Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBallymena Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Ballymena Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co. Antrim BT42 4HZ Type of installation: Wind on/offshore: on Turbines :2 Capacity : 4.7 MW Approx Date of 1st power generation: February 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Ballymena, wind park and Ballymena Michelin Tyre factory ... The same ???
The two Ballymena turbines will generate enough electricity to power the equivalent of three and a half thousand average homes a year, powering the factory directly,
Model: |
Enercon E82
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
82
|
Stop Speed: |
31
|
Hub Height |
79 Avg for all turbines:79
|
Avg. Elevation: |
50
|
Web Page: |
http://www.enercon.de/en-en/62.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Michelin Tyre PLC Raceview Road Ballymena BT42 4HZ Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
The Michelin Tyre Factory - Ballymena 4.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3680 / A0121
District:
|
Applicant: |
Ecotricity
Application :
G/2009/0470/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
4.6 |
Site Address: |
Raceview Road, Broughshane, Woodside Road, Ballymena, Co Antrim. BT42 4J
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
130743 / 130743
|
Development Status: |
Operational
|
Application Submitted: |
7/24/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/11/2012
|
|
|
Generator Live |
2/25/2013
|
This Record Last Updated: |
4/19/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ballymena Wind Park Limited 4.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
2866 / B0823
District:
|
Applicant: |
White Young Green Planning
Application :
G/2009/0470/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2.3500000000000001 |
Height of Turbines: |
|
Calculated capacity: |
4.7 |
Site Address: |
Michelin Tyre PLC Raceview Road Ballymena BT42 4HZ Northern Ireland
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
128574 / 128574
|
Development Status: |
Operational
|
Application Submitted: |
7/24/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/24/2013
|
This Record Last Updated: |
8/16/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ballymena Wind Park Limited
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00162NQNI
|
Capacity: |
4644
|
Status: |
Live
|
Accreditation Date: |
7/24/2009
|
|
|
Commission Date: |
1/24/2013
|
|
|
Applicant: |
Ecotricity Group Ltd
|
Applicant Address: |
Ecotricity
Lion House
Rowcroft
Stroud
GL5 3BY
England
|
Address: |
Michelin Tyre PLC
Raceview Road
Ballymena
BT424HZ
Northern Ireland
|
Site Name: |
Ballymena Wind Park Limited
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00293NWNI
|
Capacity: |
4644
|
Status: |
Live
|
Accreditation Date: |
7/24/2009
|
|
|
Commission Date: |
1/24/2013
|
|
|
Applicant: |
Ecotricity Group Ltd
|
Applicant Address: |
Ecotricity
Lion House
Rowcroft
Stroud
GL5 3BY
England
|
Address: |
Michelin Tyre PLC
Raceview Road
Ballymena
BT424HZ
Northern Ireland
|
|
Assumptions: Capacity: 4644kW 4.644 MW, Thus over the month Capacity * 720 hours per month = 3343.68 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 429 | 9.24% | Issued | 01/04/2018 | | | 323 | 6.96% | Issued | 01/03/2018 | | | 675 | 14.53% | Issued | 01/02/2018 | | | 361 | 7.77% | Issued | 01/01/2018 | | | 429 | 9.24% | Issued | 01/12/2017 | | | 301 | 6.48% | Issued | 01/11/2017 | | | 482 | 10.38% | Issued | 01/10/2017 | | | 921 | 19.83% | Issued | 01/09/2017 | | | 587 | 12.64% | Issued | 01/08/2017 | | | 449 | 9.67% | Issued | 01/07/2017 | | | 479 | 10.31% | Issued | 01/06/2017 | | | 649 | 13.98% | Issued | 01/05/2017 | | | 567 | 12.21% | Issued | 01/04/2017 | | | 623 | 13.42% | Issued | 01/03/2017 | | | 742 | 15.98% | Redeemed | 01/02/2017 | | | 969 | 20.87% | Redeemed | 01/01/2017 | | | 732 | 15.76% | Redeemed | Dec-16 | | 838 | 838 | 18.04% | Issued | Nov-16 | | 281 | 282 | 6.07% | Issued | Oct-16 | | 577 | 577 | 12.42% | Issued | Oct-16 | | 0 | 577 | 12.42% | Issued | Sep-16 | | 709 | 709 | 15.27% | Issued | Aug-16 | | 517 | 517 | 11.13% | Issued | Jul-16 | | 325 | 325 | 7.00% | Issued | Jul-16 | | 325 | 325 | 7.00% | Issued | Jun-16 | | 292 | 292 | 6.29% | Issued | May-16 | | 795 | 795 | 17.12% | Issued | Apr-16 | | 760 | 760 | 16.37% | Issued | Mar-16 | | 618 | 618 | 13.31% | Redeemed | Feb-16 | | 991 | 991 | 21.34% | Redeemed | Jan-16 | | 1075 | 1075 | 23.15% | Redeemed | Dec-15 | | 1494 | 1494 | 32.17% | Redeemed | Nov-15 | | 1008 | 1008 | 21.71% | Redeemed | Oct-15 | | 548 | 548 | 11.80% | Redeemed | Sep-15 | | 481 | 481 | 10.36% | Redeemed | Aug-15 | | 545 | 545 | 11.74% | Redeemed | Jul-15 | 563 | 563 | 563 | 12.12% | Redeemed | Jun-15 | 626 | 626 | 626 | 13.48% | Redeemed | May-15 | 794 | 794 | 794 | 17.10% | Redeemed | Apr-15 | 471 | 471 | 471 | 10.14% | Redeemed | Mar-15 | 767 | 767 | 767 | 16.52% | Redeemed | Feb-15 | 641 | 641 | 641 | 13.80% | Redeemed | Jan-15 | 1077 | 1077 | 1077 | 23.19% | Redeemed | Dec-14 | 773 | 772 | 772 | 16.62% | Redeemed | Nov-14 | 673 | 674 | 674 | 14.51% | Redeemed | Oct-14 | 905 | 904 | 904 | 19.47% | Redeemed | Sep-14 | 208 | 208 | 209 | 4.50% | Redeemed | Aug-14 | 654 | 654 | 654 | 14.08% | Redeemed | Jul-14 | 331 | 330 | 330 | 7.11% | Redeemed | Jun-14 | 362 | 362 | 362 | 7.80% | Redeemed | May-14 | 475 | 475 | 475 | 10.23% | Redeemed | Apr-14 | 746 | 747 | 747 | 16.09% | Redeemed | Mar-14 | 946 | 945 | 945 | 20.35% | Redeemed | Feb-14 | 1163 | 1164 | 1163 | 25.04% | Redeemed | Jan-14 | 1018 | 1018 | 1018 | 21.92% | Redeemed | Dec-13 | 1009 | 1009 | 1009 | 21.73% | Redeemed | Nov-13 | 536 | 535 | 535 | 11.52% | Redeemed | Oct-13 | 857 | 857 | 857 | 18.45% | Redeemed | Sep-13 | 542 | 542 | 542 | 11.67% | Redeemed | Aug-13 | 477 | 477 | 477 | 10.27% | Redeemed | Jul-13 | 249 | 249 | 249 | 5.36% | Redeemed | Jun-13 | 369 | 369 | 369 | 7.95% | Redeemed | May-13 | 827 | 828 | 828 | 17.83% | Redeemed | Apr-13 | 816 | 816 | 816 | 17.57% | Redeemed | Mar-13 | 836 | 836 | 836 | 18.00% | Redeemed | Feb-13 | | 177 | 176 | 3.79% | Redeemed |
|
Capacity: 9.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 6/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|