Rusholme Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Rusholme Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, drax    
Type of installation: Wind    on/offshore: on
Turbines :12  Capacity : 24.6 MW
Approx Date of 1st power generation: June 2010

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The twelve 100m turbines at the Rusholme development will be situated about a mile east of the village of Drax and approximately half a mile north-west of the village of Airmyn, East Yorkshire.

Drax power station, near the River Ouse between Selby and Goole, is over twice the size of other power stations in the UK.

The hub of each of the wind farm’s 12 turbines will be at a height of 60m with 40m blades, meaning a total height of no greater than
100m.

The Rusholme development began after independent studies found that the area was suitable for a wind energy development, according to a statement from Wind Prospect Group.

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 80   Avg for all turbines:60 Avg. Elevation: 2
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Rusholme Lane Drax Selby YO8 8PX England

 Associated Companies.

Relationship Company (For: Rusholme )
OperatorEDF Energy Renewables
OwnerEDF Energy Renewables
DeveloperWind Prospect

 DECC Data on this Project: Rusholme :3602

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Rusholme Wind Farm     24 MW
Energy Type: Wind Onshore
County: North Yorkshire     Country: England     LPA: Selby District Council
Site ID and Reference: 3602 / N00333W     District:
Applicant: EDF/China General Nuclear Power Corporation     Application : 8/26/62/PA (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 24
Site Address: Newland Wind Farm, Land at Pease Farm, Rushmere Grange, Newland
 
County: North Yorkshire Region: Yorkshire and Humber
OS Coordinates: 469500 / 469500
Development Status: Operational
Application Submitted: 7/2/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2010    
Generator Live 10/4/2010 This Record Last Updated: 12/18/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Rusholme: Wind : G01825NWEN

Site Name: Rusholme Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01825NWEN
Capacity: 24550 Status: Live
Accreditation Date: 7/2/2004    
Commission Date: 7/26/2010    
Applicant: Rusholme Windfarm Ltd
Applicant Address: 52 Grosvenor Gardens Victoria London SW1W 0AU England
Address: Rusholme Lane Drax Selby YO8 8PX England
 
