OGP1 Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

OGP1 Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, MK16 9JX    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: August 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 0
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Dovecote FarmTurvey Road Astwood Newport Pagnell MK16 9JX England

 Associated Companies.

Relationship Company (For: OGP1 )
FinanceTemporis Capital LLP

 DECC Data on this Project: OGP1 :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: OGP1: Wind :

Site Name: OGP1
Generator Type: Wind
Scheme : REGO Generator ID: G02802NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 8/28/2015    
Applicant: OGPW NO1 LIMITED
Applicant Address: 6 Charter Gate Clayfield Close NORTHAMPTON NN3 6QF England
Address: Dovecote Farm Turvey Road Astwood Newport Pagnell MK16 9JX England
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
110 22.92% Issued
92 19.17% Issued
187 38.96% Redeemed
164 34.17% Redeemed
01/01/2017 126 26.25% Redeemed
01/12/2016 - 31/12/2016 00 128 26.67% Issued
01/11/2016 - 30/11/2016 00 142 29.58% Issued
01/10/2016 - 31/10/2016 00 99 20.63% Issued
Oct-16 00 99 20.63% Pending Tr
Sep-16 00 120 25.00% Issued
01/09/2016 - 30/09/2016 00 120 25.00% Issued
Aug-16 00 121 25.21% Issued
Jul-16 00 108 22.50% Issued
Jul-16 00 108 22.50% Issued
Jun-16 00 67 13.96% Issued
May-16 00 117 24.38% Issued
Apr-16 00 110 22.92% Issued
Mar-16 00 150 31.25% Redeemed
Feb-16 00 185 38.54% Redeemed
Jan-16 00 207 43.13% Redeemed
Dec-15 00 276 57.50% Redeemed
Nov-15 00 206 42.92% Redeemed
Oct-15 00 90 18.75% Redeemed
Sep-15 00 81 16.88% Redeemed
Aug-15 00 4 0.83% Redeemed
161 33.54% Issued
128 26.67% Issued
157 32.71% Issued
103 21.46% Issued
200 41.67% Issued
156 32.50% Issued
215 44.79% Issued
101 21.04% Issued
206 42.92% Issued
107 22.29% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354230

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School