Sorry I found no matches, Please try again. 176
vid = 3179pws_id = 350596pws_id = 350596 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.219.231.197 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Park Wall Solar Farm

Park Wall Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Bridgewater    
Type of installation: Solar    on/offshore: on
Solar Panels :25000  Capacity : 5 MW
Acreage:20   or approx Hectares : 8
Approx Date of 1st power generation: March 2013

/YES

 Comment

The solar farm consists of over 20,000 solar panels. The panels are placed on top of steel frames, which are piled into the ground in a similar fashion to a fencepost. The panel ‘tables’ are positioned at an angle of between 20º and 35º from the ground and have a height of no more than 3.5 m from the ground to the top of the panel table.

 Address

Park Wall Westonzoyland Road Bridgewater Somerset TA7 0HY England

 Associated Companies.

Relationship Company (For: Park Wall )
OwnerLightsource Renewable Energy Limited
DeveloperWessex Solar Energy
OperatorWestern Power Distribution

 DECC Data on this Project: Park Wall :1103

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Park Wall Solar Park     5 MW
Energy Type: Solar Photovoltaics
County: Somerset     Country: England     LPA: Sedgemoor District Council
Site ID and Reference: 1103 / C1066     District:
Applicant:     Application : 09/11/00010 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land to the east of M5 motorway, and south of A372, Westonzoyland Road, Bridgwater Without, Bridgwater
 
County: Somerset Region: South West
OS Coordinates: 332133 / 332133
Development Status: Operational
Application Submitted: 3/1/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2012    
Generator Live 3/21/2013 This Record Last Updated: 4/15/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Park Wall: Solar : R00130RUEN

Site Name: Park Wall Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00130RUEN
Capacity: 3960 Status: Live
Accreditation Date: 3/1/2011    
Commission Date: 3/28/2013    
Applicant: Octopus Investments Limited
Applicant Address: 6th Floor, 33 Holborn London EC1N 2HT England
Address: Park Wall Westonzoyland Road Bridgewater Somerset TA7 0HY England

Project Info
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School