Weston Town Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Weston Town Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, BA4 4SL    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: March 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 0
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Weston Town Farm Wanstrow Shepton Mallet BA4 4SL England

 Associated Companies.

Relationship Company (For: Weston Town )
FinanceTemporis Capital LLP

 DECC Data on this Project: Weston Town :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Weston Town: Wind :

Site Name: Weston Town Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02562NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 10/3/2014    
Applicant: Weston Town WT Limited
Applicant Address: Temporis Capital LLP Berger House 36-38 Berkeley Square London W1J 5AE England
Address: Weston Town Farm Wanstrow Shepton Mallet BA4 4SL England
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
76 15.83% Issued
50 10.42% Issued
138 28.75% Redeemed
113 23.54% Redeemed
01/01/2017 69 14.38% Redeemed
01/12/2016 - 31/12/2016 00 65 13.54% Issued
01/11/2016 - 30/11/2016 00 85 17.71% Issued
01/10/2016 - 31/10/2016 00 51 10.63% Issued
01/09/2016 - 30/09/2016 00 62 12.92% Issued
Sep-16 00 62 12.92% Issued
Aug-16 00 61 12.71% Issued
Jul-16 00 58 12.08% Issued
Jul-16 00 58 12.08% Issued
Jun-16 00 50 10.42% Issued
May-16 00 77 16.04% Issued
Apr-16 00 79 16.46% Issued
Mar-16 00 114 23.75% Redeemed
Feb-16 00 130 27.08% Redeemed
Jan-16 00 141 29.38% Redeemed
Dec-15 00 210 43.75% Redeemed
Nov-15 00 143 29.79% Redeemed
Oct-15 00 57 11.88% Redeemed
Sep-15 00 45 9.38% Redeemed
Aug-15 00 59 12.29% Redeemed
Jul-15 680 68 14.17% Redeemed
Jun-15 740 75 15.63% Redeemed
May-15 1640 164 34.17% Redeemed
Apr-15 760 76 15.83% Redeemed
Mar-15 1160 116 24.17% Redeemed
Feb-15 870 87 18.13% Redeemed
Jan-15 1340 133 27.71% Redeemed
Dec-14 1220 122 25.42% Redeemed
Nov-14 370 36 7.50% Redeemed
Oct-14 520 52 10.83% Redeemed
60 12.50% Issued
105 21.88% Issued
81 16.88% Issued
118 24.58% Issued
113 23.54% Issued
71 14.79% Issued
138 28.75% Issued
76 15.83% Issued
107 22.29% Issued
56 11.67% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350817

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School