Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWalpole AD Energy from Waste Plant
Walpole AD (Waste , Active, Waste Anaerobic Digestion) Location in the UK : England, TA6 4TF Type of installation: Waste on/offshore: on Turbines :0 Capacity : 0 MW Approx Date of 1st power generation: December 2015
/YES
Walpole AD Walpole Landfill Pawlett Bridgwater TA6 4TF England
Relationship |
Company (For:
Walpole AD
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Walpole Landfill AD (Waste AD) 1.6 MW
|
Energy Type: |
Anaerobic Digestion |
County: |
Somerset Country: England LPA: Sedgemoor District Council
|
Site ID and Reference: |
317 / B0321
District:
|
Applicant: |
Viridor
Application :
41/10/00007
|
(Go to search to find Application) |
Site Address: |
Pawlett, Bridgwater,
|
|
|
County: |
Somerset Region: South West
|
OS Coordinates: |
331400 / 331400
|
Development Status: |
Operational
|
Application Submitted: |
4/28/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
3/1/2012
|
|
|
Generator Live |
2/2/2014
|
This Record Last Updated: |
7/23/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Walpole AD
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G07103PVEN
|
Capacity: |
154
|
Status: |
Live
|
Accreditation Date: |
4/28/2010
|
|
|
Commission Date: |
12/18/2015
|
|
|
Applicant: |
Viridor Waste Disposal Ltd
|
Applicant Address: |
Viridor House
Youngman Place
Priory Bridge Road
Taunton
TA1 1AP
England
|
Address: |
Walpole AD
Walpole Landfill
Pawlett
Bridgwater
TA6 4TF
England
|
|
Assumptions: Capacity: 154kW 0.154 MW, Thus over the month Capacity * 720 hours per month = 110.88 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|