Rothes Wind Farm (Wind , Active) Location in the UK : Scotland, Moray Type of installation: Wind on/offshore: on Turbines :39 Capacity : 50.6 MW Approx Date of 1st power generation: January 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Rothes Cairn Uish now simply Rothes wind farm. Also Rothes II.
Rothes II Wind Wind Farm is an extension of the Rothes Wind Farm, located 20 km south west of Elgin on the west coast of Scotland. The site is located close to the city of Elgin on the east coast of Scotland. The wind farm consist of 18 turbines, each rated at 2.3 MW, giving a total installed capacity of 41.4 MW.
Rothes Wind Wind Farm consists of 22 wind turbines (WTG), a metering building, two anemometer masts, underground MV/LV cables and SCADA cables, temporary construction compounds, access and onsite tracks and associated infrastructure.
Cairn Uish II
Model: |
Siemens SWT 2.3
|
Start Speed: |
4.5
|
Capacity: |
2.3
|
Optimal Speed: |
25
|
Rotor Diameter: |
101
|
Stop Speed: |
25
|
Hub Height |
78 Avg for all turbines:67
|
Avg. Elevation: |
312
|
Web Page: |
http://tinyurl.com/simens2-3 |
Comment: |
|
Cairn Uish II (Rothes II) Windfarm Yellow Bog Road Dallas Rothes IV36 2RZ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rothes Wind Farm III 132 MW
|
Energy Type: |
Wind Onshore |
County: |
Moray Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
6275 /
District:
|
Applicant: |
Fred Olsen Renewables
Application :
ECU00000474
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
4.7000000000000002 |
Height of Turbines: |
225 |
Calculated capacity: |
131.6 |
Site Address: |
Land near Rothes village, Moray
|
|
|
County: |
Moray Region: Scotland
|
OS Coordinates: |
321000 / 321000
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
2/1/2019
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
10/24/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
10/22/2027 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rothes Wind Farm (Extension) (II) 41.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Moray Council
|
Site ID and Reference: |
3951 / EN00295
District:
|
Applicant: |
Fred Olsen Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
41.4 |
Site Address: |
Rothes Windfarm, at Cairn Uish near Elgin
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
318500 / 318500
|
Development Status: |
Operational
|
Application Submitted: |
12/10/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2012
|
|
|
Generator Live |
4/15/2013
|
This Record Last Updated: |
8/30/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rothes Wind (Cairn Uish) 50.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3534 / N00053W
District:
|
Applicant: |
Natural Power Consultants
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
22 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
50.6 |
Site Address: |
Cairn Uish, 10km south of Elgin, Moray
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
318500 / 318500
|
Development Status: |
Operational
|
Application Submitted: |
9/27/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
11/1/2004
|
This Record Last Updated: |
5/31/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rothes2 Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01909NWSC
|
Capacity: |
40992
|
Status: |
Live
|
Accreditation Date: |
9/27/2001
|
|
|
Commission Date: |
2/21/2013
|
|
|
Applicant: |
Fred Olsen Renewables Ltd
|
