Barnard Castle Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Barnard Castle Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, DL12 8DT    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 0.4925 MW
Approx Date of 1st power generation: August 2004

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: aa 1mw or less Start Speed: 5
Capacity: 1 Optimal Speed: 15
Rotor Diameter: 20 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 168
Web Page:
Comment:

 Address

Barnard Castle GSK Wind Turbines GlaxoSmith Kline Harmire Road Barnard CastleCoBarnard Castle DL12 8DT England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Barnard Castle )

 DECC Data on this Project: Barnard Castle :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Barnard Castle: Wind :

Site Name: Barnard Castle GSK Wind Turbines - D
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00137RQEN
Capacity: 492.5 Status: Live
Accreditation Date:    
Commission Date: 5/5/2004    
Applicant: GlaxoSmith Kline
Applicant Address: Glaxo Smith Kline Harmire Road Barnard Castle Durham DL12 8DT England
Address: Barnard Castle GSK Wind Turbines GlaxoSmith KlineHarmire RoadBarnard CastleCo Barnard Castle DL12 8DT England

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/4/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350249

Project Info
Glaxo defends worst performing turbines
GlaxoSmithKline has defended the performance of wind turbines at its BARNARD CASTLE site as very successful after they were named among the worst in the country.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School