Parc-Cynog Wind Farm (Wind , Active) Location in the UK : Wales, Carmarthenshire Type of installation: Wind on/offshore: on Turbines :11 Capacity : 8.4 MW Approx Date of 1st power generation: Feb 2001 / Nov 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
An additional 4.8MW of Installed Capacity has been added to the 3.6MW already operational, with a combined maximum output of 8.4MW.
Model: |
Enercon E48
|
Start Speed: |
5
|
Capacity: |
0.8
|
Optimal Speed: |
15
|
Rotor Diameter: |
48
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
152
|
Web Page: |
http://www.enercon.de/en-en/492.htm |
Comment: |
Hub height: 50 m / 55 m / 60 m / 76 m
Stated as being ideal machine for any site
|
Parc-Cynog Pendine Carmarthenshire Pendine SA33 4PY Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Parc Cynog Extension 8.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Dyfed Country: Wales LPA: Carmarthenshire County Council
|
Site ID and Reference: |
2950 / EN00174
District:
|
Applicant: |
Nuon
Application :
W/12246
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
7.8 |
Site Address: |
Parc Cynog, Pendine, Carms
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
225230 / 225230
|
Development Status: |
Operational
|
Application Submitted: |
2/2/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
11/1/2009
|
This Record Last Updated: |
11/2/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Parc-Cynog Wind Farm 3.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Dyfed Country: Wales LPA: Carmarthenshire County Council
|
Site ID and Reference: |
2636 / 10019W3
District:
|
Applicant: |
Micon Wind Turbines (UK) Limited
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
0.69999999999999996 |
Height of Turbines: |
|
Calculated capacity: |
3.5 |
Site Address: |
Parc-Cynog Farm
Pendine
Carmarthenshire
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
225500 / 225500
|
Development Status: |
Operational
|
Application Submitted: |
5/5/1998
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
2/1/2000
|
Construction Date: |
|
|
|
Generator Live |
2/1/2001
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
2/1/2000 |
Site Name: |
Pendine Wind Farm Limited
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00186RQWA
|
Capacity: |
4800
|
Status: |
Live
|
Accreditation Date: |
5/5/1998
|
|
|
Commission Date: |
6/15/2009
|
|
|
Applicant: |
Pendine Wind Farm Limited
|
Applicant Address: |
Abbey Warehouse
Abbey Slip
Penzance
TR18 4AR
England
|
Address: |
Parc Cynog Farm
Pendine
SA33 4PY
Wales
|
Site Name: |
Pendine Wind Farm Limited
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01343NWWA
|
Capacity: |
4800
|
Status: |
Live
|
Accreditation Date: |
5/5/1998
|
|
|
Commission Date: |
6/15/2009
|
|
|
Applicant: |
Pendine Wind Farm Limited
|
Applicant Address: |
Abbey Warehouse
Abbey Slip
Penzance
TR18 4AR
England
|
Address: |
Parc Cynog Farm
Pendine
SA33 4PY
Wales
|
|
Assumptions: Capacity: 4800kW 4.8 MW, Thus over the month Capacity * 720 hours per month = 3456 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 1272 | 26.50% | Issued | 01/02/2018 | | | 1271 | 26.48% | Issued | 01/01/2018 | | | 1747 | 36.40% | Issued | 01/12/2017 | | | 1479 | 30.81% | Issued | 01/11/2017 | | | 1167 | 24.31% | Issued | 01/10/2017 | | | 1446 | 30.13% | Issued | 01/09/2017 | | | 1172 | 24.42% | Issued | 01/08/2017 | | | 845 | 17.60% | Issued | 01/07/2017 | | | 698 | 14.54% | Issued | 01/06/2017 | | | 1037 | 21.60% | Issued | 01/05/2017 | | | 747 | 15.56% | Issued | 01/04/2017 | | | 737 | 15.35% | Issued | 01/03/2017 | | | 1333 | 27.77% | Redeemed | 01/02/2017 | | | 1334 | 27.79% | Redeemed | 01/01/2017 | | | 