Loading
Page views this IP this session = 6 of 10 unsubscribed pagesNewton Farm Solar Farm
Newton Farm Solar Farm (Solar , Active) Location in the UK : England, Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 8.1 MW Approx Date of 1st power generation: March 2014
/YES
North of Newton Farm Newton Farm Lytchett Minster BH16 6HR England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
North of Newton Farm 3 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Dorset Country: England LPA: Purbeck District Council
|
Site ID and Reference: |
2047 / IF1443
District:
|
Applicant: |
Primrose Solar
Application :
6/2013/0133
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Lytchett Minster, Poole, Dorset
|
|
|
County: |
Dorset Region: South West
|
OS Coordinates: |
393388 / 393388
|
Development Status: |
Operational
|
Application Submitted: |
3/6/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/19/2014
|
This Record Last Updated: |
3/6/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Newton Farm
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00177RUEN
|
Capacity: |
9272
|
Status: |
Live
|
Accreditation Date: |
3/6/2013
|
|
|
Commission Date: |
3/19/2014
|
|
|
Applicant: |
Equitix Solar (2) Limited
|
Applicant Address: |
3rd floor
Connaught House
1-3 Mount Street
London
W1K 3NB
England
|
Address: |
Newton Farm
Lytchett Minster
BH16 6HR
England
|
Project Info |
Residents’ fury at solar farm plans The farm, proposed by power company Camborne Energy, is comprised of three sites, ranging from 13.7 to 16.7 hectares. But it is the smallest of the three sites – the NEWTON FARM North site – that has caused the most consternation among villagers.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00