Loading
Page views this IP this session = 9 of 10 unsubscribed pagesWest Knock Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
West Knock Wind Farm (Wind , Active) Location in the UK : Scotland, AB42 5DJ Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.4 MW Approx Date of 1st power generation: April 2011
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
West Knock Farm Operational
Model: |
Enercon E48
|
Start Speed: |
5
|
Capacity: |
0.8
|
Optimal Speed: |
15
|
Rotor Diameter: |
48
|
Stop Speed: |
25
|
Hub Height |
56 Avg for all turbines:56
|
Avg. Elevation: |
86
|
Web Page: |
http://www.enercon.de/en-en/492.htm |
Comment: |
Hub height: 50 m / 55 m / 60 m / 76 m
Stated as being ideal machine for any site
|
Mintlaw, Stuartfield, Peterhead, Grampian. AB42 5DJ
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
West Knock Wind Cluster 2.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3681 / A0131
District:
|
Applicant: |
West Knock Farm
Application :
APP/2009/2439
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
0.80000000000000004 |
Height of Turbines: |
|
Calculated capacity: |
2.4 |
Site Address: |
Mintlaw, Stuartfield, Peterhead, Grampian. AB42 5DJ
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
398494 / 398494
|
Development Status: |
Operational
|
Application Submitted: |
7/27/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/4/2011
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
West Knock Wind Cluster
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00168SQSC
|
Capacity: |
2370
|
Status: |
Live
|
Accreditation Date: |
7/27/2009
|
|
|
Commission Date: |
11/2/2011
|
|
|
Applicant: |
Stuartfield Wind Power Limited
|
Applicant Address: |
West Knock
Mintlaw
PETERHEAD
AB42 5DJ
Scotland
|
Address: |
West Knock Farm
Stuartfield, Peterhead
AB42 5DJ
Scotland
|
Site Name: |
West Knock Wind Cluster
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01748NWSC
|
Capacity: |
2370
|
Status: |
Live
|
Accreditation Date: |
7/27/2009
|
|
|
Commission Date: |
11/2/2011
|
|
|
Applicant: |
Stuartfield Wind Power Limited
|
Applicant Address: |
West Knock
Mintlaw
PETERHEAD
AB42 5DJ
Scotland
|
Address: |
West Knock Farm
Stuartfield, Peterhead
AB42 5DJ
Scotland
|
|
Assumptions: Capacity: 2370kW 2.37 MW, Thus over the month Capacity * 720 hours per month = 1706.4 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 423 | 17.85% | Issued | 01/03/2018 | | | 707 | 29.83% | Issued | 01/02/2018 | | | 683 | 28.82% | Issued | 01/01/2018 | | | 737 | 31.10% | Issued | 01/08/2017 | | | 371 | 15.65% | Issued | 01/07/2017 | | | 320 | 13.50% | Issued | 01/06/2017 | | | 342 | 14.43% | Retired | 01/05/2017 | | | 391 | 16.50% | Issued | 01/04/2017 | | | 652 | 27.51% | Issued | 01/03/2017 | | | 506 | 21.35% | Issued | 01/02/2017 | | | 750 | 31.65% | Issued | 01/01/2017 | | | 772 | 32.57% | Issued | Dec-16 | 0 | 715 | 715 | 