Sorry I found no matches, Please try again. 176
vid = 4045pws_id = 353243pws_id = 353243
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.143.23.38 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Mains of Hatton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Mains of Hatton Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Kirktown of Auchterless Aberdeenshire    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 2.4 MW
Approx Date of 1st power generation: March 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Eco2 /GreenCAT Operational

 Turbine Make and Specs

Model: Enercon E48 Start Speed: 5
Capacity: 0.8 Optimal Speed: 15
Rotor Diameter: 48 Stop Speed: 25
Hub Height 55   Avg for all turbines:55 Avg. Elevation: 151
Web Page: http://www.enercon.de/en-en/492.htm
Comment: Hub height: 50 m / 55 m / 60 m / 76 m Stated as being ideal machine for any site

 Address

Mains of Hatton Kirktown of Auchterless Turriff AB53 8AX Scotland

 Associated Companies.

Relationship Company (For: Mains of Hatton )
ContractorAlpha Real Renewables
DeveloperEco2 Ltd
DeveloperGreenCat Renewables
ContractorRaymond Brown Renewables

 DECC Data on this Project: Mains of Hatton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Mains of Hatton     2.4 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3980 / EN00532     District:
Applicant: Eco2 /GreenCAT     Application : APP/2006/4452 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 0.80000000000000004
Height of Turbines: Calculated capacity: 2.4
Site Address: Kirktown of Auchterless Aberdeenshire
 
County: Grampian Region: Scotland
OS Coordinates: 396115 / 396115
Development Status: Operational
Application Submitted: 11/16/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/1/2011    
Generator Live 3/20/2012 This Record Last Updated: 2/25/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Mains of Hatton: Wind :

Site Name: Mains of Hatton
Generator Type: Wind
Scheme : REGO Generator ID: G01754NWSC
Capacity: 2090 Status: Live
Accreditation Date: 11/16/2006    
Commission Date: 2/7/2012    
Applicant: WIND ENERGY RENEWABLES LLP
Applicant Address: Time Investments 6th Floor Euston Road LONDON NW1 3BG England
Address: Mains of Hatton Kirktown of Auchterless Turriff AB53 8AX Scotland
 
Assumptions: Capacity: 2090kW 2.09 MW,
Thus over the month Capacity * 720 hours per month = 1504.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/12/2016 - 31/12/2016 00 568 27.18% Issued
01/11/2016 - 30/11/2016 00 520 24.88% Issued
01/10/2016 - 31/10/2016 00 333 15.93% Issued
01/09/2016 - 30/09/2016 00 419 20.05% Issued
01/08/2016 - 31/08/2016 00 348 16.65% Issued
01/07/2016 - 31/07/2016 00 237 11.34% Issued
Jun-16 00 333 15.93% Issued
May-16 00 360 17.22% Issued
Apr-16 00 515 24.64% Issued
Feb-16 00 616 29.47% Pending Tr
Dec-15 00 687 32.87% Pending Tr
Nov-15 00 619 29.62% Issued
Oct-15 00 356 17.03% Issued
Sep-15 00 468 22.39% Pending Tr
Aug-15 00 376 17.99% Pending Tr
Jul-15 3630 367 17.56% Expired
Jun-15 3390 343 16.41% Expired
May-15 5650 573 27.42% Expired
Apr-15 4050 409 19.57% Expired
Mar-15 6010 607 29.04% Expired
Feb-15 6160 622 29.76% Expired
Jan-15 9250 936 44.78% Expired
Dec-14 7550 763 36.51% Expired
Nov-14 4770 483 23.11% Expired
Oct-14 5040 513 24.55% Expired
Sep-14 1920 194 9.28% Expired
Aug-14 4690 469 22.44% Expired
Jul-14 2320 232 11.10% Expired
Jun-14 1930 193 9.23% Expired
May-14 2050 205 9.81% Expired
Apr-14 2960 297 14.21% Expired
Mar-14 3990 398 19.04% Expired
Feb-14 4140 414 19.81% Expired
Jan-14 4380 438 20.96% Expired
Dec-13 5020 501 23.97% Expired
Nov-13 4500 450 21.53% Expired
Oct-13 3320 332 15.89% Expired
Sep-13 2760 276 13.21% Expired
Aug-13 1730 173 8.28% Expired
Jul-13 1320 132 6.32% Expired
Jun-13 1610 161 7.70% Expired
May-13 2780 277 13.25% Expired
Apr-13 1570 157 7.51% Expired
Mar-13 1430 144 6.89% Expired
Feb-13 1510 151 7.22% Expired
Jan-13 1740 174 8.33% Expired
Dec-12 1980 198 9.47% Expired
Nov-12 1600 160 7.66% Redeemed
Oct-12 1130 113 5.41% Redeemed
Sep-12 760 76 3.64% Redeemed
Aug-12 520 53 2.54% Expired
Jul-12 870 87 4.16% Expired
Jun-12 1060 106 5.07% Expired
May-12 980 98 4.69% Expired
Apr-12 1240 124 5.93% Expired
Mar-12 1530 152 7.27% Expired
Feb-12 1280 127 6.08% Expired

 Calculations


Capacity: 4.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353243

Project Info
MAINS OF HATTON Wind Farm
After successfully completing the construction phase, Eco2 is currently managing the operation of the wind farm on behalf of the new owners.

MAINS OF HATTON 2.1 MW wind farm
Located in Turriff, Aberdeenshire, the MAINS OF HATTON 2.1 MW project consists of three E48/800kW Enercon wind turbines.

Eco2: MAINS OF HATTON Wind Farm

Planning » Application Map

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School