Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMaenhir Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Maenhir Wind Farm (Wind , Active) Location in the UK : Wales, SA34 0XE Type of installation: Wind on/offshore: on Turbines :1 Capacity : 0.1 MW Approx Date of 1st power generation: June 2016
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Not an exact location
Model: |
EWT DW 61
|
Start Speed: |
2.5
|
Capacity: |
0.5
|
Optimal Speed: |
11.5
|
Rotor Diameter: |
61
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
158
|
Web Page: |
http://www.ewtdirectwind.com/wind-turbines/service-performance.html#c925 |
Comment: |
|
Land at Maenhir Farm Maenhir Login Whitland SA34 0XE Wales
Relationship |
Company (For:
Maenhir
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Maenhir
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01617NWWA
|
Capacity: |
91.3
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
6/27/2016
|
|
|
Applicant: |
CWE Norwin Ltd
|
Applicant Address: |
Constantine Group plc
River Court
GODALMING
GU7 1EZ
England
|
Address: |
Land at Maenhir Farm
Maenhir
Login
Whitland
SA34 0XE
Wales
|
|
Assumptions: Capacity: 91.3kW 0.0913 MW, Thus over the month Capacity * 720 hours per month = 65.736 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 15 | 16.43% | Issued | | | | 17 | 18.62% | Issued | | | | 27 | 29.57% | Redeemed | | | | 26 | 28.48% | Redeemed | 01/01/2017 | | | 21 | 23.00% | Redeemed | 01/09/2016 - 30/09/2016 | 0 | 0 | 21 | 23.00% | Issued | 01/08/2016 - 31/08/2016 | 0 | 0 | 20 | 21.91% | Issued | 01/07/2016 - 31/07/2016 | 0 | 0 | 14 | 15.33% | Issued | | | | 16 | 17.52% | Issued | | | | 21 | 23.00% | Issued | | | | 33 | 36.14% | Issued | | | | 23 | 25.19% | Issued | | | | 28 | 30.67% | Issued | | | | 27 | 29.57% | Issued | | | | 14 | 15.33% | Issued | | | | 29 | 31.76% | Issued | | | | 23 | 25.19% | Issued | | | | 28 | 30.67% | Issued | | | | 23 | 25.19% | Issued |
|
Capacity: 0.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|