Applicant Address: |
2nd Floor
64-65 Vincent Square
London
SW1P 2NU
England
|
Address: |
Cairn Uish II (Rothes II) Windfarm
Yellow Bog Road
Dallas
Rothes
IV36 2RZ
Scotland
|
|
Assumptions: Capacity: 40992kW 40.992 MW, Thus over the month Capacity * 720 hours per month = 29514.24 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 9932 | 24.23% | Issued | 01/02/2018 | | | 11161 | 27.23% | Issued | 01/01/2018 | | | 13982 | 34.11% | Issued | 01/12/2017 | | | 12436 | 30.34% | Issued | 01/11/2017 | | | 14325 | 34.95% | Issued | 01/10/2017 | | | 14671 | 35.79% | Issued | 01/10/2017 | | | 465 | 1.13% | Issued | 01/09/2017 | | | 9684 | 23.62% | Issued | 01/08/2017 | | | 7477 | 18.24% | Issued | 01/07/2017 | | | 6771 | 16.52% | Issued | 01/06/2017 | | | 8672 | 21.16% | Issued | 01/05/2017 | | | 6657 | 16.24% | Issued | 01/04/2017 | | | 12404 | 30.26% | Issued | 01/03/2017 | | | 10908 | 26.61% | Issued | 01/02/2017 | | | 13113 | 31.99% | Redeemed | 01/01/2017 | | | 14460 | 35.28% | Redeemed | Dec-16 | 0 | 16548 | 16548 | 40.37% | Pending Tr | Nov-16 | 0 | 9282 | 9282 | 22.64% | Pending Tr | Oct-16 | 0 | 4083 | 4083 | 9.96% | Pending Tr | Sep-16 | 0 | 9982 | 9982 | 24.35% | Pending Tr | Aug-16 | 0 | 7523 | 7523 | 18.35% | Pending Tr | Jul-16 | 0 | 6286 | 6286 | 15.33% | Pending Tr | Jun-16 | 0 | 4565 | 4608 | 11.24% | Pending Tr | Jun-16 | 0 | 4565 | 4608 | 11.24% | Pending Tr | May-16 | 0 | 6563 | 6563 | 16.01% | Pending Tr | Apr-16 | 0 | 7502 | 7502 | 18.30% | Pending Tr | Mar-16 | 0 | 7613 | 200 | 0.49% | Revoked | Feb-16 | 0 | 11091 | 11091 | 27.06% | Redeemed | Jan-16 | 0 | 14733 | 14733 | 35.94% | Redeemed | Dec-15 | 0 | 18360 | 18360 | 44.79% | Redeemed | Nov-15 | 0 | 15167 | 15167 | 37.00% | Redeemed | Oct-15 | 0 | 8803 | 8803 | 21.47% | Redeemed | Sep-15 | 0 | 7830 | 7830 | 19.10% | Redeemed | Aug-15 | 0 | 9101 | 9101 | 22.20% | Redeemed | Jul-15 | 7536 | 7536 | 6574 | 16.04% | Redeemed | Jun-15 | 5004 | 5004 | 5004 | 12.21% | Redeemed | May-15 | 12442 | 12443 | 12443 | 30.35% | Redeemed | Apr-15 | 7898 | 7898 | 4113 | 10.03% | Redeemed | Mar-15 | 13651 | 13652 | 13652 | 33.30% | Redeemed | Feb-15 | 14510 | 14510 | 14510 | 35.40% | Redeemed | Jan-15 | 20560 | 20559 | 20559 | 50.15% | Redeemed | Dec-14 | 16603 | 16604 | 16604 | 40.51% | Redeemed | Nov-14 | 9674 | 9673 | 9673 | 23.60% | Redeemed | Oct-14 | 12508 | 12508 | 12508 | 30.51% | Redeemed | Sep-14 | 5121 | 5093 | 4503 | 10.99% | Redeemed | Aug-14 | 8649 | 8649 | 8649 | 21.10% | Redeemed | Jul-14 | 6008 | 5976 | 6009 | 14.66% | Redeemed | Jun-14 | 3580 | 3551 | 3580 | 8.73% | Redeemed | May-14 | 4471 | 4447 | 1348 | 3.29% | Redeemed | Apr-14 | 10105 | 10104 | 10104 | 24.65% | Redeemed | Mar-14 | 15878 | 15879 | 11924 | 29.09% | Redeemed | Feb-14 | 16171 | 16171 | 2604 | 6.35% | Redeemed | Jan-14 | 16238 | 16238 | 9532 | 23.25% | Redeemed | Dec-13 | 20145 | 20145 | 20145 | 49.14% | Redeemed | Nov-13 | 14103 | 14102 | 14102 | 34.40% | Redeemed | Oct-13 | 12322 | 12322 | 9254 | 22.58% | Redeemed | Sep-13 | 9830 | 9831 | 9831 | 23.98% | Redeemed | Aug-13 | 7275 | 7275 | 7275 | 17.75% | Redeemed | Jul-13 | 5203 | 5172 | 5202 | 12.69% | Redeemed | Jun-13 | 4604 | 4579 | 600 | 1.46% | Expired | May-13 | 7227 | 7228 | 7228 | 17.63% | Redeemed | Apr-13 | 5007 | 5006 | 5006 | 12.21% | Redeemed | Mar-13 | 705 | 699 | 706 | 1.72% | Expired |
|
Capacity: 89.6999999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|