Sorry I found no matches, Please try again. 176
vid = 4895pws_id = 350007pws_id = 350007
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.154.251 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Cruglwyn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Cruglwyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, NP12 0GD    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.5 MW
Approx Date of 1st power generation: February 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW 61 Start Speed: 2.5
Capacity: 0.5 Optimal Speed: 11.5
Rotor Diameter: 61 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 0
Web Page: http://www.ewtdirectwind.com/wind-turbines/service-performance.html#c925
Comment:

 Address

Cruglwyn Mynydd Manmoel Blackwood. NP12 0GD

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Cruglwyn )

 DECC Data on this Project: Cruglwyn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Cruglwyn: Wind :

Site Name: Cruglwyn
Generator Type: Wind
Scheme : REGO Generator ID: G01598NWWA
Capacity: 499 Status: Live
Accreditation Date:    
Commission Date: 2/22/2016    
Applicant: Cruglwyn Cyf
Applicant Address: Bennett Brooks And Co Ltd 19 Trinity Square LLANDUDNO LL30 2RD Wales
Address: Cruglwyn Manmoel Road Manmoel Blackwood NP12 0GD Wales
 
Assumptions: Capacity: 499kW 0.499 MW,
Thus over the month Capacity * 720 hours per month = 359.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
142 28.46% Issued
112 22.44% Issued
221 44.29% Redeemed
191 38.28% Redeemed
01/01/2017 182 36.47% Redeemed
01/12/2016 - 31/12/2016 00 150 30.06% Issued
01/11/2016 - 30/11/2016 00 187 37.47% Issued
01/10/2016 - 31/10/2016 00 162 32.46% Issued
01/09/2016 - 30/09/2016 00 123 24.65% Issued
01/08/2016 - 31/08/2016 00 153 30.66% Issued
01/07/2016 - 31/07/2016 00 137 27.45% Issued
01/06/2016 - 30/06/2016 00 101 20.24% Issued
01/05/2016 - 31/05/2016 00 145 29.06% Issued
01/04/2016 - 30/04/2016 00 148 29.66% Issued
153 30.66% Issued
204 40.88% Issued
186 37.27% Issued
135 27.05% Issued
246 49.30% Issued
169 33.87% Issued
133 26.65% Issued
216 43.29% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350007

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School