Rusholme Wind Farm (Wind , Active) Location in the UK : England, drax Type of installation: Wind on/offshore: on Turbines :12 Capacity : 24.6 MW Approx Date of 1st power generation: June 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The twelve 100m turbines at the Rusholme development will be situated about a mile east of the village of Drax and approximately half a mile north-west of the village of Airmyn, East Yorkshire.
Drax power station, near the River Ouse between Selby and Goole, is over twice the size of other power stations in the UK.
The hub of each of the wind farm’s 12 turbines will be at a height of 60m with 40m blades, meaning a total height of no greater than
100m.
The Rusholme development began after independent studies found that the area was suitable for a wind energy development, according to a statement from Wind Prospect Group.
Model: |
Senvion MM82
|
Start Speed: |
2.5
|
Capacity: |
2
|
Optimal Speed: |
6
|
Rotor Diameter: |
82
|
Stop Speed: |
12
|
Hub Height |
80 Avg for all turbines:60
|
Avg. Elevation: |
2
|
Web Page: |
http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf |
Comment: |
0
|
Rusholme Lane Drax Selby YO8 8PX England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rusholme Wind Farm 24 MW
|
Energy Type: |
Wind Onshore |
County: |
North Yorkshire Country: England LPA: Selby District Council
|
Site ID and Reference: |
3602 / N00333W
District:
|
Applicant: |
EDF/China General Nuclear Power Corporation
Application :
8/26/62/PA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
24 |
Site Address: |
Newland Wind Farm, Land at Pease Farm, Rushmere Grange, Newland
|
|
|
County: |
North Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
469500 / 469500
|
Development Status: |
Operational
|
Application Submitted: |
7/2/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2010
|
|
|
Generator Live |
10/4/2010
|
This Record Last Updated: |
12/18/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rusholme Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01825NWEN
|
Capacity: |
24550
|
Status: |
Live
|
Accreditation Date: |
7/2/2004
|
|
|
Commission Date: |
7/26/2010
|
|
|
Applicant: |
Rusholme Windfarm Ltd
|
Applicant Address: |
52 Grosvenor Gardens
Victoria
London
SW1W 0AU
England
|
Address: |
Rusholme Lane
Drax
Selby
YO8 8PX
England
|
|
Assumptions: Capacity: 24550kW 24.55 MW, Thus over the month Capacity * 720 hours per month = 17676 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 5352 | 21.80% | Issued | 01/02/2018 | | | 4014 | 16.35% | Issued | 01/01/2018 | | | 5641 | 22.98% | Issued | 01/12/2017 | | | 4975 | 20.26% | Issued | 01/11/2017 | | | 4424 | 18.02% | Issued | 01/10/2017 | | | 5520 | 22.48% | Issued | 01/09/2017 | | | 2808 | 11.44% | Issued | 01/08/2017 | | | 2205 | 8.98% | Issued | 01/07/2017 | | | 2407 | 9.80% | Issued | 01/06/2017 | | | 3613 | 14.72% | Issued | 01/05/2017 | | | 2810 | 11.45% | Issued | 01/04/2017 | | | 3297 | 13.43% | Issued | 01/03/2017 | | | 3804 | 15.49% | Redeemed | 01/02/2017 | | | 4294 | 17.49% | Redeemed | 01/01/2017 | | | 3132 | 12.76% | Redeemed | Dec-16 | 0 | 3500 | 3611 | 14.71% | Issued | Nov-16 | 0 | 3000 | 3000 | 12.22% | Issued | Oct-16 | 0 | 2272 | 2272 | 9.25% | Issued | Sep-16 | 0 | 2979 | 2979 | 12.13% | Issued | Aug-16 | 0 | 3061 | 3077 | 12.53% | Issued | Jul-16 | 0 | 2317 | 2332 | 9.50% | Issued | Jun-16 | 0 | 1736 | 1749 | 7.12% | Issued | Jun-16 | 0 | 1736 | 