Lynmouth (Wave , Agreed/Planning) Location in the UK : England, Lynmouth Type of installation: Wave on/offshore: on Turbines :0 Capacity : 1.2 MW Approx Date of 1st power generation:
/YES
Lynmouth
Relationship |
Company (For:
Lynmouth
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Lynmouth Tidal Demo 1.2 MW
|
Energy Type: |
Tidal Stream |
County: |
Offshore Country: England LPA: Crown Estate
|
Site ID and Reference: |
2407 / B0389
District:
|
Applicant: |
Pulse Tidal
Application :
|
(Go to search to find Application) |
Site Address: |
Lynmouth, Devon
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
271966 / 271966
|
Development Status: |
Abandoned
|
Application Submitted: |
10/1/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/29/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
North Devon Demonstration Zone
Seaflow Project LYNMOUTH, N Devon This project involved the development of an "underwater windmill" which can generate a maximum of 300kW in a 2.7m/s current (5.5 knots) using an 11m diameter rotor,
Worlds First Open Sea Tidal Turbine The first tidal turbine generator in open-sea in the world was installed 1 mile off the coast of LYNMOUTH, Devon, in spring 2003 by Bristol-based Marine Current Turbines (MCT)
The LYNMOUTH Marine Turbine The turbine started generating electricity on 30th May 2002. At a depth of 65-ft (20 m), it presents no danger to shipping. The 52-ft (16 m) blades revolve at between 12 and 15 rpm ensuring there is no interference with marine life.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh