Loading
Page views this IP this session = 1 of 10 unsubscribed pagesGreengairs Energy from Waste Plant
Greengairs (Waste , Active, Waste - Landfill Gas) Location in the UK : Scotland, ML6 7TY Type of installation: Waste on/offshore: on Turbines :0 Capacity : 2.2 MW Approx Date of 1st power generation: December 2002
/YES
Greengairs Landfill Meikle Drumgray Road Airdrie ML6 7TY Scotland
Relationship |
Company (For:
Greengairs
) |
Operator | infinis |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Greengairs Landfill Scheme Phase V 2.2 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
760 / S0012L3
District:
|
Applicant: |
Waste Recycling Group
Application :
C/00/01446/FUL
|
(Go to search to find Application) |
Site Address: |
North Lanarkshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
12/12/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/2002
|
This Record Last Updated: |
11/30/2005
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Greengairs Landfill Scheme Phase VI 2.2 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
687 / S0013L3
District:
|
Applicant: |
Waste Recycling Group
Application :
|
(Go to search to find Application) |
Site Address: |
North Lanarkshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
12/12/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/2002
|
This Record Last Updated: |
11/30/2005
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Greengairs Landfill Scheme Phase III 2 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
692 / S0024L2
District:
|
Applicant: |
Waste Recycling Group
Application :
|
(Go to search to find Application) |
Site Address: |
Airdrie
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
6/24/1997
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
8/13/1999
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Greengairs Landfill Scheme Phase IV 2 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
693 / S0025L2
District:
|
Applicant: |
Waste Recycling Group
Application :
|
(Go to search to find Application) |
Site Address: |
Airdrie
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
6/24/1997
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
8/13/1999
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Greengairs Landfill Scheme Phase I 1.9 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
694 / S0028L1
District:
|
Applicant: |
Waste Recycling Group
Application :
|
(Go to search to find Application) |
Site Address: |
Greengairs Landfill Site
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
2/25/1994
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
5/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Greengairs Landfill Scheme Phase II 1.9 MW
|
Energy Type: |
Landfill Gas |
County: |
Strathclyde Country: Scotland LPA: North Lanarkshire Council
|
Site ID and Reference: |
695 / S0029L1
District:
|
Applicant: |
Waste Recycling Group
Application :
|
(Go to search to find Application) |
Site Address: |
Greengairs Landfill Site
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
278500 / 278500
|
Development Status: |
Operational
|
Application Submitted: |
2/25/1994
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
GREENGAIRS PHASE 5
|
Generator Type: |
Landfill gas (ROS code = SJ)
|
Scheme : |
RO
|
Generator ID: |
R00035SJSC
|
Capacity: |
2300
|
Status: |
Live
|
Accreditation Date: |
2/25/1994
|
|
|
Commission Date: |
1/1/2004
|
|
|
Applicant: |
Infinis Limited
|
Applicant Address: |
First Floor
500 Pavilion Drive
Northampton Business Park Northampton
NN4 7YJ
|
Address: |
SRO Greengairs Phase 5 (20/4/06) - A
400 Greengairs Road
Greengairs
Airdrie
ML6 7TD
Scotland
|
Site Name: |
GREENGAIRS PHASE 5
|
Generator Type: |
Landfill Gas (REGO code = LG)
|
Scheme : |
REGO
|
Generator ID: |
G00773LGSC
|
Capacity: |
2300
|
Status: |
Live
|
Accreditation Date: |
2/25/1994
|
|
|
Commission Date: |
1/1/2004
|
|
|
Applicant: |
Infinis Limited
|
Applicant Address: |
First Floor
500 Pavilion Drive
Northampton Business Park Northampton
NN4 7YJ
|
Address: |
SRO Greengairs Phase 5 (20/4/06) - A
400 Greengairs Road
Greengairs
Airdrie
ML6 7TD
Scotland
|
|
Assumptions: Capacity: 2300kW 2.3 MW, Thus over the month Capacity * 720 hours per month = 1656 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Jun-12 | 4 | 4 | 4 | 0.17% | Redeemed | May-12 | 35 | 35 | 35 | 1.52% | Redeemed | Apr-12 | 8 | 7 | 8 | 0.35% | Redeemed | Mar-12 | 21 | 19 | 21 | 0.91% | Redeemed | Feb-12 | 9 | 6 | 9 | 0.39% | Redeemed | Jan-12 | 42 | 40 | 42 | 1.83% | Redeemed | Dec-11 | 18 | 16 | 18 | 0.78% | Redeemed | Nov-11 | 8 | 6 | 7 | 0.30% | Redeemed | Oct-11 | 329 | 330 | 330 | 14.35% | Redeemed | Sep-11 | 291 | 291 | 291 | 12.65% | Redeemed | Aug-11 | 109 | 109 | 109 | 4.74% | Redeemed | Jul-11 | 9 | 8 | 8 | 0.35% | Redeemed | Jun-11 | 19 | 19 | 20 | 0.87% | Redeemed | May-11 | 49 | 47 | 49 | 2.13% | Redeemed | Apr-11 | 131 | 128 | 130 | 5.65% | Redeemed | Mar-11 | 72 | 65 | 72 | 3.13% | Redeemed | Feb-11 | 48 | 38 | 48 | 2.09% | Redeemed | Jan-11 | 22 | 14 | 22 | 0.96% | Redeemed | Dec-10 | 13 | 7 | 12 | 0.52% | Redeemed | Nov-10 | 25 | 24 | 25 | 1.09% | Redeemed | Oct-10 | 69 | 69 | 69 | 3.00% | Redeemed |
|
Project Info |
Caldercruix windfarm plans are put on hold Scottish Natural Heritage added that “the combination of Greendykeside, GREENGAIRS and Bracco wind farms would in [our] view create a scattering of moderate and small-scale developments with no cohesive pattern” leading to a “visually confusing scene
Caldercruix windfarm plans are put on hold Scottish Natural Heritage added that “the combination of Greendykeside, GREENGAIRS and Bracco wind farms would in [our] view create a scattering of moderate and small-scale developments with no cohesive pattern” leading to a “visually confusing scene
|
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|