Sorry I found no matches, Please try again. 176
vid = 4885pws_id = 350758pws_id = 350758
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.14.73.0 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Clearwell Farm Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Clearwell Farm Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, CF3 6XT    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.33 MW
Approx Date of 1st power generation: September 2013

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

ERECTION OF 0.5MW WIND TURBINE AFFECTING PUBLIC RIGHT OF WAY 400/2 AND 400/23. AMENDMENT TO ORIGINAL PROPOSAL RESULTING IN A REDUCTION OF HEIGHT FROM 84 METRES HEIGHT TO 67 METRES HEIGHT.
http://planning.newport.gov.uk/ 14/0460

 Turbine Make and Specs

Model: Enercon E33 Start Speed: 5
Capacity: 0.33 Optimal Speed: 15
Rotor Diameter: 33 Stop Speed: 25
Hub Height 50   Avg for all turbines:50 Avg. Elevation: 0
Web Page:
Comment:

 Address

Clearwell Farm, Michaelston-Y-Fedw, Cardiff. CF3 6XT

 Associated Companies.

Relationship Company (For: Clearwell Farm )
AgentAspire Planning
ContractorRaymond Brown Renewables

 DECC Data on this Project: Clearwell Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Clearwell Farm: Wind :

Site Name: Enercon E33 - Full Accreditation
Generator Type: Wind
Scheme : REGO Generator ID: G01430NWWA
Capacity: 330 Status: Live
Accreditation Date:    
Commission Date: 9/19/2013    
Applicant: David Phillips
Applicant Address: Clearwell Farm Michaelston Y Fedw CARDIFF CF3 6XT Wales
Address: Clearwell Farm Clearwell Farm Michaelston-y-fedw Cardiff CF3 6XT Wales
 
Assumptions: Capacity: 330kW 0.33 MW,
Thus over the month Capacity * 720 hours per month = 237.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
39 11.82% Issued
24 7.27% Issued
76 23.03% Redeemed
63 19.09% Redeemed
01/01/2017 40 12.12% Redeemed
01/12/2016 - 31/12/2016 00 31 9.39% Issued
01/11/2016 - 30/11/2016 00 54 16.36% Issued
01/10/2016 - 31/10/2016 00 34 10.30% Issued
01/09/2016 - 30/09/2016 00 41 12.42% Issued
Aug-16 00 45 13.64% Issued
Jul-16 00 38 11.52% Issued
Jun-16 00 27 8.18% Issued
May-16 00 38 11.52% Issued
Apr-16 00 50 15.15% Issued
Feb-16 00 77 23.33% Redeemed
Jan-16 00 73 22.12% Redeemed
Nov-15 00 91 27.58% Redeemed
Oct-15 00 32 9.70% Redeemed
Sep-15 00 31 9.39% Redeemed
Aug-15 00 35 10.61% Redeemed
Jul-15 340 34 10.30% Retired
Jun-15 470 46 13.94% Redeemed
May-15 590 59 17.88% Redeemed
Apr-15 450 45 13.64% Redeemed
Mar-15 660 66 20.00% Redeemed
Feb-15 370 37 11.21% Redeemed
Jan-15 700 70 21.21% Redeemed
Dec-14 780 78 23.64% Redeemed
Nov-14 440 44 13.33% Retired
Oct-14 590 59 17.88% Redeemed
Sep-14 230 23 6.97% Redeemed
Aug-14 420 43 13.03% Redeemed
Jul-14 260 26 7.88% Redeemed
Jun-14 160 16 4.85% Redeemed
May-14 470 47 14.24% Redeemed
Apr-14 360 36 10.91% Redeemed
Mar-14 460 1 0.30% Expired
Feb-14 960 96 29.09% Redeemed
Jan-14 680 1 0.30% Redeemed
Dec-13 620 1 0.30% Redeemed
Nov-13 410 40 12.12% Redeemed
Oct-13 620 62 18.79% Redeemed
Sep-13 30 4 1.21% Redeemed
12 3.64% Issued
41 12.42% Issued
34 10.30% Issued
52 15.76% Issued
60 18.18% Issued
68 20.61% Issued
42 12.73% Issued
39 11.82% Issued

 Calculations


Capacity: 0.66
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 0.66 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350758

Project Info
CLEARWELL FARM Wind Turbine Construction, ENERCON 01.08.2013

Solar farms in Newport get the go-ahead
9,040 solar energy panels on a 4.5 hectare site at CLEARWELL FARM, Michaelstone-y-Fedw was passed.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School