Somerton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Somerton Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Martham, Norfolk    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.5 MW
Approx Date of 1st power generation: July 2000

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

This one big windmill produces as much green electricity each year as ten smaller and older ones a couple of fields away. A great demonstration of the progress of wind energy, in just eight years

 Turbine Make and Specs

Model: Enercon E66 Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 66 Stop Speed: 25
Hub Height 65   Avg for all turbines:0 Avg. Elevation: 0
Web Page: http://blueplanetwind.com/wp-content/uploads/2011/07/Offer-Enercon-E66-1800-kW.pdf
Comment:

 Address

 Associated Companies.

Relationship Company (For: Somerton )
OperatorECOTRICITY Group Limited
DeveloperECOTRICITY Group Limited

 DECC Data on this Project: Somerton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: South Beach Wind Turbine (Somerton)     1.5 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Great Yarmouth Borough Council
Site ID and Reference: 2555 / 01023W5     District:
Applicant: Ecotricity     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.47
Height of Turbines: Calculated capacity: 1.47
Site Address: Somerton, Great Yarmouth, Norfolk
 
County: Norfolk Region: Eastern
OS Coordinates: 646953 / 646953
Development Status: Operational
Application Submitted: 5/21/1999 Planning Permission Granted
Application Determined: Permission refused: 4/28/2000
Construction Date:    
Generator Live 7/22/2000 This Record Last Updated: 5/9/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 4/28/2000

 OFGEM Data on this Project: Somerton: Wind :

Site Name: BLOOD HILL WIND TURBINE
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00029RQEN
Capacity: 1783 Status: Live
Accreditation Date: 5/21/1999    
Commission Date: 7/1/2000    
Applicant: Ecotricity Group Ltd
Applicant Address: Ecotricity Lion House Rowcroft Stroud GL5 3BY England
Address: Blood Hill Wind Turbine SomertonGreat Yarmouth Great Yarmouth NR29 4EY England

Site Name: BLOOD HILL WIND TURBINE
Generator Type: Wind
Scheme : REGO Generator ID: G00177NWEN
Capacity: 1783 Status: Live
Accreditation Date: 5/21/1999    
Commission Date: 7/1/2000    
Applicant: Ecotricity Group Ltd
Applicant Address: Ecotricity Lion House Rowcroft Stroud GL5 3BY England
Address: Blood Hill Wind Turbine SomertonGreat Yarmouth Great Yarmouth NR29 4EY England
 
