vid = 3173pws_id = 353736pws_id = 353736 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:4247 Ind:1 IP: 52.14.104.255 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Kype Muir Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kype Muir Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, strathaven    
Type of installation: Wind    on/offshore: on
Turbines :26  Capacity : 104 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Senvion M104 Start Speed: 4
Capacity: 3.4 Optimal Speed: 11
Rotor Diameter: 104 Stop Speed: 25
Hub Height 82   Avg for all turbines:82 Avg. Elevation: 341
Web Page: http://www.repower.de/fileadmin/download/produkte/RE_PP_3.4M104_uk.pdf
Comment:

 Address

 Associated Companies.

Relationship Company (For: Kype Muir )
DeveloperBanks Renewables
OwnerBanks Renewables

 DECC Data on this Project: Kype Muir :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Kype Muir Wind Farm Extension     75 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4628 / B1513     District:
Applicant: Banks Renewables     Application : EC00002083 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 15 Turbine Capacity: 5
Height of Turbines: 220 Calculated capacity: 75
Site Address: approximately 5 km south of the town of Strathaven
 
County: Strathclyde Region: Scotland
OS Coordinates: 271915 / 271915
Development Status: Finished
Application Submitted: 10/10/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/1/2021    
Generator Live This Record Last Updated: 1/19/2023
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Kype Muir Wind Farm     88.4 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4643 / AA451     District:
Applicant: Banks Renewables     Application : EK/11/0256 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 26 Turbine Capacity: 3.3999999999999999
Height of Turbines: Calculated capacity: 88.4
Site Address: approximately 5 km south of the town of Strathaven
 
County: Strathclyde Region: Scotland
OS Coordinates: 271915 / 271915
Development Status: Operational
Application Submitted: 8/9/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2017    
Generator Live 9/15/2019 This Record Last Updated: 10/1/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 5/22/2019    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Kype Muir: Wind :

 Calculations


Capacity: 176.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 176.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353736

Project Info
Wind farm aims to deliver £100m boost to South Lanarkshire economy
With construction of the 88MW KYPE MUIR Wind Farm, south of Strathaven, well underway, it is now estimated that the project will be worth more than £100m to the local economy.

KYPE MUIR Wind Farm Proposal Non Technical Summary • July 2011

Banks: KYPE MUIR Wind Farm Proposal

Banks wins nod on KYPE MUIR
Scottish Energy Minister Fergus Ewing gave the green light to the 26-turbine scheme, which will be sited 5km south of Strathaven.

Green light for new wind farm in South Lanarkshire
Energy minister Fergus Ewing has approved planning permission for 26 turbines to be built three miles south of Strathaven in South Lanarkshire. The KYPE MUIR wind farm will have a maximum capacity of 104 megawatts.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School