Loading
Page views this IP this session = 1 of 10 unsubscribed pagesLlys Dymper Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Llys Dymper Wind Farm (Wind , Proposed) Location in the UK : Wales, Type of installation: Wind on/offshore: on Turbines :17 Capacity : 49.5 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Erection of 17 no. Wind Turbines (126 m Tip Height), Control Building / Substation with Secure Compound, Underground Electrical Cables Connecting Turbines to Substation, (resubmission) Erection of 10 no. Wind Turbines (5 no. at Maximum 100 m Tip Height and 5 no. at Maximum 110 m Tip Height), Provision of Crane Hardstandings, Control Building, Substation, Underground Electrical Cables, Refused 15-05-2014
Model: |
|
Start Speed: |
|
Capacity: |
|
Optimal Speed: |
|
Rotor Diameter: |
|
Stop Speed: |
|
Hub Height |
Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
on the Hiraethog Moor, to the south of Gwytherin and the west of Llansannan
Relationship |
Company (For:
Llys Dymper
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Llys Dymper Wind Farm 23 MW
|
Energy Type: |
Wind Onshore |
County: |
Clwyd Country: Wales LPA: Conwy County Borough Council
|
Site ID and Reference: |
3848 / AA706
District:
|
Applicant: |
Windpower Wales
Application :
0/38695
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
23 |
Site Address: |
Land at Llys Dymper, Gwytherin, Llanrwst, Conwy
|
|
|
County: |
Clwyd Region: Wales
|
OS Coordinates: |
288420 / 288420
|
Development Status: |
Appeal Withdrawn
|
Application Submitted: |
2/16/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
4/9/2014
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
12/9/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
1/23/2015 |
Called In: |
|
Appeal Withdrawn: |
3/9/2015 |
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
4/9/2014 |
Site Name: |
Llys Dymper 49.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Clwyd Country: Wales LPA: Conwy County Borough Council
|
Site ID and Reference: |
3729 / A0415
District:
|
Applicant: |
Windpower Wales
Application :
0/37722
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
17 |
Turbine Capacity: |
2.9399999999999999 |
Height of Turbines: |
|
Calculated capacity: |
49.98 |
Site Address: |
on the Hiraethog Moor, to the south of Gwytherin and the west of Llansannan
|
|
|
County: |
Clwyd Region: Wales
|
OS Coordinates: |
288420 / 288420
|
Development Status: |
Revised
|
Application Submitted: |
3/7/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
4/2/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
9/29/2011 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
LLYS DYMPER Turbines REJECTED! Windpower Wales’ plans for 10 turbines of 110m (360ft) at its LLYS DYMPER wind farm in the Conwy Valley were given the thumbs down today by members of Conwy Council’s Planning Committee.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|