2645 18.81% Redeemed
Aug-12 15321532 1532 10.89% Redeemed
Jul-12 12031196 1204 8.56% Redeemed
Jun-12 27382738 2738 19.47% Redeemed
May-12 815815 815 5.80% Redeemed

 Calculations


Capacity: 28
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 28 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 352195

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School