Page views this IP this session = 1 of 10 unsubscribed pagesOGP1 Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
OGP1 Wind Farm (Wind , Active) Location in the UK : England, MK16 9JX Type of installation: Wind on/offshore: on Turbines :1 Capacity : 0.48 MW Approx Date of 1st power generation: August 2015
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
EWT DW52/54
|
Start Speed: |
2.5
|
Capacity: |
0.9
|
Optimal Speed: |
13
|
Rotor Diameter: |
54
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
0
|
Web Page: |
http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html |
Comment: |
The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.
|
Dovecote FarmTurvey Road Astwood Newport Pagnell MK16 9JX England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
OGP1
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02802NWEN
|
Capacity: |
480
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/28/2015
|
|
|
Applicant: |
OGPW NO1 LIMITED
|
Applicant Address: |
6 Charter Gate
Clayfield Close
NORTHAMPTON
NN3 6QF
England
|
Address: |
Dovecote Farm
Turvey Road
Astwood
Newport Pagnell
MK16 9JX
England
|
|
Assumptions: Capacity: 480kW 0.48 MW, Thus over the month Capacity * 720 hours per month = 345.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 110 | 22.92% | Issued | | | | 92 | 19.17% | Issued | | | | 187 | 38.96% | Redeemed | | | | 164 | 34.17% | Redeemed | 01/01/2017 | | | 126 | 26.25% | Redeemed | 01/12/2016 - 31/12/2016 | 0 | 0 | 128 | 26.67% | Issued | 01/11/2016 - 30/11/2016 | 0 | 0 | 142 | 29.58% | Issued | 01/10/2016 - 31/10/2016 | 0 | 0 | 99 | 20.63% | Issued | Oct-16 | 0 | 0 | 99 | 20.63% | Pending Tr | Sep-16 | 0 | 0 | 120 | 25.00% | Issued | 01/09/2016 - 30/09/2016 | 0 | 0 | 120 | 25.00% | Issued | Aug-16 | 0 | 0 | 121 | 25.21% | Issued | Jul-16 | 0 | 0 | 108 | 22.50% | Issued | Jul-16 | 0 | 0 | 108 | 22.50% | Issued | Jun-16 | 0 | 0 | 67 | 13.96% | Issued | May-16 | 0 | 0 | 117 | 24.38% | Issued | Apr-16 | 0 | 0 | 110 | 22.92% | Issued | Mar-16 | 0 | 0 | 150 | 31.25% | Redeemed | Feb-16 | 0 | 0 | 185 | 38.54% | Redeemed | Jan-16 | 0 | 0 | 207 | 43.13% | Redeemed | Dec-15 | 0 | 0 | 276 | 57.50% | Redeemed | Nov-15 | 0 | 0 | 206 | 42.92% | Redeemed | Oct-15 | 0 | 0 | 90 | 18.75% | Redeemed | Sep-15 | 0 | 0 | 81 | 16.88% | Redeemed | Aug-15 | 0 | 0 | 4 | 0.83% | Redeemed | | | | 161 | 33.54% | Issued | | | | 128 | 26.67% | Issued | | | | 157 | 32.71% | Issued | | | | 103 | 21.46% | Issued | | | | 200 | 41.67% | Issued | | | | 156 | 32.50% | Issued | | | | 215 | 44.79% | Issued | | | | 101 | 21.04% | Issued | | | | 206 | 42.92% | Issued | | | | 107 | 22.29% | Issued |
|
Capacity: 1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|