ONDBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718142 between ipint_start and ipint_end
Sorry I found no matches, Please try again. 176
DBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718142 between ipint_start and ipint_end
DEBUG: sql = insert into [energymaplocs].dbo.visitor (visitorip, visitorint, vREMOTE_HOST,visitdate, visitpage, getdatevisit, visitproject, visitorindustryid, [host_id]) values ('216.73.216.62', '3628718142', '216.73.216.62' ,'20251018 21:47:5','/project.asp?pageid=328' ,getdate() ,328 , 0, 1)
winddate 1 =
vid = 328select top 1 * from [energymaplocs].[dbo].vmain where id=328
pws_id = 371553pws_id = 371553
--------------------------------------------------------
(825) Page Access Control Pageid = 328
session(cansee) = NO
vservicetype =
vindustry = 0
vhostname =
vvisitor_rec = 1
vdonesurvey1 =
vaccesstodata = 0
value= -2 Show DandH
value = -1 Delay+Message
value=0 Public
value=1 Education
value=2 Search Engine
value=3 All Data
value=4 User
value=5 Admin
/ / 1session(custall):

Page views from this IP Range (Company) : All time = this month = today =
This IP this session = ( of 10)NO -/- YESWSHWS: ||||| showdata:NO WindNot Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 216.73.216.62
countall =
countmonth =
countday =
site_type = Wind
This IP this session = 1(0)Cansee = YES
ip2num = 3628718142 hostname = visitor_rec = 1 ipint_start = ipint_end = {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Royd Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Royd Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, South Yorkshire    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 6.5 MW
Approx Date of 1st power generation: November 1993

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

DEBUG comment: caniedit 1 = public
DEBUG comment: caniedit 2 = public
DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=328 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' )
The wind turbines are situated on a ridge 320m above sea level.
The site generates enough power to supply over 3500 homes and displaces the emission of 7345 tonnes of carbon dioxide each year.

The location is on "Spicer Hill" so there is always the risk of confusion with the Spicer Hill wind farm which is adjacent.


 Turbine Make and Specs

DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=77
Model: Bonus B500 Start Speed: 4
Capacity: 0.5 Optimal Speed: 15
Rotor Diameter: 50 Stop Speed: 25
Hub Height 35   Avg for all turbines:35 Avg. Elevation: 327
Web Page:
Comment:

 Address

Penistone

 Associated Companies.



DBUG:SQL Command = select top 40 * from energymaplocs.dbo.vco_proj_type where cp_project = 328 order by c_compname asc
Relationship Company (For: Royd Moor )
OwnerE.on UK
OperatorE.on UK

 DECC Data on this Project: Royd Moor :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

got here Got here pop 2 projectid = 328 vdeccref = -na-
DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '328' order by [planning application submitted] desc
Site Name: Royd Moor     5.9 MW
Energy Type: Wind Onshore
County: South Yorkshire     Country: England     LPA: Barnsley Metropolitan Borough Council
Site ID and Reference: 3432 / EN00109     District:
Applicant:     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 0.45000000000000001
Height of Turbines: Calculated capacity: 5.85
Site Address: Royd Moor, Penistone
 
County: South Yorkshire Region: Yorkshire and Humber
OS Coordinates: 422000 / 422000
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/1/1993 This Record Last Updated: 10/23/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Royd Moor: Wind : -na-

DEBUG Ofgemlib sql = select * from energymaplocs.dbo.ofgem1 where GeneratorID = '-na-'

 Calculations


Capacity: 13
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 10/18/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371553

Project Info
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Royd Moor%' and type_id=2 or (type_id=6 and project_id = 328 ) order by dated desc'
ViewEdit = 1 DocTypeID = 9 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Royd Moor%' and type_id=2 or (type_id=6 and project_id = 328 ) order by dated descbbc blog inc. Image of ROYD MOOR

E.on Renewables

EPR - Yorkshire Windpower Ltd

Go-ahead call for windfarm plans
Planning officers have recommended that councillors approve the development at Spicer Hill in Ingbirchworth, which is close to the existing ROYD MOOR windfarm, saying that the environmental benefits outweigh the possible impact on the landscape.

©2018 Simon Mallett
Latest News Added
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated desc'
ViewEdit = 1 DocTypeID = 2 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated descLarport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School