1749 | 7.12% | Issued | May-16 | 0 | 3083 | 3083 | 12.56% | Issued | Apr-16 | 0 | 3220 | 3220 | 13.12% | Issued | Mar-16 | 0 | 3299 | 3299 | 13.44% | Redeemed | Feb-16 | 0 | 5477 | 5477 | 22.31% | Redeemed | Jan-16 | 0 | 5709 | 5709 | 23.25% | Redeemed | Dec-15 | 0 | 8326 | 8326 | 33.91% | Redeemed | Nov-15 | 0 | 6474 | 6474 | 26.37% | Redeemed | Oct-15 | 0 | 2211 | 2229 | 9.08% | Redeemed | Sep-15 | 0 | 1663 | 1685 | 6.86% | Redeemed | Aug-15 | 0 | 2487 | 2503 | 10.20% | Redeemed | Jul-15 | 2164 | 2144 | 2164 | 8.81% | Redeemed | Jun-15 | 2622 | 2606 | 2622 | 10.68% | Redeemed | May-15 | 4658 | 4658 | 4658 | 18.97% | Redeemed | Apr-15 | 2873 | 2853 | 2873 | 11.70% | Redeemed | Mar-15 | 6008 | 6008 | 6008 | 24.47% | Redeemed | Feb-15 | 4400 | 4401 | 4401 | 17.93% | Redeemed | Jan-15 | 7254 | 7254 | 7254 | 29.55% | Redeemed | Dec-14 | 6226 | 6225 | 6225 | 25.36% | Redeemed | Nov-14 | 3216 | 3217 | 3217 | 13.10% | Redeemed | Oct-14 | 5200 | 5200 | 5200 | 21.18% | Redeemed | Sep-14 | 789 | 753 | 789 | 3.21% | Redeemed | Aug-14 | 3662 | 3662 | 3662 | 14.92% | Redeemed | Jul-14 | 1865 | 1843 | 1865 | 7.60% | Redeemed | Jun-14 | 1054 | 1025 | 1054 | 4.29% | Redeemed | May-14 | 2229 | 2211 | 2229 | 9.08% | Redeemed | Apr-14 | 2247 | 2233 | 2247 | 9.15% | Redeemed | Mar-14 | 4240 | 4240 | 4240 | 17.27% | Redeemed | Feb-14 | 7131 | 7131 | 7131 | 29.05% | Redeemed | Jan-14 | 6012 | 6012 | 1 | 0.00% | Redeemed | Dec-13 | 7196 | 7196 | 1 | 0.00% | Redeemed | Nov-13 | 3617 | 3617 | 3617 | 14.73% | Redeemed | Oct-13 | 6082 | 6081 | 6081 | 24.77% | Redeemed | Sep-13 | 2632 | 2617 | 2632 | 10.72% | Redeemed | Aug-13 | 2721 | 2705 | 2721 | 11.08% | Redeemed | Jul-13 | 1247 | 1219 | 1247 | 5.08% | Redeemed | Jun-13 | 2296 | 2284 | 2296 | 9.35% | Redeemed | May-13 | 4046 | 4046 | 4046 | 16.48% | Redeemed | Apr-13 | 5426 | 5427 | 5427 | 22.11% | Redeemed | Mar-13 | 4129 | 4129 | 4129 | 16.82% | Redeemed | Feb-13 | 3726 | 3726 | 3726 | 15.18% | Redeemed | Jan-13 | 4022 | 4021 | 4021 | 16.38% | Redeemed | Dec-12 | 5873 | 5874 | 5874 | 23.93% | Redeemed | Nov-12 | 4283 | 4283 | 4283 | 17.45% | Redeemed | Oct-12 | 3030 | 3029 | 3029 | 12.34% | Redeemed | Sep-12 | 3467 | 3468 | 3468 | 14.13% | Redeemed | Aug-12 | 2454 | 2437 | 2454 | 10.00% | Redeemed | Jul-12 | 1974 | 1957 | 1974 | 8.04% | Redeemed | Jun-12 | 3493 | 3492 | 3492 | 14.22% | Redeemed | May-12 | 2723 | 2708 | 2723 | 11.09% | Redeemed | Apr-12 | 2670 | 2671 | 2671 | 10.88% | Redeemed | Mar-12 | 2579 | 2555 | 2579 | 10.51% | Redeemed | Feb-12 | 4129 | 4129 | 4129 | 16.82% | Redeemed | Jan-12 | 6001 | 6001 | 6001 | 24.44% | Redeemed | Dec-11 | 7511 | 7511 | 7511 | 30.59% | Redeemed | Nov-11 | 4157 | 4157 | 4157 | 16.93% | Redeemed | Oct-11 | 5345 | 5345 | 5345 | 21.77% | Redeemed | Sep-11 | 4443 | 4443 | 4443 | 18.10% | Redeemed | Aug-11 | 2357 | 2340 | 2357 | 9.60% | Redeemed | Jul-11 | 2157 | 2139 | 2157 | 8.79% | Redeemed | Jun-11 | 2319 | 2307 | 2318 | 9.44% | Redeemed | May-11 | 5134 | 5135 | 5135 | 20.92% | Redeemed | Apr-11 | 3093 | 3075 | 3093 | 12.60% | Redeemed | Mar-11 | 2023 | 1995 | 2023 | 8.24% | Redeemed | Feb-11 | 4190 | 4190 | 4190 | 17.07% | Redeemed | Jan-11 | 4077 | 4078 | 4078 | 16.61% | Redeemed | Dec-10 | 2629 | 2609 | 2629 | 10.71% | Redeemed | Nov-10 | 4913 | 4913 | 4913 | 20.01% | Redeemed | Oct-10 | 3377 | 3377 | 3377 | 13.76% | Redeemed |
|
Capacity: 49.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|