North Brackenridge Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

North Brackenridge Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, ML11 0HP    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: September 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 178
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

North Brackenridge Farm Lesmahagow ML11 0HP Scotland

 Associated Companies.

Relationship Company (For: North Brackenridge )
OperatorTemporis Capital LLP
FinanceTemporis Capital LLP

 DECC Data on this Project: North Brackenridge :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: North Brackenridge: Wind :

Site Name: North Brackenridge
Generator Type: Wind
Scheme : REGO Generator ID: G02089NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 7/9/2014    
Applicant: GVO WIND NO. 12 LIMITED
Applicant Address: c/o Temporis Capital LLP Berger House 36 - 38 Berkeley Square London W1J 5AE England
Address: North Brackenridge Farm Lesmahagow ML11 0HP Scotland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
123 25.63% Issued
181 37.71% Issued
184 38.33% Redeemed
195 40.63% Redeemed
01/01/2017 180 37.50% Redeemed
01/12/2016 - 31/12/2016 00 220 45.83% Issued
01/11/2016 - 30/11/2016 00 124 25.83% Issued
01/10/2016 - 31/10/2016 00 106 22.08% Issued
Sep-16 00 174 36.25% Issued
01/09/2016 - 30/09/2016 00 174 36.25% Issued
Aug-16 00 147 30.63% Issued
Jul-16 00 146 30.42% Issued
Jul-16 00 146 30.42% Issued
Jun-16 00 69 14.38% Issued
May-16 00 135 28.13% Issued
Apr-16 00 128 26.67% Issued
Mar-16 00 125 26.04% Redeemed
Feb-16 00 180 37.50% Redeemed
Jan-16 00 184 38.33% Redeemed
Dec-15 00 261 54.38% Redeemed
Nov-15 00 228 47.50% Redeemed
Oct-15 00 108 22.50% Redeemed
Sep-15 00 85 17.71% Redeemed
Aug-15 00 157 32.71% Redeemed
Jul-15 1160 116 24.17% Redeemed
Jun-15 1430 143 29.79% Redeemed
May-15 2220 193 40.21% Redeemed
Apr-15 1430 143 29.79% Redeemed
Mar-15 2040 204 42.50% Redeemed
Feb-15 1780 178 37.08% Redeemed
Jan-15 2650 265 55.21% Redeemed
Dec-14 2350 235 48.96% Redeemed
Nov-14 1240 124 25.83% Redeemed
Oct-14 2010 200 41.67% Redeemed
Sep-14 630 63 13.13% Redeemed
Aug-14 970 98 20.42% Redeemed
Jul-14 480 48 10.00% Redeemed
121 25.21% Issued
227 47.29% Issued
141 29.38% Issued
192 40.00% Issued
177 36.88% Issued
185 38.54% Issued
159 33.13% Issued
141 29.38% Issued
173 36.04% Issued
225 46.88% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352266

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School