Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTangy Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Tangy Wind Farm (Wind , Active) Location in the UK : Scotland, Argyll & Bute Type of installation: Wind on/offshore: on Turbines :22 Capacity : 18.7 MW Approx Date of 1st power generation: December 2002
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposal will see Tangy�s 22 existing turbines replaced with 15 modern machines; almost doubling the installed generating capacity of the wind farm. The upgrade allows SSE to reuse the existing site while delivering significantly more renewable energy but with seven fewer turbines than at present, made possible through advances in wind turbine design, technology and efficiency.
Model: |
Vestas V52-850
|
Start Speed: |
2.5
|
Capacity: |
0.85
|
Optimal Speed: |
6.5
|
Rotor Diameter: |
52
|
Stop Speed: |
12
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
169
|
Web Page: |
http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf |
Comment: |
|
Tangy Wind Farm Kilkenzie By Campbeltown PA28 6QD Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Tangy 4 Wind Farm 80 MW
|
Energy Type: |
Wind Onshore |
County: |
Argyll and Bute Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
6734 /
District:
|
Applicant: |
Scottish & Southern (SSE)
Application :
ECU00000673
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
16 |
Turbine Capacity: |
5 |
Height of Turbines: |
150 |
Calculated capacity: |
80 |
Site Address: |
Tangy, Kilkenzie, Campbeltown, Argyll And Bute
|
|
PA28 6QD
|
County: |
Argyll and Bute Region: Scotland
|
OS Coordinates: |
168500 / 168500
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
9/6/2018
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
5/28/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
12/20/2024 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tangy Wind Farm - repowering/Tangy 3 36.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Argyll & Bute Council
|
Site ID and Reference: |
4277 / B0995
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
14/02969/PP
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
16 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
125 |
Calculated capacity: |
54.4 |
Site Address: |
Tangy, Kilkenzie, Campbeltown, Argyll And Bute
|
|
PA28 6QD
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
168500 / 168500
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
12/11/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
10/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
6/29/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tangy Farm Wind Turbine 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Argyll & Bute Council
|
Site ID and Reference: |
3916 / C0704
District:
|
Applicant: |
Private Developer
Application :
12/02458/PP
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Tangy, Kilkenzie, Campbeltown, Argyll And Bute
|
|
PA28 6QD
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
168309 / 168309
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
11/16/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
12/5/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
3/24/2014 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tangy Wind Farm Extension/Tangy 2 6 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Argyll & Bute Council
|
Site ID and Reference: |
