Sorry I found no matches, Please try again. 176
vid = 3191pws_id = 351555pws_id = 351555 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 7 Seen ) ID:1 Ind:0 IP: 3.17.4.144 {832) YESU WSHW: 7/10
Loading
Page views this IP this session = 7 of 10 unsubscribed pages

Stronelairg Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Stronelairg Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Fort Augustus    
Type of installation: Wind    on/offshore: on
Turbines :66  Capacity : 228 MW
Approx Date of 1st power generation: December 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Turbine layout shown shows an earlier layout prior to reduction to 67.


A 67-turbine wind farm proposed for the Garrogie Estate near Fort Augustus has been given the go-ahead by Energy Minister Fergus Ewing.

The government said SSE Renewables' Stronelairg project would generate power for 114,000 homes and bring £30m-worth of benefits to the region.

Landscape charity the John Muir Trust opposes the scheme.

 Turbine Make and Specs

Model: Vestas V117 Start Speed: 3
Capacity: 3.45 Optimal Speed: 0
Rotor Diameter: 0 Stop Speed: 25
Hub Height 125   Avg for all turbines:125 Avg. Elevation: 668
Web Page: https://www.vestas.com/en/products/turbines/v117%203_45_mw
Comment:

 Address

 Associated Companies.

Relationship Company (For: Stronelairg )
DeveloperScottish and Southern Energy
OwnerScottish and Southern Energy
OperatorScottish and Southern Energy

 DECC Data on this Project: Stronelairg :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Stronelairg Wind Farm     227.7 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4597 / AA513     District:
Applicant: Scottish and Southern Energy (SSE)     Application : EC00005242 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 66 Turbine Capacity: 3.4500000000000002
Height of Turbines: 135 Calculated capacity: 227.7
Site Address: located approximately 11 kilometres to the south-east of Fort Augustus
 
County: Highland Region: Scotland
OS Coordinates: 247166 / 247166
Development Status: Operational
Application Submitted: 6/29/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/20/2017    
Generator Live 12/11/2018 This Record Last Updated: 1/2/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Stronelairg: Wind :

 Calculations


Capacity: 455.399999999999
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 455.399999999999 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351555

Project Info
STRONELAIRG wind farm working at full capacity
December 12 (Renewables Now) - SSE plc (LON:SSE) has fully commissioned the 228-MW STRONELAIRG wind farm in the Scottish Highlands and is working on a 50% divestment plan, the UK utility said on Tuesday.

STRONELAIRG WIND FARM UPDATE
Following the recent result of the appeal of the Judicial Review on STRONELAIRG wind farm, SSE’s Wholesale business is now undertaking further work to see whether it will be possible to accredit the project under the Renewables Obligation.

SSE lowers STRONELAIRG ceiling
Scottish utility SSE has capped its 67-turbine STRONELAIRG wind farm at 200MW with headline hardware of up to 3MW now in the frame for the project near Loch Ness.

SSE STRONELAIRG Non Technical Summary

SSE STRONELAIRG

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School