Sorry I found no matches, Please try again. 176
vid = 4830pws_id = 324060pws_id = 324060 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.222.161.245 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Capel Energy from Waste Plant

Capel (Waste , Active, Waste - Landfill Gas)

 General Information.

Location in the UK : England, RH 5 5JL    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 1.03 MW
Approx Date of 1st power generation: February 2006

/YES

 Comment

 Address

Capel Landfill Site Clockhouse Brickworks Horsham RH 5 5JL England

 Associated Companies.

Relationship Company (For: Capel )
OperatorSita

 DECC Data on this Project: Capel :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Capel Landfill     1 MW
Energy Type: Landfill Gas
County: Surrey     Country: England     LPA: Mole Valley District Council
Site ID and Reference: 784 / N00068L     District:
Applicant: Hanson Brick Ltd     Application : M003/0878 (Go to search to find Application)
Site Address: Capel Landfill Site Capel land adjacent to withdrawn MSW application site
 
County: Surrey Region: South East
OS Coordinates: 517283 / 517283
Development Status: Operational
Application Submitted: 6/2/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/1/2006 This Record Last Updated: 4/23/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Capel: Waste :

Site Name: Capel - A,C
Generator Type: Landfill gas (RO code = RJ)
Scheme : RO Generator ID: R00537RJEN
Capacity: 1030 Status: Live
Accreditation Date: 6/2/2003    
Commission Date: 2/1/2006    
Applicant: Sita Holding UK Ltd
Applicant Address: Packington House Packington Lane Little Packington Meriden, Coventry, Warwickshire CV7 7HN
Address: Capel - A,C (10/02/06) Capel Landfill SiteClockhouse BrickworksHorsha RH 5 5JL England

Site Name: Capel - A,C
Generator Type: Landfill Gas (REGO code = LG)
Scheme : REGO Generator ID: G00827LGEN
Capacity: 1030 Status: Live
Accreditation Date: 6/2/2003    
Commission Date: 2/1/2006    
Applicant: Sita Holding UK Ltd
Applicant Address: Packington House Packington Lane Little Packington Meriden, Coventry, Warwickshire CV7 7HN
Address: Capel - A,C (10/02/06) Capel Landfill SiteClockhouse BrickworksHorsha RH 5 5JL England
 
Assumptions: Capacity: 1030kW 1.03 MW,
Thus over the month Capacity * 720 hours per month = 741.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
Jan-13 9898 113 10.97% Redeemed
Dec-12 178178 192 18.64% Redeemed
Nov-12 139139 154 14.95% Redeemed
Oct-12 208207 222 21.55% Redeemed
Sep-12 183183 198 19.22% Redeemed
Aug-12 202202 218 21.17% Redeemed
Jul-12 191191 203 19.71% Redeemed
Jun-12 192193 207 20.10% Redeemed
May-12 192192 206 20.00% Redeemed
Apr-12 196195 212 20.58% Redeemed
Mar-12 225225 233 22.62% Redeemed
Feb-12 226226 241 23.40% Redeemed
Jan-12 244244 257 24.95% Redeemed
Dec-11 252252 272 26.41% Redeemed
Nov-11 263263 281 27.28% Redeemed
Oct-11 287287 303 29.42% Redeemed
Sep-11 258258 273 26.50% Redeemed
Aug-11 268269 285 27.67% Redeemed
Jul-11 298298 316 30.68% Redeemed
Jun-11 120120 128 12.43% Redeemed
May-11 221221 244 23.69% Redeemed
Apr-11 217216 232 22.52% Redeemed
Mar-11 244244 264 25.63% Redeemed
Feb-11 238238 254 24.66% Redeemed
Jan-11 264264 276 26.80% Redeemed
Dec-10 268269 290 28.16% Redeemed
Nov-10 275275 304 29.51% Redeemed

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School