1137 | 23.69% | Redeemed | Dec-16 | 0 | 889 | 889 | 18.52% | Issued | Nov-16 | 0 | 1057 | 1057 | 22.02% | Issued | Oct-16 | 0 | 801 | 801 | 16.69% | Issued | Sep-16 | 0 | 1159 | 1159 | 24.15% | Issued | Aug-16 | 0 | 851 | 851 | 17.73% | Issued | Jul-16 | 0 | 745 | 745 | 15.52% | Issued | Jun-16 | 0 | 576 | 576 | 12.00% | Issued | Jun-16 | 0 | 576 | 576 | 12.00% | Issued | May-16 | 0 | 752 | 752 | 15.67% | Issued | May-16 | 0 | 752 | 752 | 15.67% | Issued | Apr-16 | 0 | 1004 | 1004 | 20.92% | Issued | Mar-16 | 0 | 1002 | 1002 | 20.88% | Issued | Feb-16 | 0 | 1395 | 1395 | 29.06% | Issued | Jan-16 | 0 | 1759 | 1759 | 36.65% | Issued | Dec-15 | 0 | 2349 | 2349 | 48.94% | Redeemed | Nov-15 | 0 | 1800 | 1800 | 37.50% | Redeemed | Oct-15 | 0 | 874 | 874 | 18.21% | Redeemed | Sep-15 | 0 | 751 | 751 | 15.65% | Redeemed | Aug-15 | 0 | 951 | 951 | 19.81% | Redeemed | Jul-15 | 1053 | 1053 | 1053 | 21.94% | Redeemed | Jun-15 | 834 | 834 | 834 | 17.38% | Redeemed | May-15 | 1199 | 1200 | 1200 | 25.00% | Redeemed | Apr-15 | 876 | 876 | 876 | 18.25% | Redeemed | Mar-15 | 1420 | 1420 | 1420 | 29.58% | Redeemed | Feb-15 | 1192 | 1191 | 1191 | 24.81% | Redeemed | Jan-15 | 1774 | 1775 | 1775 | 36.98% | Redeemed | Dec-14 | 1711 | 1711 | 1711 | 35.65% | Redeemed | Nov-14 | 1240 | 1240 | 241 | 5.02% | Redeemed | Oct-14 | 1595 | 1595 | 1595 | 33.23% | Expired | Sep-14 | 396 | 396 | 396 | 8.25% | Expired | Aug-14 | 990 | 990 | 990 | 20.63% | Expired | Jul-14 | 547 | 546 | 546 | 11.38% | Expired | Jun-14 | 622 | 623 | 623 | 12.98% | Expired | May-14 | 820 | 819 | 819 | 17.06% | Expired | Apr-14 | 760 | 760 | 760 | 15.83% | Expired | Mar-14 | 1167 | 1167 | 1167 | 24.31% | Expired | Feb-14 | 2004 | 2004 | 2004 | 41.75% | Expired | Jan-14 | 1689 | 1689 | 1689 | 35.19% | Expired | Dec-13 | 1774 | 1774 | 1774 | 36.96% | Expired | Nov-13 | 1039 | 1039 | 1 | 0.02% | Expired | Oct-13 | 1578 | 1578 | 1578 | 32.88% | Redeemed | Sep-13 | 588 | 588 | 587 | 12.23% | Redeemed | Aug-13 | 744 | 744 | 744 | 15.50% | Redeemed | Jul-13 | 508 | 508 | 508 | 10.58% | Redeemed | Jun-13 | 949 | 948 | 948 | 19.75% | Redeemed | May-13 | 1375 | 1375 | 1375 | 28.65% | Redeemed | Apr-13 | 1315 | 1315 | 1315 | 27.40% | Redeemed | Mar-13 | 1024 | 1025 | 1025 | 21.35% | Expired | Feb-13 | 1105 | 1105 | 1105 | 23.02% | Expired | Jan-13 | 1324 | 1324 | 1324 | 27.58% | Expired | Dec-12 | 1513 | 1513 | 1513 | 31.52% | Expired | Nov-12 | 1129 | 1129 | 1129 | 23.52% | Expired | Oct-12 | 1039 | 1038 | 1038 | 21.63% | Expired | Sep-12 | 942 | 942 | 848 | 17.67% | Expired | Aug-12 | 1188 | 1188 | 1188 | 24.75% | Expired | Jul-12 | 773 | 0 | 773 | 16.10% | Expired | Jun-12 | 1191 | 1192 | 1192 | 24.83% | Expired | May-12 | 658 | 659 | 659 | 13.73% | Expired | Apr-12 | 1236 | 1236 | 1236 | 25.75% | Expired | Mar-12 | 813 | 0 | 814 | 16.96% | Expired | Feb-12 | 882 | 882 | 1 | 0.02% | Expired | Jan-12 | 1567 | 1567 | 1565 | 32.60% | Redeemed | Dec-11 | 2054 | 2054 | 2054 | 42.79% | Redeemed | Nov-11 | 1574 | 1574 | 1574 | 32.79% | Redeemed | Oct-11 | 1591 | 1590 | 1590 | 33.13% | Redeemed | Sep-11 | 1374 | 1375 | 1375 | 28.65% | Redeemed | Aug-11 | 695 | 695 | 695 | 14.48% | Redeemed | Jul-11 | 777 | 777 | 777 | 16.19% | Redeemed | Jun-11 | 944 | 944 | 944 | 19.67% | Redeemed | May-11 | 1525 | 1525 | 4 | 0.08% | Expired | Apr-11 | 774 | 774 | 774 | 16.13% | Redeemed | Mar-11 | 607 | 607 | 607 | 12.65% | Expired | Feb-11 | 1317 | 1316 | 1316 | 27.42% | Expired | Jan-11 | 1014 | 1015 | 1015 | 21.15% | Redeemed | Dec-10 | 858 | 857 | 857 | 17.85% | Redeemed | Nov-10 | 1128 | 1129 | 1129 | 23.52% | Redeemed |
|
Capacity: 16.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|