Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWarness
Warness (Wave , Active) Location in the UK : Scotland, KW17 2AA Type of installation: Wave on/offshore: off Turbines :0 Capacity : 0 MW Approx Date of 1st power generation:
/YES
GRID-CONNECTED TIDAL TEST SITE: grid-connected tidal test site at the Fall of Warness is situated just west of the island of Eday - lying in a narrow channel between the Westray Firth and Stronsay Firth. EMEC offers eight tidal test berths at depths ranging from 12m to 50m in an area 2km across and approximately 4km in length. EMEC Eday Tidal Test Facility Caldale Eday Caldale KW17 2AA Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
The Fall of Warness Tidal Scheme, (FoW - EMEC) 2 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2411 / EN00450
District:
|
Applicant: |
Tocardo (EMEC)
Application :
|
(Go to search to find Application) |
Site Address: |
Fall of Warness, Eday, Orkney
|
|
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
354000 / 354000
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
6/1/2016
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/15/2023
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hammerfest (FoW - EMEC) 1 MW
|
Energy Type: |
Tidal Stream |
County: |
Offshore Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2420 / B0404
District:
|
Applicant: |
Hamerfest Strom/SPR
Application :
|
(Go to search to find Application) |
Site Address: |
EMEC
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
314195 / 314195
|
Development Status: |
Decommissioned
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/2012
|
This Record Last Updated: |
4/24/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
SR-2000 (FoW - EMEC) 2 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2402 / B0677
District:
|
Applicant: |
Scotrenewables
Application :
15/031/S36CON
|
(Go to search to find Application) |
Site Address: |
Fall of Warness, Eday, Orkney
|
|
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
354000 / 354000
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/7/2016
|
|
|
Generator Live |
4/14/2017
|
This Record Last Updated: |
11/8/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
3/9/2015 |
Appeal Granted: |
|
Site Name: |
Eday Berth 1
|
Generator Type: |
Enhanced Tidal Stream
|
Scheme : |
RO
|
Generator ID: |
R00001SOSC
|
Capacity: |
1000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
11/6/2012
|
|
|
Applicant: |
ANDRITZ HYDRO Hammerfest (UK) Limited
|
Applicant Address: |
Hillington Innovation Centre
1 Ainslie Road
GLASGOW
G52 4RU
Scotland
|
Address: |
EMEC Eday Tidal Test Facility
Caldale
Eday
Caldale
KW17 2AA
Scotland
|
Site Name: |
Eday Berth 1
|
Generator Type: |
Ocean Energy (REGO Code = OE)
|
Scheme : |
REGO
|
Generator ID: |
G00008OESC
|
Capacity: |
1000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
11/6/2012
|
|
|
Applicant: |
ANDRITZ HYDRO Hammerfest (UK) Limited
|
Applicant Address: |
Hillington Innovation Centre
1 Ainslie Road
GLASGOW
G52 4RU
Scotland
|
Address: |
EMEC Eday Tidal Test Facility
Caldale
Eday
Caldale
KW17 2AA
Scotland
|
|
Assumptions: Capacity: 1000kW 1 MW, Thus over the month Capacity * 720 hours per month = 720 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Apr-14 | 7 | 0 | 7 | 0.70% | Redeemed | Mar-14 | 199 | 952 | 199 | 19.90% | Redeemed | Feb-14 | 119 | 550 | 118 | 11.80% | Redeemed | Jan-14 | 162 | 755 | 161 | 16.10% | Redeemed | Dec-13 | 143 | 663 | 143 | 14.30% | Redeemed | Nov-13 | 147 | 684 | 1 | 0.10% | Redeemed | Oct-13 | 140 | 644 | 140 | 14.00% | Redeemed | Sep-13 | 94 | 405 | 94 | 9.40% | Redeemed | Dec-12 | 62 | 162 | 61 | 6.10% | Retired | Nov-12 | 84 | 216 | 84 | 8.40% | Retired | Oct-12 | 4 | 0 | 4 | 0.40% | Retired | Sep-12 | 0 | 0 | 1 | 0.10% | Retired |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|