Sorry I found no matches, Please try again. 176
vid = 3414pws_id = 322675pws_id = 322675 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.142.131.51 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Storr Lochs

Storr Lochs (Hydro , Active)

 General Information.

Location in the UK : Scotland, IV51 9EN    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 2.4 MW
Approx Date of 1st power generation: 1952

/YES

 Comment

Storr Lochs was built in 1950-52 and makes use of a gross head of water of 136m

 Address

Storr Lochs Power Station Bayfield Lane Near Portree Isle of Skye IV51 9EN Scotland

 Associated Companies.

Relationship Company (For: Storr Lochs )
OperatorScottish and Southern Energy

 DECC Data on this Project: Storr Lochs :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name:     MW
Energy Type:
County:     Country:     LPA:
Site ID and Reference: /     District:
Applicant:     Application : (Go to search to find Application)
Site Address:
 
County: Region:
OS Coordinates: /
Development Status:
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated:
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Storr Lochs: Hydro :

Site Name: Storr Lochs Power Station - A
Generator Type: Hydro 20MW DNC or less (ROS code = SE)
Scheme : RO Generator ID: R00075SESC
Capacity: 1800 Status: Live
Accreditation Date:    
Commission Date: 1/1/1952    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Storr Lochs Power Station Bayfield Lane Near Portree IV51 9EN Scotland

Site Name: Storr Lochs Power Station - A
Generator Type: Hydro
Scheme : REGO Generator ID: G00294HYSC
Capacity: 1800 Status: Live
Accreditation Date:    
Commission Date: 1/1/1952    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Storr Lochs Power Station Bayfield Lane Near Portree IV51 9EN Scotland
 
Assumptions: Capacity: 1800kW 1.8 MW,
Thus over the month Capacity * 720 hours per month = 1296 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1177 65.39% Issued
01/02/2018 1151 63.94% Issued
01/01/2018 1232 68.44% Issued
01/12/2017 1055 58.61% Issued
Feb-16 093 95 5.28% Redeemed
Jan-16 0956 956 53.11% Redeemed
Dec-15 0976 976 54.22% Retired
Nov-15 0975 975 54.17% Retired
Oct-15 0216 220 12.22% Retired
Sep-15 0595 599 33.28% Retired
Aug-15 010 12 0.67% Retired
May-15 586583 587 32.61% Redeemed
Apr-15 698694 698 38.78% Redeemed
Mar-15 752752 752 41.78% Redeemed
Feb-15 631630 630 35.00% Redeemed
Jan-15 428424 428 23.78% Redeemed
Dec-14 463460 463 25.72% Redeemed
Aug-14 141139 142 7.89% Redeemed
Jun-14 297294 297 16.50% Redeemed
May-14 501496 500 27.78% Redeemed
Apr-14 659654 659 36.61% Redeemed
Mar-14 838830 839 46.61% Redeemed
Feb-14 589585 590 32.78% Redeemed
Jan-14 715709 715 39.72% Redeemed
Dec-13 514509 514 28.56% Redeemed
Nov-13 905904 904 50.22% Redeemed
Oct-13 655652 1 0.06% Redeemed
Sep-13 783782 782 43.44% Redeemed
Aug-13 410408 411 22.83% Redeemed
Jul-13 252250 252 14.00% Redeemed
Jun-13 5956 59 3.28% Redeemed
May-13 758752 758 42.11% Redeemed
Apr-13 429424 429 23.83% Redeemed
Mar-13 449444 449 24.94% Redeemed
Feb-13 495490 494 27.44% Redeemed
Jan-13 862857 862 47.89% Redeemed
Dec-12 588584 589 32.72% Redeemed
Nov-12 763757 763 42.39% Redeemed
Oct-12 194189 194 10.78% Redeemed
Jun-12 7266 71 3.94% Redeemed
May-12 328322 328 18.22% Redeemed
Apr-12 237232 238 13.22% Redeemed
Mar-12 947940 947 52.61% Redeemed
Feb-12 11821175 1182 65.67% Redeemed
Jan-12 961955 961 53.39% Redeemed
Dec-11 637631 637 35.39% Redeemed
Oct-11 829823 829 46.06% Redeemed
Sep-11 10121007 1013 56.28% Redeemed
Aug-11 360354 360 20.00% Retired
Jul-11 264258 264 14.67% Retired
Jun-11 790782 789 43.83% Retired
May-11 517511 517 28.72% Retired
Apr-11 579573 579 32.17% Retired
Mar-11 807802 808 44.89% Redeemed
Feb-11 823818 822 45.67% Redeemed
Jan-11 832826 832 46.22% Redeemed
Dec-10 816812 817 45.39% Expired
Nov-10 738737 737 40.94% Expired
Oct-10 810810 810 45.00% Expired
Sep-10 743743 743 41.28% Expired

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School