Sorry I found no matches, Please try again. 176
vid = 381pws_id = 353700pws_id = 353700
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.227.209.101 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Walkway Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Walkway Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, County Durham , Sedgefield    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 14 MW
Approx Date of 1st power generation: March 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Walkway wind farm is a Wind Prospect development of seven 2MW wind turbines within the Borough of Sedgefield in County Durham. A formal Planning Application was submitted and consented in 2005 by Sedgefield Borough Council for development.
Immediately adjacent to Butterwick scheme.

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 92
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

High Swainston Hartlepool Road Wynyard Billingham TS22 5LP

 Associated Companies.

Relationship Company (For: Walkway )
DeveloperWind Prospect
OperatorWind Prospect
OwnerWind Prospect

 DECC Data on this Project: Walkway :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Walkway     14 MW
Energy Type: Wind Onshore
County: County Durham     Country: England     LPA: Durham County Council
Site ID and Reference: 3606 / N00284W     District:
Applicant: Wind Prospect     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 14
Site Address: Sedgefield
 
County: County Durham Region: North East
OS Coordinates: 439000 / 439000
Development Status: Operational
Application Submitted: 11/1/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 5/15/2008 This Record Last Updated: 5/6/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Walkway: Wind : -na-

 Calculations


Capacity: 4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 353700

Project Info
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School