4024 / N00250W
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
0401291/DET
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
0.84999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
5.95 |
Site Address: |
Kilkenzie
, Campbelltown
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
177000 / 177000
|
Development Status: |
Operational
|
Application Submitted: |
7/1/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/1/2006
|
|
|
Generator Live |
6/17/2011
|
This Record Last Updated: |
1/25/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tangy Wind Farm/Tangy 1 12.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Argyll & Bute Council
|
Site ID and Reference: |
3467 / N00047W
District:
|
Applicant: |
Border Wind / Scottish and Southern (SSE)
Application :
94/0739/DET
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
15 |
Turbine Capacity: |
0.84999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
12.75 |
Site Address: |
Kilkenzie
, Cambeltown
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
168500 / 168500
|
Development Status: |
Operational
|
Application Submitted: |
6/12/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/26/2002
|
This Record Last Updated: |
1/18/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tangy Wind Farm - A
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00023SQSC
|
Capacity: |
18230
|
Status: |
Live
|
Accreditation Date: |
6/12/2001
|
|
|
Commission Date: |
11/1/2002
|
|
|
Applicant: |
SSE Generation Ltd
|
Applicant Address: |
Scottish Hydro Electric plc
Inveralmond House
200 Dunkeld Road
Perth
PH1 3AQ
Scotland
|
Address: |
Tangy Wind Farm
Kilkenzie
By Campbeltown
PA28 6QD
Scotland
|
Site Name: |
Tangy Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00297NWSC
|
Capacity: |
18230
|
Status: |
Live
|
Accreditation Date: |
6/12/2001
|
|
|
Commission Date: |
11/1/2002
|
|
|
Applicant: |
SSE Generation Ltd
|
Applicant Address: |
Scottish Hydro Electric plc
Inveralmond House
200 Dunkeld Road
Perth
PH1 3AQ
Scotland
|
Address: |
Tangy Wind Farm
Kilkenzie
By Campbeltown
PA28 6QD
Scotland
|
|
Assumptions: Capacity: 18230kW 18.23 MW, Thus over the month Capacity * 720 hours per month = 13125.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 3869 | 21.22% | Issued | 01/02/2018 | | | 4054 | 22.24% | Issued | 01/01/2018 | | | 5674 | 31.12% | Issued | 01/12/2017 | | | 3491 | 19.15% | Issued | 01/11/2017 | | | 4087 | 22.42% | Issued | 01/10/2017 | | | 4734 | 25.97% | Issued | 01/09/2017 | | | 3396 | 18.63% | Issued | 01/08/2017 | | | 1826 | 10.02% | Issued | 01/07/2017 | | | 2031 | 11.14% | Issued | 01/06/2017 | | | 2182 | 11.97% | Issued | 01/05/2017 | | | 2515 | 13.80% | Issued | 01/04/2017 | | | 3624 | 19.88% | Issued | 01/03/2017 | | | 4038 | 22.15% | Redeemed | 01/02/2017 | | | 4877 | 26.75% | Redeemed | 01/01/2017 | | | 4225 | 23.18% | Redeemed | Dec-16 | 0 | 3304 | 3324 | 18.23% | Retired | Nov-16 | 0 | 2267 | 2288 | 12.55% | Retired | Oct-16 | 0 | 3624 | 3624 | 19.88% | Retired | Sep-16 | 0 | 3579 | 3579 | 19.63% | Retired | Aug-16 | 0 | 2772 | 2789 | 15.30% | Retired | Jul-16 | 0 | 1717 | 1730 | 9.49% | Retired | Jun-16 | 0 | 1110 | 1133 | 6.22% | Retired | Jun-16 | 0 | 1110 | 1133 | 6.22% | Issued | May-16 | 0 | 2439 | 2457 | 13.48% | Issued | Apr-16 | 0 | 3477 | 3477 | 19.07% | Issued | Mar-16 | 0 | 2547 | 2564 | 14.06% | Redeemed | Feb-16 | 0 | 4604 | 4603 | 25.25% | Redeemed | Jan-16 | 0 | 5637 | 5637 | 30.92% | Redeemed | Dec-15 | 0 | 6926 | 6926 | 37.99% | Retired | Nov-15 | 0 | 5736 | 5736 | 31.46% | Retired | Oct-15 | 0 | 3017 | 3017 | 16.55% | Retired | Sep-15 | 0 | 3009 | 3009 | 16.51% | Retired | Aug-15 | 0 | 2108 | 2126 | 11.66% | Retired | Jul-15 | 2399 | 2385 | 2398 | 13.15% | Redeemed | Jun-15 | 1768 | 1747 | 1769 | 9.70% | Redeemed | May-15 | 4112 | 4112 | 4112 | 22.56% | Redeemed | Apr-15 | 2543 | 2528 | 2543 | 13.95% | Redeemed | Mar-15 | 4979 | 4979 | 4979 | 27.31% | Redeemed | Feb-15 | 3798 | 3799 | 3798 | 20.83% | Redeemed | Jan-15 | 5443 | 5443 | 5443 | 29.86% | Redeemed | Dec-14 | 5532 | 5532 | 5532 | 30.35% | Redeemed | Nov-14 | 3873 | 3872 | 3872 | 21.24% | Redeemed | Oct-14 | 4680 | 4680 | 4680 | 25.67% | Redeemed | Sep-14 | 1177 | 1156 | 1177 | 6.46% | Redeemed | Aug-14 | 3601 | 3602 | 3602 | 19.76% | Redeemed | Jul-14 | 1399 | 1380 | 1399 | 7.67% | Redeemed | Jun-14 | 1292 | 1272 | 1292 | 7.09% | Redeemed | May-14 | 1924 | 1910 | 1925 | 10.56% | Redeemed | Apr-14 | 3793 | 3793 | 3793 | 20.81% | Redeemed | Mar-14 | 5339 | 5339 | 5339 | 29.29% | Redeemed | Feb-14 | 6418 | 6418 | 6418 | 35.21% | Redeemed | Jan-14 | 5216 | 5216 | 1 | 0.01% | Redeemed | Dec-13 | 7528 | 7528 | 7529 | 41.30% | Redeemed | Nov-13 | 5255 | 5255 | 5255 | 28.83% | Redeemed | Oct-13 | 5191 | 5191 | 1 | 0.01% | Redeemed | Sep-13 | 3404 | 3404 | 3404 | 18.67% | Redeemed | Aug-13 | 2027 | 2011 | 2027 | 11.12% | Redeemed | Jul-13 | 957 | 931 | 957 | 5.25% | Redeemed | Jun-13 | 1751 | 1730 | 1751 | 9.61% | Redeemed | May-13 | 3749 | 3749 | 3749 | 20.57% | Redeemed | Apr-13 | 4358 | 4358 | 4358 | 23.91% | Redeemed | Mar-13 | 3603 | 3602 | 3603 | 19.76% | Redeemed | Feb-13 | 4035 | 4035 | 4035 | 22.13% | Redeemed | Jan-13 | 6048 | 6049 | 6048 | 33.18% | Redeemed | Dec-12 | 5938 | 5938 | 5938 | 32.57% | Redeemed | Nov-12 | 4282 | 4281 | 4281 | 23.48% | Redeemed | Oct-12 | 2836 | 2836 | 2836 | 15.56% | Redeemed | Sep-12 | 4404 | 4404 | 4404 | 24.16% | Redeemed | Aug-12 | 2958 | 2958 | 2959 | 16.23% | Redeemed | Jul-12 | 1874 | 1856 | 1874 | 10.28% | Redeemed | Jun-12 | 2635 | 2620 | 2635 | 14.45% | Redeemed | May-12 | 2707 | 2691 | 2707 | 14.85% | Redeemed | Apr-12 | 2506 | 2505 | 2506 | 13.75% | Redeemed | Mar-12 | 3449 | 3450 | 3449 | 18.92% | Redeemed | Feb-12 | 4742 | 4743 | 4742 | 26.01% | Redeemed | Jan-12 | 6131 | 6131 | 6131 | 33.63% | Redeemed | Dec-11 | 6624 | 6624 | 6624 | 36.34% | Redeemed | Nov-11 | 5824 | 5823 | 5823 | 31.94% | Redeemed | Oct-11 | 4996 | 4996 | 4996 | 27.41% | Redeemed | Sep-11 | 4732 | 4733 | 4733 | 25.96% | Redeemed | Aug-11 | 1967 | 1953 | 1967 | 10.79% | Retired | Jul-11 | 2030 | 2014 | 2030 | 11.14% | Retired | Jun-11 | 1581 | 1563 | 1581 | 8.67% | Retired | May-11 | 4777 | 4778 | 4777 | 26.20% | Retired | Apr-11 | 2551 | 2551 | 2551 | 13.99% | Retired | Mar-11 | 2231 | 2214 | 2232 | 12.24% | Redeemed | Feb-11 | 3782 | 3782 | 3782 | 20.75% | Redeemed | Jan-11 | 2391 | 2391 | 2391 | 13.12% | Redeemed | Dec-10 | 2363 | 2362 | 2362 | 12.96% | Expired | Nov-10 | 4029 | 4030 | 4029 | 22.10% | Expired | Oct-10 | 4249 | 4249 | 4250 | 23.31% | Expired | Sep-10 | 3691 | 3690 | 3691 | 20.25% | Expired |
|
Capacity: 37.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/7/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|