Loading
Page views this IP this session = 1 of 10 unsubscribed pagesGreenhouse Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Greenhouse Wind Farm (Wind , Active) Location in the UK : England, DH9 7XN Type of installation: Wind on/offshore: on Turbines :1 Capacity : 0.48 MW Approx Date of 1st power generation: September 2014
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Enercon E48
|
Start Speed: |
5
|
Capacity: |
0.8
|
Optimal Speed: |
15
|
Rotor Diameter: |
48
|
Stop Speed: |
25
|
Hub Height |
55 Avg for all turbines:55
|
Avg. Elevation: |
146
|
Web Page: |
http://www.enercon.de/en-en/492.htm |
Comment: |
Hub height: 50 m / 55 m / 60 m / 76 m
Stated as being ideal machine for any site
|
The Greenhouse Amos Road Greencroft Industrial Park Annfield Plain DH9 7XN England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Greenhouse Durham
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02594NWEN
|
Capacity: |
480
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
9/30/2014
|
|
|
Applicant: |
Greenhouse Wind Energy
|
Applicant Address: |
Lanchester Energy
Unit 9
Greencroft Industrial Estate
Annfield Plain
DH9 7XP
England
|
Address: |
The Greenhouse
Amos Road
Greencroft Industrial Park
Annfield Plain
DH9 7XN
England
|
|
Assumptions: Capacity: 480kW 0.48 MW, Thus over the month Capacity * 720 hours per month = 345.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 26 | 5.42% | Redeemed | | | | 99 | 20.63% | Redeemed | | | | 27 | 5.63% | Redeemed | | | | 125 | 26.04% | Redeemed | 01/01/2017 | | | 105 | 21.88% | Redeemed | 01/01/2017 | | | 22 | 4.58% | Redeemed | 01/10/2016 - 31/10/2016 | 0 | 0 | 68 | 14.17% | Issued | 01/09/2016 - 30/09/2016 | 0 | 0 | 97 | 20.21% | Issued | 01/08/2016 - 31/08/2016 | 0 | 0 | 106 | 22.08% | Issued | 01/07/2016 - 31/07/2016 | 0 | 0 | 96 | 20.00% | Issued | 01/06/2016 - 30/06/2016 | 0 | 0 | 37 | 7.71% | Issued | May-16 | 0 | 0 | 98 | 20.42% | Issued | Apr-16 | 0 | 0 | 99 | 20.63% | Issued | Mar-16 | 0 | 0 | 106 | 22.08% | Redeemed | Feb-16 | 0 | 0 | 158 | 32.92% | Redeemed | Jan-16 | 0 | 0 | 174 | 36.25% | Redeemed | Dec-15 | 0 | 0 | 216 | 45.00% | Redeemed | Nov-15 | 0 | 0 | 181 | 37.71% | Redeemed | Oct-15 | 0 | 0 | 7 | 1.46% | Redeemed | Sep-15 | 0 | 0 | 7 | 1.46% | Revoked | Aug-15 | 0 | 0 | 102 | 21.25% | Redeemed | Jul-15 | 78 | 0 | 78 | 16.25% | Redeemed | Jun-15 | 105 | 0 | 105 | 21.88% | Redeemed | May-15 | 141 | 0 | 141 | 29.38% | Redeemed | Apr-15 | 89 | 0 | 90 | 18.75% | Redeemed | Mar-15 | 168 | 0 | 168 | 35.00% | Redeemed | Feb-15 | 141 | 0 | 140 | 29.17% | Redeemed | Jan-15 | 207 | 0 | 208 | 43.33% | Redeemed | Dec-14 | 186 | 0 | 186 | 38.75% | Redeemed | Nov-14 | 92 | 0 | 92 | 19.17% | Redeemed | Oct-14 | 150 | 0 | 150 | 31.25% | Redeemed | | | | 124 | 25.83% | Issued | | | | 178 | 37.08% | Issued | | | | 86 | 17.92% | Issued | | | | 174 | 36.25% | Issued | | | | 96 | 20.00% | Issued | | | | 145 | 30.21% | Issued | | | | 156 | 32.50% | Issued | | | | 175 | 36.46% | Issued | | | | 116 | 24.17% | Issued | | | | 97 | 20.21% | Issued |
|
Capacity: 1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Scottish Power urges tougher climate change laws The energy giant said a UK target of net-zero GREENHOUSE gas emissions by 2050 should be made legally binding.
Wind farm opened in Antarctica The joint New Zealand-US project's three huge turbines will provide 11% of the power needed to run the two nations' science bases on Antarctica's Ross Sea coast, cutting GREENHOUSE gas output, lowering fossil fuel use and reducing the risk of fuel sp
Biomass energy 'could be harmful' Biomass power - such as burning wood for energy - could do more harm than good in the battle to reduce GREENHOUSE gases, the Environment Agency warns.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|