Cluseburn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Cluseburn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, AB30 1LS    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: January 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 178
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Cluseburn Farm Inverbervie Montrose AB30 1LS Scotland

 Associated Companies.

Relationship Company (For: Cluseburn )
OperatorGVO WInd
FinanceTemporis Capital LLP

 DECC Data on this Project: Cluseburn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Cluseburn: Wind :

Site Name: Cluseburn Aug16
Generator Type: Wind
Scheme : REGO Generator ID: G02461NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 8/1/2016    
Applicant: GVO WIND NO. 44 LIMITED
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Cluseburn Farm Inverbervie Montrose AB30 1LS Scotland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
95 19.79% Issued
134 27.92% Issued
120 25.00% Issued
171 35.63% Issued
01/01/2017 142 29.58% Issued
93 19.38% Issued
155 32.29% Issued
158 32.92% Issued
175 36.46% Issued
85 17.71% Issued
146 30.42% Issued
117 24.38% Issued
165 34.38% Issued
176 36.67% Issued
134 27.92% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352013

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School