Page views this IP this session = 5 of 10 unsubscribed pagesNew Albion Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
New Albion Wind Farm (Wind , Active) Location in the UK : England, NN14 1QT Type of installation: Wind on/offshore: on Turbines :7 Capacity : 14.35 MW Approx Date of 1st power generation: January 2016
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
John Laing Operational
Model: |
Senvion MM82
|
Start Speed: |
2.5
|
Capacity: |
2
|
Optimal Speed: |
6
|
Rotor Diameter: |
82
|
Stop Speed: |
12
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
120
|
Web Page: |
http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf |
Comment: |
0
|
New Albion windfarm Town Close Farm (land at) Rushton Kettering NN14 1QP England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
New Albion Wind Farm 14.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Northamptonshire Country: England LPA: Kettering Borough Council
|
Site ID and Reference: |
4513 / EN00576
District:
|
Applicant: |
John Laing Environmental Assets Group
Application :
KET/2009/0549
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
14.35 |
Site Address: |
Agricultural land at Towns Close Farm, between Pipewell and Rushton and close to the A6003 Road to Corby
|
|
NN14 1QT
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
484680 / 484680
|
Development Status: |
Operational
|
Application Submitted: |
8/29/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2015
|
|
|
Generator Live |
1/18/2016
|
This Record Last Updated: |
8/25/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
New Albion Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00351RQEN
|
Capacity: |
14170
|
Status: |
Live
|
Accreditation Date: |
8/29/2009
|
|
|
Commission Date: |
12/8/2015
|
|
|
Applicant: |
John Laing Investments
|
Applicant Address: |
1 Kingsway
London
WC2B 6AN
England
|
Address: |
New Albion windfarm
Town Close Farm (land at)
Rushton
Kettering
NN14 1QP
England
|
Site Name: |
New Albion Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02904NWEN
|
Capacity: |
14170
|
Status: |
Live
|
Accreditation Date: |
8/29/2009
|
|
|
Commission Date: |
12/8/2015
|
|
|
Applicant: |
John Laing Investments
|
Applicant Address: |
1 Kingsway
London
WC2B 6AN
England
|
Address: |
New Albion windfarm
Town Close Farm (land at)
Rushton
Kettering
NN14 1QP
England
|
|
Assumptions: Capacity: 14170kW 14.17 MW, Thus over the month Capacity * 720 hours per month = 10202.4 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2141 | 15.11% | Issued | 01/03/2018 | | | 2810 | 19.83% | Issued | 01/02/2018 | | | 2459 | 17.35% | Issued | 01/01/2018 | | | 3863 | 27.26% | Issued | 01/12/2017 | | | 3343 | 23.59% | Issued | 01/11/2017 | | | 2450 | 17.29% | Issued | 01/10/2017 | | | 3106 | 21.92% | Retired | 01/09/2017 | | | 1627 | 11.48% | Retired | 01/08/2017 | | | 1401 | 9.89% | Issued | 01/07/2017 | | | 1460 | 10.30% | Issued | 01/06/2017 | | | 2149 | 15.17% | Retired | 01/05/2017 | | | 1604 | 11.32% | Issued | 01/04/2017 | | | 1513 | 10.68% | Issued | 01/04/2017 | | | 6 | 0.04% | Issued | 01/03/2017 | | | 2829 | 19.96% | Issued | 01/02/2017 | | | 2618 | 18.48% | Issued | 01/01/2017 | | | 1819 | 12.84% | Issued | Dec-16 | 0 | 1810 | 2011 | 14.19% | Pending Tr | Nov-16 | 0 | 1855 | 2061 | 14.54% | Pending Tr | Oct-16 | 0 | 1185 | 1323 | 9.34% | Pending Tr | Sep-16 | 0 | 1395 | 1550 | 10.94% | Pending Tr | Aug-16 | 0 | 1653 | 1837 | 12.96% | Pending Tr | Jul-16 | 0 | 1458 | 1620 | 11.43% | Pending Tr | Jul-16 | 0 | 1458 | 1620 | 11.43% | Pending Tr | Jun-16 | 0 | 899 | 1011 | 7.13% | Pending Tr | May-16 | 0 | 1601 | 1778 | 12.55% | Pending Tr | Apr-16 | 0 | 1578 | 1753 | 12.37% | Pending Tr | Mar-16 | 0 | 2107 | 2341 | 16.52% | Pending Tr | Feb-16 | 0 | 2880 | 3200 | 22.58% | Pending Tr | Dec-15 | 0 | 2842 | 3158 | 22.29% | Pending Tr |
|
Capacity: 28.7 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|