Assumptions: Capacity: 24550kW 24.55 MW,
Thus over the month Capacity * 720 hours per month = 17676 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 5352 21.80% Issued
01/02/2018 4014 16.35% Issued
01/01/2018 5641 22.98% Issued
01/12/2017 4975 20.26% Issued
01/11/2017 4424 18.02% Issued
01/10/2017 5520 22.48% Issued
01/09/2017 2808 11.44% Issued
01/08/2017 2205 8.98% Issued
01/07/2017 2407 9.80% Issued
01/06/2017 3613 14.72% Issued
01/05/2017 2810 11.45% Issued
01/04/2017 3297 13.43% Issued
01/03/2017 3804 15.49% Redeemed
01/02/2017 4294 17.49% Redeemed
01/01/2017 3132 12.76% Redeemed
Dec-16 03500 3611 14.71% Issued
Nov-16 03000 3000 12.22% Issued
Oct-16 02272 2272 9.25% Issued
Sep-16 02979 2979 12.13% Issued
Aug-16 03061 3077 12.53% Issued
Jul-16 02317 2332 9.50% Issued
Jun-16 01736 1749 7.12% Issued
Jun-16 01736 1749 7.12% Issued
May-16 03083 3083 12.56% Issued
Apr-16 03220 3220 13.12% Issued
Mar-16 03299 3299 13.44% Redeemed
Feb-16 05477 5477 22.31% Redeemed
Jan-16 05709 5709 23.25% Redeemed
Dec-15 08326 8326 33.91% Redeemed
Nov-15 06474 6474 26.37% Redeemed
Oct-15 02211 2229 9.08% Redeemed
Sep-15 01663 1685 6.86% Redeemed
Aug-15 02487 2503 10.20% Redeemed
Jul-15 21642144 2164 8.81% Redeemed
Jun-15 26222606 2622 10.68% Redeemed
May-15 46584658 4658 18.97% Redeemed
Apr-15 28732853 2873 11.70% Redeemed
Mar-15 60086008 6008 24.47% Redeemed
Feb-15 44004401 4401 17.93% Redeemed
Jan-15 72547254 7254 29.55% Redeemed
Dec-14 62266225 6225 25.36% Redeemed
Nov-14 32163217 3217 13.10% Redeemed
Oct-14 52005200 5200 21.18% Redeemed
Sep-14 789753 789 3.21% Redeemed
Aug-14 36623662 3662 14.92% Redeemed
Jul-14 18651843 1865 7.60% Redeemed
Jun-14 10541025 1054 4.29% Redeemed
May-14 22292211 2229 9.08% Redeemed
Apr-14 22472233 2247 9.15% Redeemed
Mar-14 42404240 4240 17.27% Redeemed
Feb-14 71317131 7131 29.05% Redeemed
Jan-14 60126012 1 0.00% Redeemed
Dec-13 71967196 1 0.00% Redeemed
Nov-13 36173617 3617 14.73% Redeemed
Oct-13 60826081 6081 24.77% Redeemed
Sep-13 26322617 2632 10.72% Redeemed
Aug-13 27212705 2721 11.08% Redeemed
Jul-13 12471219 1247 5.08% Redeemed
Jun-13 22962284 2296 9.35% Redeemed
May-13 40464046 4046 16.48% Redeemed
Apr-13 54265427 5427 22.11% Redeemed
Mar-13 41294129 4129 16.82% Redeemed
Feb-13 37263726 3726 15.18% Redeemed
Jan-13 40224021 4021 16.38% Redeemed
Dec-12 58735874 5874 23.93% Redeemed
Nov-12 42834283 4283 17.45% Redeemed
Oct-12 30303029 3029 12.34% Redeemed
Sep-12 34673468 3468 14.13% Redeemed
Aug-12 24542437 2454 10.00% Redeemed
Jul-12 19741957 1974 8.04% Redeemed
Jun-12 34933492 3492 14.22% Redeemed
May-12 27232708 2723 11.09% Redeemed
Apr-12 26702671 2671 10.88% Redeemed
Mar-12 25792555 2579 10.51% Redeemed
Feb-12 41294129 4129 16.82% Redeemed
Jan-12 60016001 6001 24.44% Redeemed
Dec-11 75117511 7511 30.59% Redeemed
Nov-11 41574157 4157 16.93% Redeemed
Oct-11 53455345 5345 21.77% Redeemed
Sep-11 44434443 4443 18.10% Redeemed
Aug-11 23572340 2357 9.60% Redeemed
Jul-11 21572139 2157 8.79% Redeemed
Jun-11 23192307 2318 9.44% Redeemed
May-11 51345135 5135 20.92% Redeemed
Apr-11 30933075 3093 12.60% Redeemed
Mar-11 20231995 2023 8.24% Redeemed
Feb-11 41904190 4190 17.07% Redeemed
Jan-11 40774078 4078 16.61% Redeemed
Dec-10 26292609 2629 10.71% Redeemed
Nov-10 49134913 4913 20.01% Redeemed
Oct-10 33773377 3377 13.76% Redeemed

 Calculations


Capacity: 49.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 49.2 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 322234

Project Info
RUSHOLME - 35 years is “temporary” for a wind farm

EDF : RUSHOLME

The RUSHOLME Wind Farm Community Benefit Fund

(2010) Wind farm is planned next to Drax power station
The hub of each of the wind farm’s 12 turbines will be at a height of 60m with 40m blades. The RUSHOLME development began after independent studies found that the area was suitable for a wind energy development.

Wind Turbines at RUSHOLME Wind Farm
Geograph: Wind Turbines at RUSHOLME Wind Farm

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School