Sorry I found no matches, Please try again. 176
vid = 3388pws_id = 351110pws_id = 351110
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 2 Seen ) ID:1 Ind:0 IP: 3.145.180.152 {832) YESU WSHW: 2/10
Loading
Page views this IP this session = 2 of 10 unsubscribed pages

Twin Rivers Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Twin Rivers Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, twin rivers    
Type of installation: Wind    on/offshore: on
Turbines :14  Capacity : 28 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: aa 2mw turbine Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 80 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 2
Web Page:
Comment: For proposed projects where turbine yet to be agreed

 Address

Twin Rivers Wind Farm Nr Pasture Farm Swinefleet DN14 8EB England

 Associated Companies.

Relationship Company (For: Twin Rivers )
DeveloperCoop
OwnerCoop
ContractorI & H Brown

 DECC Data on this Project: Twin Rivers :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Twin Rivers     28.7 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 3657 / B0883     District:
Applicant: NTR     Application : 04/00505/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 14 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 28.7
Site Address: Moor Lane, Whitgift, East Riding of Yorkshire
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 472545 / 472545
Development Status: Operational
Application Submitted: 1/20/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/15/2015    
Generator Live 8/3/2016 This Record Last Updated: 4/26/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Twin Rivers: Wind :

Site Name: Twin Rivers Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00380RQEN
Capacity: 28413 Status: Live
Accreditation Date: 1/20/2004    
Commission Date: 8/3/2016    
Applicant: Twin Rivers Wind Farm Limited
Applicant Address: The Co-Operative Group 1 Angel Square MANCHESTER M60 0AG England
Address: Twin Rivers Wind Farm Nr Pasture Farm Swinefleet DN14 8EB England

Site Name: Twin Rivers Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G03009NWEN
Capacity: 28413 Status: Live
Accreditation Date: 1/20/2004    
Commission Date: 8/3/2016    
Applicant: Twin Rivers Wind Farm Limited
Applicant Address: The Co-Operative Group 1 Angel Square MANCHESTER M60 0AG England
Address: Twin Rivers Wind Farm Nr Pasture Farm Swinefleet DN14 8EB England
 
Assumptions: Capacity: 28413kW 28.413 MW,
Thus over the month Capacity * 720 hours per month = 20457.36 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 6273 22.08% Issued
01/03/2018 8828 31.07% Issued
01/02/2018 6916 24.34% Issued
01/01/2018 2729 9.60% Issued
01/01/2018 6532 22.99% Issued
01/12/2017 8040 28.30% Issued
01/11/2017 7010 24.67% Issued
01/10/2017 8651 30.45% Issued
01/09/2017 5194 18.28% Issued
01/08/2017 4511 15.88% Issued
01/07/2017 4422 15.56% Issued
01/06/2017 6064 21.34% Issued
01/05/2017 5009 17.63% Issued
01/04/2017 5409 19.04% Issued
01/03/2017 6664 23.45% Retired
01/02/2017 7308 25.72% Retired
01/01/2017 5575 19.62% Retired
Sep-16 00 4192 14.75% Issued
Aug-16 00 1786 6.29% Issued

 Calculations


Capacity: 56
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 56 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351110

Project Info
TWIN RIVERS WIND FARM

TWIN RIVERS Wind Farm
Construction has started on the Co-operative Group's 14 turbine wind farm in the East Riding of Yorkshire. Spawforths worked with the East Riding of Yorkshire Council

TWIN RIVERS, East Riding of Yorkshire
(2012) Developers are racing to get an unparalleled number of wind farms up and running before Renewables Obligation support is cut next April.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School