30.17% | Issued | Nov-16 | 0 | 558 | 558 | 23.54% | Issued | Oct-16 | 0 | 426 | 426 | 17.97% | Issued | Sep-16 | 0 | 642 | 642 | 27.09% | Issued | Aug-16 | 0 | 396 | 396 | 16.71% | Issued | Jul-16 | 0 | 244 | 244 | 10.30% | Issued | Jun-16 | 0 | 353 | 353 | 14.89% | Issued | May-16 | 0 | 452 | 452 | 19.07% | Issued | Apr-16 | 0 | 532 | 532 | 22.45% | Issued | Mar-16 | 0 | 494 | 494 | 20.84% | Issued | Feb-16 | 0 | 687 | 687 | 28.99% | Issued | Dec-15 | 0 | 1005 | 1005 | 42.41% | Redeemed | Nov-15 | 0 | 667 | 667 | 28.14% | Redeemed | Oct-15 | 0 | 479 | 479 | 20.21% | Redeemed | Sep-15 | 0 | 534 | 534 | 22.53% | Redeemed | Aug-15 | 0 | 511 | 511 | 21.56% | Issued | Jul-15 | 362 | 362 | 362 | 15.27% | Redeemed | Jun-15 | 389 | 390 | 390 | 16.46% | Redeemed | May-15 | 608 | 608 | 608 | 25.65% | Redeemed | Apr-15 | 434 | 435 | 435 | 18.35% | Redeemed | Mar-15 | 706 | 706 | 706 | 29.79% | Redeemed | Feb-15 | 741 | 741 | 741 | 31.27% | Redeemed | Jan-15 | 1013 | 1013 | 1013 | 42.74% | Redeemed | Dec-14 | 734 | 734 | 734 | 30.97% | Redeemed | Nov-14 | 622 | 622 | 622 | 26.24% | Redeemed | Oct-14 | 780 | 780 | 780 | 32.91% | Redeemed | Sep-14 | 317 | 317 | 317 | 13.38% | Redeemed | Aug-14 | 517 | 517 | 177 | 7.47% | Redeemed | Jul-14 | 299 | 298 | 298 | 12.57% | Redeemed | Jun-14 | 255 | 256 | 256 | 10.80% | Redeemed | May-14 | 283 | 282 | 282 | 11.90% | Redeemed | Apr-14 | 478 | 478 | 478 | 20.17% | Redeemed | Mar-14 | 628 | 629 | 629 | 26.54% | Expired | Feb-14 | 955 | 955 | 955 | 40.30% | Redeemed | Jan-14 | 947 | 947 | 947 | 39.96% | Redeemed | Dec-13 | 1130 | 1130 | 1130 | 47.68% | Redeemed | Nov-13 | 696 | 696 | 696 | 29.37% | Redeemed | Oct-13 | 715 | 715 | 715 | 30.17% | Expired | Sep-13 | 505 | 505 | 505 | 21.31% | Redeemed | Aug-13 | 387 | 386 | 386 | 16.29% | Redeemed | Jul-13 | 224 | 224 | 201 | 8.48% | Redeemed | Jun-13 | 280 | 280 | 280 | 11.81% | Expired | May-13 | 631 | 631 | 631 | 26.62% | Redeemed | Apr-13 | 600 | 600 | 600 | 25.32% | Redeemed | Mar-13 | 574 | 575 | 16 | 0.68% | Revoked | Feb-13 | 590 | 591 | 591 | 24.94% | Expired | Jan-13 | 788 | 788 | 788 | 33.25% | Redeemed | Dec-12 | 788 | 788 | 788 | 33.25% | Redeemed | Nov-12 | 616 | 616 | 616 | 25.99% | Redeemed | Oct-12 | 346 | 346 | 346 | 14.60% | Redeemed | Sep-12 | 476 | 475 | 475 | 20.04% | Redeemed | Aug-12 | 369 | 370 | 370 | 15.61% | Redeemed | Jul-12 | 277 | 277 | 277 | 11.69% | Redeemed | Jun-12 | 365 | 365 | 365 | 15.40% | Redeemed | May-12 | 307 | 307 | 307 | 12.95% | Redeemed | Apr-12 | 424 | 424 | 424 | 17.89% | Redeemed | Mar-12 | 593 | 593 | 593 | 25.02% | Redeemed | Feb-12 | 724 | 723 | 723 | 30.51% | Redeemed | Jan-12 | 832 | 832 | 832 | 35.11% | Redeemed | Dec-11 | 830 | 830 | 830 | 35.02% | Redeemed | Nov-11 | 693 | 693 | 693 | 29.24% | Redeemed | Oct-11 | 0 | 0 | 5 | 0.21% | Expired |
|
Capacity: 4.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|