Heysham Moss Wind Farm (Wind , Active) Location in the UK : England, LA3 3EF Type of installation: Wind on/offshore: on Turbines :1 Capacity : 1.5 MW Approx Date of 1st power generation: February 2015
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Blue Energy Operational
Model: |
Enercon E70
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
71
|
Stop Speed: |
31
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
205
|
Web Page: |
http://www.enercon.de/en-en/61.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Oxcliffe Road, Heaton With Oxcliffe, Morecambe, Lancashire
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Fanny House Farm/Heysham Moss 1.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Lancaster City Council
|
Site ID and Reference: |
3792 / AA216
District:
|
Applicant: |
Blue Energy
Application :
11/00073/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
110 |
Calculated capacity: |
1.5 |
Site Address: |
Oxcliffe Road, Heaton With Oxcliffe, Morecambe, Lancashire
|
|
LA3 3EF
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
342996 / 342996
|
Development Status: |
Operational
|
Application Submitted: |
1/27/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2014
|
|
|
Generator Live |
2/1/2015
|
This Record Last Updated: |
2/16/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Heysham Moss
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02700NWEN
|
Capacity: |
1500
|
Status: |
Live
|
Accreditation Date: |
1/27/2011
|
|
|
Commission Date: |
3/24/2015
|
|
|
Applicant: |
Brook Wind Two (Heysham Moss) Limited
|
Applicant Address: |
26 Brook Street
London
W1K 5DQ
England
|
Address: |
Fanny House Farm
Oxcliffe Road
Heaton with Oxcliffe
Morecambe
LA3 3EF
England
|
|
Assumptions: Capacity: 1500kW 1.5 MW, Thus over the month Capacity * 720 hours per month = 1080 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 377 | 25.13% | Redeemed | | | | 443 | 29.53% | Redeemed | 01/01/2017 | | | 336 | 22.40% | Redeemed | 01/12/2016 - 31/12/2016 | 0 | 0 | 437 | 29.13% | Issued | 01/11/2016 - 30/11/2016 | 0 | 0 | 265 | 17.67% | Issued | 01/10/2016 - 31/10/2016 | 0 | 0 | 223 | 14.87% | Issued | 01/09/2016 - 30/09/2016 | 0 | 0 | 366 | 24.40% | Issued | 01/08/2016 - 31/08/2016 | 0 | 0 | 371 | 24.73% | Issued | 01/07/2016 - 31/07/2016 | 0 | 0 | 303 | 20.20% | Issued | 01/06/2016 - 30/06/2016 | 0 | 0 | 138 | 9.20% | Issued | May-16 | 0 | 0 | 285 | 19.00% | Issued | Apr-16 | 0 | 0 | 305 | 20.33% | Issued | Mar-16 | 0 | 0 | 273 | 18.20% | Redeemed | Feb-16 | 0 | 0 | 468 | 31.20% | Redeemed | Jan-16 | 0 | 0 | 533 | 35.53% | Redeemed | Dec-15 | 0 | 0 | 692 | 46.13% | Redeemed | Nov-15 | 0 | 0 | 595 | 39.67% | Redeemed | Oct-15 | 0 | 0 | 236 | 15.73% | Redeemed | Sep-15 | 0 | 0 | 195 | 13.00% | Redeemed | Aug-15 | 0 | 0 | 322 | 21.47% | Redeemed | Jul-15 | 359 | 0 | 358 | 23.87% | Redeemed | Jun-15 | 274 | 0 | 274 | 18.27% | Redeemed | May-15 | 507 | 0 | 1 | 0.07% | Redeemed | Apr-15 | 38 | 0 | 38 | 2.53% | Redeemed | Mar-15 | 30 | 0 | 30 | 2.00% | Expired |
|
Capacity: 3 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
BT Wind Turbine at Fanny House Farm Heysham BT’s planning application for a wind turbine at Fanny House farm Heysham as part of their Wind for Change programme has been APPROVED. They plan to build a single 110m 2MW turbine behind the Windermere Park estate, on HEYSHAM MOSS.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|