Glenkerie wind farm in the Scottish Borders has an installed capacity of 22MW and has been generating since February 2012.
Infinis received a CEEQUAL Whole Project Award in July 2011 for Glenkerie wind farm
Originally proposed by Novera
Model: |
Vestas V80
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
446
|
Web Page: |
|
Comment: |
|
Relationship |
Company (For:
Glenkerie
) |
Developer | infinis | Operator | infinis |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Glenkerie Wind Farm Extension 15 MW
|
Energy Type: |
Wind Onshore |
County: |
Borders Country: Scotland LPA: Scottish Borders Council
|
Site ID and Reference: |
4578 / B0556
District:
|
Applicant: |
Muirhall Energy (formerly Infinis)
Application :
13/00552/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
15 |
Site Address: |
Kingledores Farm, Broughton, Biggar, Strathclyde
|
|
ML12 6QL
|
County: |
Borders Region: Scotland
|
OS Coordinates: |
310453 / 310453
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
5/14/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/1/2014
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/23/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
7/29/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
3/5/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/1/2014 |
Site Name: |
Glenkerie Wind Farm 22 MW
|
Energy Type: |
Wind Onshore |
County: |
Borders Country: Scotland LPA: Scottish Borders Council
|
Site ID and Reference: |
3538 / A0037
District:
|
Applicant: |
Novera Energy
Application :
07/02478/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
11 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
22 |
Site Address: |
Kingledores Farm, Broughton, Biggar, Strathclyde. ML12 6QL
|
|
|
County: |
Borders Region: Scotland
|
OS Coordinates: |
310453 / 310453
|
Development Status: |
Operational
|
Application Submitted: |
12/20/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2011
|
|
|
Generator Live |
2/1/2012
|
This Record Last Updated: |
3/6/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 44 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|