Sorry I found no matches, Please try again. 176
vid = 3548pws_id = 353226pws_id = 353226 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.147.73.89 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Malmaynes Solar Farm

Malmaynes Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, stoke kent    
Type of installation: Solar    on/offshore: on
Solar Panels :57000  Capacity : 12 MW
Acreage:60   or approx Hectares : 24
Approx Date of 1st power generation: March 2015

/YES

 Comment

On average, the annual electricity produced from the project will be of the order of 12,100,000 kWh, enough to power over 2,600 homes and prevent the emissions of up to 10,600 tonnes of CO2.
Electricity will be exported to the regional electricity network via an underground connection and then tee-in to an existing overhead line that crosses just to the north of the site, operated by UK Power Networks.

 Address

WSE Malmaynes Hall Limited Malmaynes Hall Road Stoke ME3 9SQ England

 Associated Companies.

Relationship Company (For: Malmaynes )
OperatorMagnetar
DeveloperWessex Solar Energy

 DECC Data on this Project: Malmaynes :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: MALMAYNES HALL FARM     12 MW
Energy Type: Solar Photovoltaics
County: Kent     Country: England     LPA: Medway Council
Site ID and Reference: 2135 / C1997     District:
Applicant: Wessex Solar Energy     Application : MC/14/2082 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: LAND OFF MALMAYNES HALL FARM, MALMAYNES HALL ROAD, STOKE, ROCHESTER, KENT
 
County: Kent Region: South East
OS Coordinates: 581725 / 581725
Development Status: Operational
Application Submitted: 7/31/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/15/2014    
Generator Live 3/31/2015 This Record Last Updated: 6/19/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 11/6/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Malmaynes: Solar :

Site Name: Malmaynes Solar
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00444RUEN
Capacity: 11880 Status: Live
Accreditation Date: 7/31/2014    
Commission Date: 3/31/2015    
Applicant: Perpetual Power (UK) Limited
Applicant Address: C/O Quintas Energy UK Ltd Suite C, 3rd Floor, 3 Harbour Exchange Square, London E14 9GE England
Address: WSE Malmaynes Hall Limited Malmaynes Hall Road Stoke ME3 9SQ England

Site Name: Malmaynes Solar
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06021PVEN
Capacity: 11880 Status: Live
Accreditation Date: 7/31/2014    
Commission Date: 3/31/2015    
Applicant: Perpetual Power (UK) Limited
Applicant Address: C/O Quintas Energy UK Ltd Suite C, 3rd Floor, 3 Harbour Exchange Square, London E14 9GE England
Address: WSE Malmaynes Hall Limited Malmaynes Hall Road Stoke ME3 9SQ England
 
Assumptions: Capacity: 11880kW 11.88 MW,
Thus over the month Capacity * 720 hours per month = 8553.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 857 7.21% Issued
01/02/2018 797 6.71% Issued
01/01/2018 433 3.64% Issued
01/12/2017 346 2.91% Issued
01/11/2017 589 4.96% Issued
01/10/2017 833 7.01% Issued
01/09/2017 1418 11.94% Issued
01/08/2017 1818 15.30% Issued
01/07/2017 2015 16.96% Issued
01/06/2017 2293 19.30% Issued
01/05/2017 1990 16.75% Issued
01/04/2017 1926 16.21% Issued
01/03/2017 1306 10.99% Redeemed
01/02/2017 550 4.63% Redeemed
01/01/2017 487 4.10% Redeemed
Dec-16 0319 232 1.95% Issued
Nov-16 0741 537 4.52% Issued
Oct-16 01392 1001 8.43% Issued
Sep-16 0988 705 5.93% Issued
Aug-16 02870 2050 17.26% Issued
Jul-16 03095 2210 18.60% Issued
Jun-16 02485 1775 14.94% Issued
Jun-16 02485 1775 14.94% Issued
May-16 02887 2062 17.36% Issued
Apr-16 02523 1802 15.17% Issued
Mar-16 01873 1338 11.26% Retired
Feb-16 01077 776 6.53% Retired
Dec-15 0370 272 2.29% Retired
Nov-15 0515 376 3.16% Retired
Oct-15 01263 909 7.65% Retired
Sep-15 02139 1528 12.86% Retired
Aug-15 02328 1663 14.00% Retired
Jul-15 16422298 1641 13.81% Redeemed
Jun-15 23543296 2354 19.81% Redeemed
May-15 18592602 1859 15.65% Redeemed
Apr-15 18952654 1895 15.95% Redeemed
Mar-15 6287 62 0.52% Redeemed

Project Info
Wessex Solar Energy: MALMAYNES Hall 12MW Solar Farm

St Mary Hoo Parish Council Report July /August 2014
The agenda for the last meeting was extended to include information on the potential for Wessex Solar Energy to construct an extensive Solar Park at MALMAYNES Hall Farm.

Wessex Solar Energy invites residents on the Hoo Peninsula to have their say
The company behind a planned solar park on the Hoo Peninsula is inviting residents to an information day.Wessex Solar Energy (WSE) hopes to install a solar park on 26 hectares of land at MALMAYNES Hall Farm, about 800m west of Lower Stoke.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School