Assumptions: Capacity: 1783kW 1.783 MW,
Thus over the month Capacity * 720 hours per month = 1283.76 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 230 12.90% Issued
01/04/2018 275 15.42% Issued
01/03/2018 235 13.18% Issued
01/02/2018 111 6.23% Issued
01/01/2018 432 24.23% Issued
01/12/2017 398 22.32% Issued
01/11/2017 214 12.00% Issued
01/10/2017 370 20.75% Issued
01/09/2017 177 9.93% Issued
01/08/2017 173 9.70% Issued
01/07/2017 160 8.97% Issued
01/06/2017 162 9.09% Issued
01/05/2017 83 4.66% Issued
01/04/2017 207 11.61% Issued
01/03/2017 287 16.10% Redeemed
01/02/2017 320 17.95% Redeemed
01/01/2017 250 14.02% Redeemed
Dec-16 0188 188 10.54% Issued
Nov-16 081 82 4.60% Issued
Oct-16 0182 182 10.21% Issued
Oct-16 00 182 10.21% Issued
Sep-16 0119 119 6.67% Issued
Aug-16 0149 149 8.36% Issued
Jul-16 0136 136 7.63% Issued
Jul-16 0136 136 7.63% Issued
Jun-16 0157 157 8.81% Issued
May-16 0277 277 15.54% Issued
Apr-16 0211 211 11.83% Issued
Mar-16 0228 228 12.79% Redeemed
Feb-16 0206 206 11.55% Redeemed
Jan-16 0235 235 13.18% Redeemed
Dec-15 0213 213 11.95% Redeemed
Nov-15 043 44 2.47% Redeemed
Oct-15 083 85 4.77% Redeemed
Sep-15 0216 216 12.11% Redeemed
Aug-15 0178 178 9.98% Redeemed
Jul-15 8787 87 4.88% Redeemed
Jun-15 151150 151 8.47% Redeemed
May-15 271271 271 15.20% Redeemed
Apr-15 244244 244 13.68% Redeemed
Mar-15 493493 493 27.65% Redeemed
Feb-15 360360 360 20.19% Redeemed
Jan-15 216216 216 12.11% Redeemed
Dec-14 413413 413 23.16% Redeemed
Nov-14 350351 351 19.69% Redeemed
Oct-14 307307 307 17.22% Redeemed
Sep-14 132132 132 7.40% Redeemed
Aug-14 306306 306 17.16% Redeemed
Jul-14 256256 256 14.36% Redeemed
Jun-14 162162 162 9.09% Redeemed
May-14 284284 284 15.93% Redeemed
Apr-14 281281 281 15.76% Redeemed
Mar-14 380380 380 21.31% Redeemed
Feb-14 631631 631 35.39% Redeemed
Jan-14 537537 537 30.12% Redeemed
Dec-13 568567 567 31.80% Redeemed
Nov-13 406406 406 22.77% Redeemed
Oct-13 512512 512 28.72% Redeemed
Sep-13 175175 175 9.81% Redeemed
Aug-13 193192 192 10.77% Redeemed
Jul-13 131131 131 7.35% Redeemed
Jun-13 272272 272 15.26% Redeemed
May-13 369369 369 20.70% Redeemed
Apr-13 409408 408 22.88% Redeemed
Mar-13 536537 537 30.12% Redeemed
Feb-13 411410 410 22.99% Redeemed
Jan-13 405405 405 22.71% Redeemed
Dec-12 532532 532 29.84% Redeemed
Nov-12 399399 399 22.38% Redeemed
Oct-12 328328 328 18.40% Redeemed
Sep-12 289289 289 16.21% Redeemed
Aug-12 232233 233 13.07% Redeemed
Jul-12 168167 167 9.37% Redeemed
Jun-12 402403 403 22.60% Redeemed
May-12 348347 347 19.46% Redeemed
Apr-12 379379 379 21.26% Redeemed
Mar-12 228228 228 12.79% Redeemed
Feb-12 395395 395 22.15% Redeemed
Jan-12 501501 501 28.10% Redeemed
Dec-11 651651 651 36.51% Redeemed
Nov-11 389389 389 21.82% Redeemed
Oct-11 416416 416 23.33% Redeemed
Sep-11 351351 351 19.69% Redeemed
Aug-11 207207 207 11.61% Redeemed
Jul-11 285285 285 15.98% Redeemed
Jun-11 239239 239 13.40% Redeemed
May-11 374374 374 20.98% Redeemed
Apr-11 287286 286 16.04% Redeemed
Mar-11 229229 229 12.84% Redeemed
Feb-11 446446 446 25.01% Redeemed
Jan-11 405405 405 22.71% Redeemed
Dec-10 383383 383 21.48% Redeemed
Nov-10 432432 432 24.23% Redeemed
Oct-10 399399 399 22.38% Redeemed

 Calculations


Capacity: 3
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 310077

Project Info
The Norfolk Broads and Windmills

SOMERTON residents give views after solar farm pay-out amount confirmed
Light Source, which operates the SOMERTON Door solar farm, confirmed in December that funding would be available for community projects.

Debate in SOMERTON over use for solar farm's "community pay-out"
The Western Gazette reported two weeks ago about a “community pay-out” from the SOMERTON Door solar farm. Light Source operates the solar farm on a 25-year lease, and offers money to the local community.

ET Solar constructs a new solar farm in Somerset, UK
Located at SOMERTON Door in southern Somerset, the solar farm is sited over 42 acres of which more than two-thirds of the allocated land area will remain open grassland.

Plans for 44 acre solar farm in SOMERTON
Lightsource Renewable Energy Ltd has outlined plans to put panels on just over 44 acres of land off SOMERTON Door Drove

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School