Crossness Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Crossness Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, SE2 9AR    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.5 MW
Approx Date of 1st power generation: February 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Thames Water Utilities Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 68   Avg for all turbines:68 Avg. Elevation: 5
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Belvedere Road, London

 Associated Companies.

Relationship Company (For: Crossness )
DeveloperThames Water Utilities
OperatorThames Water Utilities
OwnerThames Water Utilities

 DECC Data on this Project: Crossness :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Crossness Sewage Works Turbine     2.5 MW
Energy Type: Wind Onshore
County: London     Country: England     LPA: London Borough of Bexley
Site ID and Reference: 3862 / B0098     District:
Applicant: Thames Water Utilities     Application : 08/03936/FULMIN (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 2.5
Site Address: Belvedere Road, London
  SE2 9AR
County: London Region: London
OS Coordinates: 548777 / 548777
Development Status: Operational
Application Submitted: 11/24/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/30/2013    
Generator Live 2/16/2014 This Record Last Updated: 1/5/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Crossness: Wind :

Site Name: Crossness STW wind turbine
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00310RQEN
Capacity: 2240 Status: Live
Accreditation Date: 11/24/2010    
Commission Date: 2/26/2014    
Applicant: Thames Water Utilities Ltd
Applicant Address: Clearwater Court Vastern Road Reading RG1 8DB England
Address: Crossness Sewage Works Belvedere Road Abbey Wood London SE2 9AQ England

Site Name: Crossness STW wind turbine
Generator Type: Wind
Scheme : REGO Generator ID: G02476NWEN
Capacity: 2240 Status: Live
Accreditation Date: 11/24/2010    
Commission Date: 2/26/2014    
Applicant: Thames Water Utilities Ltd
Applicant Address: Clearwater Court Vastern Road Reading RG1 8DB England
Address: Crossness Sewage Works Belvedere Road Abbey Wood London SE2 9AQ England
 
Assumptions: Capacity: 2240kW 2.24 MW,
Thus over the month Capacity * 720 hours per month = 1612.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 179 7.99% Issued
01/02/2018 403 17.99% Issued
01/01/2018 486 21.70% Issued
01/12/2017 508 22.68% Issued
01/11/2017 354 15.80% Issued
01/10/2017 427 19.06% Issued
01/09/2017 256 11.43% Issued
01/08/2017 187 8.35% Issued
01/07/2017 270 12.05% Issued
01/06/2017 356 15.89% Issued
01/05/2017 235 10.49% Issued
01/04/2017 200 8.93% Issued
01/03/2017 464 20.71% Issued
01/02/2017 406 18.13% Issued
01/01/2017 230 10.27% Issued
Dec-16 0211 234 10.45% Issued
Nov-16 0292 325 14.51% Issued
Oct-16 0218 242 10.80% Issued
Sep-16 0196 218 9.73% Issued
Aug-16 0252 280 12.50% Issued
Jul-16 0219 244 10.89% Issued
Jun-16 0135 151 6.74% Issued
Jun-16 0135 151 6.74% Issued
May-16 0202 225 10.04% Issued
Apr-16 0256 285 12.72% Issued
Mar-16 0185 209 9.33% Issued
Feb-16 0159 181 8.08% Issued
Jan-16 05 14 0.63% Issued
Dec-15 0573 637 28.44% Issued
Nov-15 0559 621 27.72% Issued
Oct-15 0166 184 8.21% Issued
Sep-15 0190 211 9.42% Issued
Aug-15 0196 218 9.73% Issued
Jul-15 282254 282 12.59% Expired
Jun-15 298269 298 13.30% Expired
May-15 428385 427 19.06% Expired
Apr-15 271244 271 12.10% Expired
Mar-15 448403 448 20.00% Expired
Feb-15 335302 335 14.96% Expired
Jan-15 592533 592 26.43% Expired
Dec-14 540487 541 24.15% Expired
Nov-14 262236 262 11.70% Expired
Oct-14 326293 325 14.51% Expired
Sep-14 8879 88 3.93% Expired
Aug-14 294265 294 13.13% Expired
Jul-14 181164 182 8.13% Expired
Jun-14 154138 154 6.88% Expired
May-14 284256 284 12.68% Expired
Apr-14 230207 230 10.27% Expired
Mar-14 267240 267 11.92% Expired
Feb-14 2822 29 1.29% Expired

 Calculations


Capacity: 5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 350638

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School