Sorry I found no matches, Please try again. 176
vid = 3002pws_id = 324171pws_id = 324171
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.119.108.233 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hook Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hook Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Garforth    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 15 MW
Approx Date of 1st power generation: January 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Planning permission granted at public inquiry on 11 October 2011, decision issued 9 December 2011.

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 64
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

Hook Moor Wind Farm Collier Lane Aberford Leeds LS25 3EB England

 Associated Companies.

Relationship Company (For: Hook Moor )
DeveloperBanks Renewables
OwnerBanks Renewables

 DECC Data on this Project: Hook Moor :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hook Moor     10.3 MW
Energy Type: Wind Onshore
County: West Yorkshire     Country: England     LPA: Leeds City Council
Site ID and Reference: 4658 / EN00422     District:
Applicant: Banks Renewables     Application : 08/01118/FU (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.0499999999999998
Height of Turbines: 125 Calculated capacity: 6.15
Site Address: Land at Hook Moor , Micklefield , Leeds
 
County: West Yorkshire Region: Yorkshire and Humber
OS Coordinates: 443851 / 443851
Development Status: Operational
Application Submitted: 2/26/2008 Planning Permission Granted
Application Determined: Permission refused: 8/4/2009
Construction Date: 3/11/2015    
Generator Live 1/15/2016 This Record Last Updated: 2/26/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/4/2009

 OFGEM Data on this Project: Hook Moor: Wind :

Site Name: Hook Moor Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00363RQEN
Capacity: 9871 Status: Live
Accreditation Date: 2/26/2008    
Commission Date: 11/18/2015    
Applicant: Banks Renewables (Hook Moor Wind Farm) Ltd
Applicant Address: Inkerman House St Johns Road Meadowfield DURHAM DH7 8XL England
Address: Hook Moor Wind Farm Collier Lane Aberford Leeds LS25 3EB England

Site Name: Hook Moor Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02885NWEN
Capacity: 9871 Status: Live
Accreditation Date: 2/26/2008    
Commission Date: 11/18/2015    
Applicant: Banks Renewables (Hook Moor Wind Farm) Ltd
Applicant Address: Inkerman House St Johns Road Meadowfield DURHAM DH7 8XL England
Address: Hook Moor Wind Farm Collier Lane Aberford Leeds LS25 3EB England
 
Assumptions: Capacity: 9871kW 9.871 MW,
Thus over the month Capacity * 720 hours per month = 7107.12 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 2314 23.44% Issued
01/03/2018 2815 28.52% Issued
01/02/2018 2207 22.36% Issued
01/01/2018 3342 33.86% Issued
01/12/2017 3434 34.79% Issued
01/11/2017 2723 27.59% Issued
01/11/2017 107 1.08% Issued
01/10/2017 3297 33.40% Issued
01/09/2017 1868 18.92% Issued
01/08/2017 1983 20.09% Issued
01/07/2017 1768 17.91% Issued
01/06/2017 2488 25.21% Issued
01/05/2017 1963 19.89% Issued
01/04/2017 1990 20.16% Issued
01/03/2017 2539 25.72% Redeemed
01/02/2017 2544 25.77% Redeemed
01/01/2017 2072 20.99% Redeemed
Dec-16 01796 1995 20.21% Issued
Nov-16 02037 2264 22.94% Issued
Oct-16 01493 1659 16.81% Issued
Sep-16 01353 1504 15.24% Issued
Aug-16 0628 1260 12.76% Revoked
Jul-16 01621 1801 18.25% Issued
Jul-16 01621 1801 18.25% Issued
Jun-16 01072 1192 12.08% Issued
May-16 01827 2031 20.58% Issued
Apr-16 01833 2037 20.64% Issued
Mar-16 01766 1962 19.88% Issued
Feb-16 02435 2705 27.40% Issued
Jan-16 02811 3124 31.65% Issued
Dec-15 03544 107 1.08% Revoked
Nov-15 0407 456 4.62% Pending Tr

 Calculations


Capacity: 30
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 30 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 324171

Project Info
Banks Group: HOOK MOOR Wind Farm

Banks Group: HOOK MOOR

HOOK MOOR Wind farm planning location map (plus Hampole)

Durham’s Hall Construction appointed as main contractor for £14m wind farm
Rushyford-based Hall Construction has won the contract from fellow North East business The Banks Group to lead on the development of the HOOK MOOR wind farm.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School