Rhyd y groes Wind Farm (Wind , Active) Location in the UK : Wales, Ceredigion Type of installation: Wind on/offshore: on Turbines :24 Capacity : 7.2 MW Approx Date of 1st power generation: Nov 1992
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Commissioned in November 1992 the wind turbines are sited on agricultural land approximately 50 metres above sea level. The wind farm was developed by TriGen Windpower Limited and constructed by Toyo West (UK) Limited and is now owned by TPG Wind Limited, a joint venture between E.ON and Eurus Energy Europe BV.
Rhyd-y-Groes is owned by TPG Wind Ltd, a joint venture between E.ON and Eurus Energy UK Ltd.
Model: |
Bonus B33/300
|
Start Speed: |
4
|
Capacity: |
0.3
|
Optimal Speed: |
10
|
Rotor Diameter: |
33
|
Stop Speed: |
23
|
Hub Height |
31 Avg for all turbines:29
|
Avg. Elevation: |
46
|
Web Page: |
|
Comment: |
(Now Siemens )
|
Rhyd Y Groes Windfarm Rhosgoch Rhosgoch Anglesey Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rhyd-y-Groes Wind Farm - repowering 9.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Gwynedd Country: Wales LPA: Isle of Anglesey County Council
|
Site ID and Reference: |
4312 / C1915
District:
|
Applicant: |
E.On / Eurus (TPG Wind)
Application :
20C102L/EIA/RE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
11 |
Turbine Capacity: |
0.90000000000000002 |
Height of Turbines: |
79 |
Calculated capacity: |
9.9 |
Site Address: |
near Amlwch, Anglesey
|
|
|
County: |
Gwynedd Region: Wales
|
OS Coordinates: |
240467 / 240467
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
4/12/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
3/11/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
10/21/2021 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rhyd Y Groes Windfarm - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00039RQWA
|
Capacity: |
7200
|
Status: |
Live
|
Accreditation Date: |
4/12/2015
|
|
|
Commission Date: |
9/1/1992
|
|
|
Applicant: |
TPG Wind Ltd
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Rhyd Y Groes Windfarm
RhosgochRhosgochAnglesey
Wales
|
Site Name: |
Rhyd Y Groes Windfarm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00505NWWA
|
Capacity: |
7200
|
Status: |
Live
|
Accreditation Date: |
4/12/2015
|
|
|
Commission Date: |
9/1/1992
|
|
|
Applicant: |
TPG Wind Ltd
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Rhyd Y Groes Windfarm
RhosgochRhosgochAnglesey
Wales
|
|
Assumptions: Capacity: 7200kW 7.2 MW, Thus over the month Capacity * 720 hours per month = 5184 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 1350 | 18.75% | Issued | 01/02/2018 | | | 1728 | 24.00% | Issued | 01/01/2018 | | | 2230 | 30.97% | Issued | 01/12/2017 | | | 2069 | 28.74% | Issued | 01/11/2017 | | | 1684 | 23.39% | Issued | 01/10/2017 | | | 2120 | 29.44% | Issued | 01/09/2017 | | | 1314 | 18.25% | Issued | 01/08/2017 | | | 1157 | 16.07% | Issued | 01/07/2017 | | | 1 | 0.01% | Revoked | 01/07/2017 | | | 917 | 12.74% | Issued | 01/06/2017 | | | 1656 | 23.00% | Issued | 01/05/2017 | | | 1029 | 14.29% | Issued | 01/04/2017 | | | 800 | 11.11% | Issued | 01/03/2017 | | | 1766 | 24.53% | Redeemed | 01/02/2017 | | | 1815 | 25.21% | Redeemed | 01/01/2017 | | | 1379 | 19.15% | Redeemed | Dec-16 | 0 | 1563 | 1563 | 21.71% | Issued | Nov-16 | 0 | 1577 | 1577 | 21.90% | Issued | Oct-16 | 0 | 884 | 890 | 12.36% | Issued | Sep-16 | 0 | 1495 | 1495 | 20.76% | Issued | Aug-16 | 0 | 1127 | 1135 | 15.76% | Issued | Jul-16 | 0 | 1104 | 1104 | 15.33% | Issued | Jun-16 | 0 | 545 | 555 | 7.71% | Issued | Jun-16 | 0 | 545 | 555 | 7.71% | Issued | May-16 | 0 | 1150 | 1157 | 16.07% | Issued | Apr-16 | 0 | 1289 | 1289 | 17.90% | Issued | Mar-16 | 0 | 1416 | 1416 | 19.67% | Redeemed | Feb-16 | 0 | 1750 | 1750 | 24.31% | Redeemed | Jan-16 | 0 | 2029 | 2029 | 28.18% | Redeemed | Nov-15 | 0 | 2448 | 2448 | 34.00% | Redeemed | Oct-15 | 0 | 778 | 786 | 10.92% | Redeemed | Sep-15 | 0 | 799 | 806 | 11.19% | Redeemed | Aug-15 | 0 | 1359 | 1359 | 18.88% | Redeemed | Jul-15 | 1458 | 1459 | 1459 | 20.26% | Redeemed | Jun-15 | 1107 | 1107 | 1107 | 15.38% | Redeemed | May-15 | 1454 | 1453 | 1453 | 20.18% | Redeemed | Apr-15 | 1237 | 1230 | 1237 | 17.18% | Redeemed | Mar-15 | 1740 | 1740 | 1740 | 24.17% | Redeemed | Feb-15 | 1323 | 1323 | 1323 | 18.38% | Redeemed | Jan-15 | 2189 | 2189 | 2189 | 30.40% | Redeemed | Dec-14 | 2477 | 2477 | 2477 | 34.40% | Redeemed | Nov-14 | 1097 | 1097 | 1097 | 15.24% | Redeemed | Oct-14 | 2104 | 2104 | 2104 | 29.22% | Redeemed | Sep-14 | 461 | 452 | 461 | 6.40% | Redeemed | Aug-14 | 1366 | 1366 | 1366 | 18.97% | Redeemed | Jul-14 | 727 | 718 | 727 | 10.10% | Redeemed | Jun-14 | 457 | 449 | 457 | 6.35% | Redeemed | May-14 | 1091 | 1085 | 1092 | 15.17% | Redeemed | Apr-14 | 1004 | 998 | 1004 | 13.94% | Redeemed | Mar-14 | 1580 | 1569 | 1580 | 21.94% | Redeemed | Feb-14 | 2272 | 2272 | 2272 | 31.56% | Redeemed | Jan-14 | 1978 | 1978 | 1977 | 27.46% | Redeemed | Dec-13 | 2716 | 2716 | 2716 | 37.72% | Redeemed | Nov-13 | 1354 | 1344 | 1354 | 18.81% | Redeemed | Oct-13 | 1725 | 1725 | 1724 | 23.94% | Redeemed | Sep-13 | 1104 | 1104 | 1104 | 15.33% | Redeemed | Aug-13 | 967 | 960 | 967 | 13.43% | Redeemed | Jul-13 | 637 | 629 | 637 | 8.85% | Redeemed | Jun-13 | 946 | 937 | 946 | 13.14% | Redeemed | May-13 | 1791 | 1791 | 1791 | 24.88% | Redeemed | Apr-13 | 1922 | 1922 | 1922 | 26.69% | Redeemed | Mar-13 | 1672 | 1672 | 1672 | 23.22% | Expired | Feb-13 | 1313 | 1313 | 1313 | 18.24% | Redeemed | Jan-13 | 1935 | 1934 | 1934 | 26.86% | Redeemed | Dec-12 | 1896 | 1896 | 1896 | 26.33% | Redeemed | Nov-12 | 1638 | 1639 | 1639 | 22.76% | Redeemed | Oct-12 | 1429 | 1429 | 1429 | 19.85% | Redeemed | Sep-12 | 1661 | 1661 | 1661 | 23.07% | Redeemed | Aug-12 | 1290 | 1290 | 1290 | 17.92% | Redeemed | Jul-12 | 1120 | 1111 | 1120 | 15.56% | Redeemed | Jun-12 | 1375 | 1368 | 1375 | 19.10% | Redeemed | May-12 | 1094 | 1087 | 1094 | 15.19% | Redeemed | Apr-12 | 1400 | 1392 | 1399 | 19.43% | Redeemed | Mar-12 | 1069 | 1058 | 1069 | 14.85% | Expired | Feb-12 | 1447 | 1447 | 1447 | 20.10% | Redeemed | Jan-12 | 2015 | 2015 | 2015 | 27.99% | Redeemed | Dec-11 | 2978 | 2978 | 2978 | 41.36% | Redeemed | Nov-11 | 1851 | 1851 | 1851 | 25.71% | Redeemed | Oct-11 | 2314 | 2314 | 2314 | 32.14% | Redeemed | Sep-11 | 2148 | 2148 | 2148 | 29.83% | Redeemed | Aug-11 | 984 | 974 | 984 | 13.67% | Redeemed | Jul-11 | 701 | 690 | 702 | 9.75% | Redeemed | Jun-11 | 1061 | 1053 | 1060 | 14.72% | Redeemed | May-11 | 2213 | 2213 | 2213 | 30.74% | Redeemed | Apr-11 | 1260 | 1251 | 1260 | 17.50% | Redeemed | Mar-11 | 1040 | 1028 | 1040 | 14.44% | Redeemed | Feb-11 | 1558 | 1558 | 1558 | 21.64% | Redeemed | Jan-11 | 1414 | 1407 | 1415 | 19.65% | Redeemed | Dec-10 | 1082 | 1075 | 1082 | 15.03% | Redeemed | Nov-10 | 1751 | 1751 | 1751 | 24.32% | Redeemed | Oct-10 | 1878 | 1878 | 1878 | 26.08% | Redeemed |
|
Capacity: 26.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|